Skip to main content
powered help
header-left header-center header-right
File #: 251140    Version:
Type: Resolution Status: In Council-Adoption
File created: 11/4/2025 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action:
Effective date:    
Title: Substitute resolution authorizing the City Comptroller to transfer funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the construction of the 16th Street Bridge over the Menomonee River with a total estimated cost increase for the project of $3,059,779.55, with an estimated Grantor share of $11,097,209.78 and an estimated City share of $(8,037,430.23).
Sponsors: THE CHAIR
Attachments: 1. 25C0773 SIGNED MOU with City of Milwaukee - 16th Street Bridge Project.pdf, 2. 2615-15-73_Bid Analysis_FC Potawatomi funding addition DB.pdf, 3. Resolution Certification 2615-15-73.pdf
Number
251140
Version
SUBSTITUTE 1
Reference
Sponsor
THE CHAIR
Title
Substitute resolution authorizing the City Comptroller to transfer funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the construction of the 16th Street Bridge over the Menomonee River with a total estimated cost increase for the project of $3,059,779.55, with an estimated Grantor share of $11,097,209.78 and an estimated City share of $(8,037,430.23).
Analysis
Substitute resolution authorizing the City Comptroller to transfer funds to the previously established projects for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the construction of the North Holton Street Bridge over the 16th Street Bridge over the Menomonee River with a total estimated cost increase for the project of $3,059,779.55 with an estimated Grantor share of $11,097,209.78, and an estimated City share of $(8,037,430.23).
Body
Whereas, Additional funds are, therefore, necessary to complete the construction of the projects; now, therefore be it

Resolved, By the Common Council of the City of Milwaukee, that the City Comptroller is hereby authorized to transfer fund to the project grant chart field as follows:

Project Grant Value
State ID 2615-15-73
BR320221710 / ST320221710
South 16th Street Bridge
Over Menomonee River

City Share Non-Assessable Fund Structure
BR300250000
Fund 0303
$(8,037,430.23)

Grantor Reimbursable Fund Structure
SP032500100
Fund 0306
$11,097,209.78

Grantor Non-Reimbursable
$0

City Share Non-Assessable Paving Fund
ST320250000
Fund 0333
$0

Grantor Reimbursable
SP032250100
Fund 0306
$0

Grantor Non-Reimbursable
$ 0

Total Project Construction $22,496,589.08

Previously Authorized for project construction: $19,436,809.53
Current estimated cost of total project including this resolution $24,252,489.08
Original estimated cost of total project (Resolution ...

Click here for full text