File #: 201063    Version:
Type: Resolution Status: Passed
File created: 11/24/2020 In control: COMMON COUNCIL
On agenda: Final action: 12/15/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,210,800 for a total estimated cost of $1,285,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Proof of Publication
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/28/20201 MAYOR SIGNED   Action details Meeting details Not available
12/15/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
12/2/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 7th Aldermanic District W. Vienna Ave. – N. 35th St. to N. 41st St. (ST211140134) Concrete pavement reconstruction and asphalt pavement resurfacing, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary. Ald. Borkowski moved approval. (Prevailed 4-0) N. 37th St. – W. Marion St. to W. Congress St. (ST211180192) Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding (8’ width of tree border area), grading, and tree removal where necessary. Ald. Perez moved approval. (Prevailed 4-0) 15th Aldermanic District N. 22nd St. – W. Meinecke Ave. to W. Wright St. (ST211190135) Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary. Ald. Stamper moved approval. (Prevailed 4-0)
Pass4:0 Action details Meeting details Video Video
11/24/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

 

Number

201063

Version

SUBSTITUTE 1

Reference

120856

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,210,800 for a total estimated cost of $1,285,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,210,800.  The total estimated cost of these projects is $1,285,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

7th Aldermanic District

 

W. Vienna Ave. - N. 35th St. to N. 41st St. (ST211140134) File Number 120856:  Concrete pavement reconstruction and asphalt pavement resurfacing, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $16,100; Nonassessable Reconstruction Paving Fund  -- $675,000).   The total estimated cost of this project including the requested amount is $740,000. This project is anticipated to be completed during the 2021 construction season.

 

N. 37th St. - W. Marion St. to W. Congress St.  (ST211180192) File Number 171709:  Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding (8’ width of tree border area), grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $19,700; Nonassessable Reconstruction Paving Fund  -- $175,000).   The total estimated cost of this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2021 construction season.

 

15th Aldermanic District

 

N. 22nd St. - W. Meinecke Ave. to W. Wright St. (ST211190135) File Number 190148:   Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (8’ width of tree border area), grading, and tree removal where necessary.  (Assessable Reconstruction Paving Fund -- $20,000; Nonassessable Reconstruction Paving Fund  -- $305,000).   The total estimated cost of this project including the requested amount is 335,000. This project is anticipated to be completed during the 2021 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  W. Vienna Ave. (ST211140134), N. 37th St. (ST211180192),   N. 22nd St. (ST211190135) will be billed after January 1, 2023, but not before 12 months after the project contract has been completed.

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 5

11/30/2020