File #: 190283    Version:
Type: Resolution Status: Passed
File created: 5/29/2019 In control: COMMON COUNCIL
On agenda: Final action: 6/18/2019
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,153,600 for a total estimated cost of $1,197,100.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Signed Ad.pdf, 2. Signed letter.pdf, 3. Cycle 13 Official Ad.pdf, 4. Proof of Publication
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/28/20191 MAYOR SIGNED   Action details Meeting details Not available
6/18/20191 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
6/5/20191 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 37th St. - W. Florist Ave. to W. Douglas Ave. (ST211130123) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 4-0) 6th Aldermanic District N. 12th St. - W. Concordia Ave. to W. Keefe Ave. (ST211180222) Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 4-0) N. 16th St. - W. Atkinson Ave. to W. Capitol Dr. (ST211160164) Install traffic calming speed hump(s). Jacqueline Tucker 3921 N 16th St stated she is in support because there is speeding. Alberta Autry 3911 N 16th St stated she is in support. Mary Lowe 3933 N 16th St stated she is in favor because of traffic. Hayden Pearson 3914 N 16th St stated there is speeding at all times of day. Ald. Kovac moved approval. (Prevailed 5-0) N. 21st St. - W. Nash St. to W. Vienna Ave. (ST211180269) Install traffic calming speed hump(s). Ald. Murphy moved approval. (Prevailed 5-0) 8th Aldermanic District S. 25th St. - W. Greenfield Ave. to W. Scott St. (ST211180273) Install traffic calming speed hump(s). Ald. Murphy moved approval. (Prevailed 5-0) 12th Aldermanic District S. 11th St. - W. Harrison Ave. to W. Lincoln Ave. (ST211150124) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (4’ width of tree border area), and grading. Tammy Lawrence 2443 S 11th St stated her neighbors don’t speak English and her street needs to be repaired but everyone should be paying the same amount of money. Arthur Reyes 2544 S 11th St stated he doesn’t think the sidewalks need replacing, but the streets get flooded when it rains a lot. Paola Campos 2519 S 11th St stated her sidewalk doesn’t need replacing, and her assessment is too high. Ald. Kovac moved approval. (Prevailed 5-0) 15th Aldermanic District N. 41st St. - W. Meinecke Ave. to W. Wright St. (ST211190114) Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
5/29/20190 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

190283

Version

SUBSTITUTE 1

Reference

110831

 

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,153,600 for a total estimated cost of $1,197,100.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,153,600.  The total estimated cost of these projects is $1,197,100.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 37th St. - W. Florist Ave. to W. Douglas Ave. (ST211130123) File Number 110831:  Asphalt pavement resurfacing, replace curb and gutter,sidewalk and driveway approaches where necessary, sodding (7’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $26,500; Nonassessable Reconstruction Paving Fund -- $305,000). The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2019 construction season. 

 

6th Aldermanic District

 

N. 12th St. - W. Concordia Ave. to W. Keefe Ave.  (ST211180222)  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $11,300; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $13,300.  This project is anticipated to be completed during the 2019 construction season.

 

N. 16th St. - W. Atkinson Ave. to W. Capitol Dr.  (ST211160164)  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,400; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $8,400.  This project is anticipated to be completed during the 2019 construction season.

 

N. 21st St. - W. Nash St. to W. Vienna Ave. (ST211180269)  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $4,400; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $6,400.  This project is anticipated to be completed during the 2019 construction season.

 

8th Aldermanic District

 

S. 25th St. - W. Greenfield Ave. to W. Scott St.  (ST211180273) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,200; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $9,200.  This project is anticipated to be completed during the 2019 construction season.

 

12th Aldermanic District

S. 11th St. - W. Harrison Ave. to W. Lincoln Ave.  (ST211150124)  File Number 131585:  Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (4’ width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $40,000; Nonassessable Reconstruction Paving Fund -- $735,000). The total estimated cost for this project including the requested amount is $800,000.  This project is anticipated to be completed during the 2019 construction season

 

15th Aldermanic District

 

N. 41st St. - W. Meinecke Ave. to W. Wright St. (ST211190114) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,800; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $9,800.  This project is anticipated to be completed during the 2019 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects: N. 37th St. (ST211130123);  N. 12th St. (ST211180222); N. 16th St. (ST211160164); N. 21st St. (ST211180269); S. 25th St. (ST211180273); S. 11th St. (ST211150124); N. 41st St. (ST211190114) will be billed after January 1, 2021, but not before 12 months after the project contract has been completed;

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 13

5 /31/2019