File #: 031100    Version:
Type: Resolution Status: Passed
File created: 11/25/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/19/2003
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, SIDEWALK IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. Cover Letter.pdf, 3. Sub1Fiscal Note.pdf, 4. Corrected Fiscal Note.pdf
 
Number
031100
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
N. 26th St. - W. Ruby Ave. to W. Glendale Ave. (ST211040104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000 additional funds.)
 
Alley between W. Courtland Ave., W. Hampton Ave., N. 41st St., and N. 42nd St. (ST212050101):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $3,000)
 
4th Aldermanic District
 
N. James Lovell St. - W. Wells St. to W. State St. (ST211040102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $11,000 additional funds)
 
5th Aldermanic District
 
N. 88th St. - W. Burleigh St. to W. Concordia Ave. (ST211030108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,200 additional funds)
 
6th Aldermanic District
 
Alley between E Center St., N. Humboldt Ave., C.M.C. Real Estate Corporation Right of Way (ST212050113):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $3,000)
 
7th and 17th Aldermanic Districts
 
N. 37th St. - W. Meinecke Ave. to W. Clarke St. (ST211050113):  Replace all concrete curb and gutter. (Nonassessable Reconstruction Paving Fund -- $7,000)
 
12th Aldermanic District
 
Alley between W. Greenfield Ave., W. Orchard St., S. 20th St., and S. 21st St. (ST212050102):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $1,500)
 
Alley between W. Lapham Blvd., W. Orchard St., S. 13th St., and S. 14th St. (Omit East-West Leg) (ST212050104):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $2,000)
 
13th Aldermanic District
 
W. Goldcrest Ave. - A point approximately 130 feet m/l east of S. 27th St. to S. 27th St. (ST211040127):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $2,500)
 
14th Aldermanic District
 
S. Lenox St. - E. Morgan Ave. to E. Holt Ave. (ST211040119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000 additional funds)
 
S. St. Clair St. - E. Potter Ave. to E. Conway Ave. (ST211050112):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9,000)
 
Alley between S. Lenox St., E. Lincoln Ave., E. Linus St., and S. Woodward St. (Northerly East-West Leg) (ST212050103):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $8,000)
 
15th Aldermanic District
 
W. Green Tree Rd. - N. 115th St. to a Point 500 feet m/l west of N. 115th St. (ST210010102): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000)
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
mld:lk
apr5
12/03/03