powered help
header-left header-center header-right
File #: 131474    Version:
Type: Resolution Status: Passed
File created: 2/11/2014 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/4/2014
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $352,000 for a total estimated cost of these projects being $4,399,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Number
131474
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $352,000 for a total estimated cost of these projects being $4,399,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $352,000 with the total cost estimated to be $4,399,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
N. 27th St. - W. Villard Ave. to a point 600 feet m/l north of W. Silver Spring Dr. (ST211060102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $12,000, Additional Funds).  The total estimated cost for this project including the requested amount is $510,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 38th St. - W. Custer Ave. to W. Sheridan Ave. (ST211140112):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $7,000, Additional Funds).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
2nd Aldermanic District
 
N. 87th St. - W. Silver Spring Dr. to W. Fond du Lac Ave. (ST211150112):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2015 construction season.
 
9th Aldermanic District
 
W. Calumet Rd. - N. 76th St. to N. 91st St. (ST211150113):  Paving the roadway with asphalt.  Rural cross section.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Woolworth Ave. - N. Sherman Blvd. to N. 51st St. (ST211040107):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $380,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Woolworth Ave. - 400 feet m/l west of N. 51st St. to 200 feet m/l west of N. 56th St. (ST211150104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2015 construction season.
 
10th Aldermanic District
 
W. Nash St. - N. 62nd St. to a point 150 feet m/l west of N. 64th St. (ST211080104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000, Additional Funds).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 63rd St. - W. Center St. to a point 300 feet m/l north of W. Center St. (ST211050127):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 63rd St. - W. Nash St. to a point 450 feet m/l north of W. Nash St. (ST211070101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2015 construction season.
 
N. 64th St. - W. Nash St. to a point 450 feet m/l north of W. Nash St. (ST211070102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2015 construction season.
 
11th Aldermanic District
 
S. 82nd St. - W. Morgan Ave. to W. Holt Ave. (ST211150110):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 94th St. - W. Howard Ave. to 600 feet m/l north of W. Howard Ave. (ST211150111):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2015 construction season.
 
12th Aldermanic District
 
E. Greenfield Ave. - the Kinnickinnic River to S. 1st St. (ST211130136):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $800,000.  This project is anticipated to be completed during the 2014 construction season.
 
13th Aldermanic District
 
W. Wanda Ave. - A point 120 feet m/l west of S. Melinda St. to S. Honey Creek Dr. (ST211070152):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 2nd St. - W. Edgerton Ave. to a point 800 feet m/l north of W. Vogel Ave. (ST211150106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 16th St. - W. Edgerton Ave. to a point 300 feet m/l north of W. Holmes Ave. (Including W. Vogel Ave.) (ST211150107):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 19th St. - W. Edgerton Ave. to a point 100 feet m/l north of W. Halsey Ave. (ST211150108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 22nd Pl. - W. Mallory Ave. to W. Clayton Crest Ave. (ST211060118):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 25th St. - W. Vogel Ave. to W. Halsey Ave. (ST211150105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 26th St. - A point 300 feet m/l south of W. Denis Ave. to W. Grange Ave. (ST211150109):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $94,000.  This project is anticipated to be completed during the 2015 construction season.
 
14th Aldermanic District
 
Access Road (west of S. Lincoln Memorial Dr.) - S. Superior St. to S. Carferry Dr. (ST210140101):  Concrete alley-type pavement construction, place some abutting walk, grading, and storm drainage facilities where necessary.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Stewart St. - S. Marina Dr. to S. Hilbert St. (ST21100147):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2015 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Apr 8
02/14/2014