powered help
header-left header-center header-right
File #: 240759    Version: 0
Type: Plan Commission Resolution Status: In Committee
File created: 9/18/2024 In control: CITY PLAN COMMISSION
On agenda: Final action: 9/30/2024
Effective date:    
Title: Resolution approving updates to the lighting along the Riverwalk on the east side of the Milwaukee River, from the Clybourn Street Bridge south to a point approximately 200 feet north of the Water Street Bridge relative to the Historic Third Ward Riverwalk Site Plan Review Overlay Zone (SPROZ) established by Section 295-91.0021 of the former Milwaukee Code, in the 4th Aldermanic District.
Sponsors: THE CHAIR
Attachments: 1. Exhibit A, 2. CPC Staff Report, 3. CPC Resolution
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
9/30/20240 CITY PLAN COMMISSION APPROVED

Minutes note: Ms. Connelly presented. Appearing: Paul Schwartz, BID #2 Executive Director Kendall Breunig, BID #2 Board Member BID #2 is proposing to update the lighting along a stretch of Riverwalk that is operated and maintained by the BID, within the Historic third Ward Riverwalk Site Plan Review Overlay Zone (SPROZ). The project includes the installation of 30 light poles along the subject stretch of Riverwalk, and will utilize 5 different mounting techniques to address the existing structure. Vice-chair Nemec moved approval, seconded by member Sas-Perez. (Prevailed 4-0)
Pass4:0 Action details Meeting details Video Video
9/18/20240 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

240759

Version

ORIGINAL

Reference

 

Title

Resolution approving updates to the lighting along the Riverwalk on the east side of the Milwaukee River, from the Clybourn Street Bridge south to a point approximately 200 feet north of the Water Street Bridge relative to the Historic Third Ward Riverwalk Site Plan Review Overlay Zone (SPROZ) established by Section 295-91.0021 of the former Milwaukee Code, in the 4th Aldermanic District.

 

Analysis

This resolution approves the lighting proposal along the Riverwalk segment from the Clybourn Street Bridge south to a point approximately 200 feet north of the Water Street Bridge, which will be placed beyond the property line, within the public waterway. 

 

Body

 

Requestor

City Plan Commission

 

Drafter

Chris Lee

9/18/24