Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,045,700 for a total estimated cost of $1,105,000.
Sponsors: THE CHAIR
Indexes: ASSESSMENTS, PUBLIC IMPROVEMENTS
Attachments: 1. Signed letter.pdf, 2. signed ad.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/25/20201 MAYOR SIGNED   Action details Meeting details Not available
6/16/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
6/3/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 44th St. – W. Villard Ave. to W. Custer Ave. (ST211160102) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding ( 7’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 11th Aldermanic District W. Warnimont Ave. – W. Eden Pl. to S. Massachusetts Ave. (ST211120117) Asphalt pavement resurfacing. Ald. Borkowski moved approval. (Prevailed 5-0) 15th Aldermanic District N. 23rd St. – W. Center St. to W. Locust St. (ST211190137) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8.5’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
5/27/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
200123
Version
SUBSTITUTE 1
Reference
141248
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,045,700 for a total estimated cost of $1,105,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,045,700. The total estimated cost of these projects is $1,105,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. 44th St. - W. Villard Ave. to W. Custer Ave. (ST211160102) File Number 141248: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding ( 7’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $27,300; Nonassessable Reconstruction Paving Fund -- $275,000). The total estimated cost of this project including the requested amount is $330,000. This project is anticipated to be completed during the 2020 construction season.

11th Aldermanic District

W. Warnimont Ave. - W. Eden Pl. to S. Massachusetts Ave. (ST211120117) Asphalt pavement resurfacing. File Number 091621: Nonassessable Reconstruction Paving Fund -- $60,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2020 construction sea...

Click here for full text