File #: 030748    Version:
Type: Resolution Status: Passed
File created: 9/23/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/14/2003
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. cover letter.pdf, 3. Sub Fiscal Note.pdf
 
Number
030748
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
W. Glendale Ave. - N. 26th St. to N. 27th St. (ST211040122):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000)
 
3rd Aldermanic District
 
N. Frederick Ave. - E. Linnwood Ave. to E. Kenwood Blvd. (ST211050101):  Removing and replacing all curb and gutter.  Removing and replacing concrete sidewalk and driveway approaches where necessary.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $11,000)
 
6th and 17th Aldermanic District
 
W. Walnut St. - N. 6th St. to N. 12th St. (ST211050108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $35,000)
 
7th Aldermanic District
 
W. North Ave. - W. Fond du Lac Ave. to N. 25th St. (ST211050107):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $18,000)
 
8th Aldermanic District
 
S. 29th St. - W. Montana St. to W. Cleveland Ave. (ST21110140):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000)
 
S. 32nd St. - W. Drury Ln. to W. Oklahoma Ave. (ST211050104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000)
 
11th Aldermanic District
 
W. Duluth Ave. - S. Massachusetts Ave. to S. 74th St. (ST211050105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000)
 
W. Euclid Ave. - S. 38th St. to S. 39th St. (ST211050106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,500)
 
Alley between W. Van Beck Ave., S. 50th St., S. 51st St., and the Wisconsin Electric Right of Way (ST212050112):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $12,000)
 
12th Aldermanic District
 
Alley between S. Cesar E. Chavez Dr., W. Mineral St., W. National Ave., and S. 17th St. (ST21200119):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000)
 
13th Aldermanic District
 
S. 18th St. - W. Clayton Crest Ave. to W. Edgerton Ave. (ST211050102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $12,000)
 
S. 30th St. - W. Parnell Ave. to W. Wanda Ave. (ST211020105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
 
W. Wanda Ave. - S. 29th St. to S. Marilyn Ave. (ST211020119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
Alley between S. Avalon St., W. Granada St., S. 13th St., and S. 15th St. (ST212050105):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
Alley between W. Bolivar Ave., S. Louisiana Ave., W. Whitaker Ave., and S. 20th St. (North-South Leg) (ST212050107):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $3,500)
 
14th Aldermanic District
 
S. 19th St. - W. Euclid Ave. to W. Oklahoma Ave. (ST211050103):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $11,000)
 
Alley between S. Aldrich St., E. Bay St., E. Lincoln Ave., and S. Woodward St. (Northerly East-West Leg and Northerly half of North-South Leg) (ST212050106):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $14,000)
 
Alley between E. Dover St., S. Howell Ave., S. Kinnickinnic Ave., E. Potter Ave., and E. Russell Ave. (Westerly North-South Leg, Westerly East-West Leg, and Center North-South Leg) (ST212050108):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000)
 
Alley between E. Euclid Ave., S. Griffin Ave., S. Howell Ave., and E. Ohio Ave. (ST21200128):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000)
 
Alley between E. Euclid Ave., S. Hanson Ave., S. Nevada St., and E. Oklahoma Ave. (ST212050109):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000)
 
Alley between S. Kinnickinnic Ave., S. Lenox Ave., S. Pine Ave., and E. Potter Ave. (ST212050110):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
Alley between S. Pine Ave., E. Potter Ave., and E. Russell Ave. (ST212050111):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $11,000)
 
15th Aldermanic District
 
N. 124th St. - W. Ruby Ave. to W. Hampton Ave. (Sponsored by Wauwatosa) (ST211040108):  Right of way acquisition (Nonassessable Reconstruction Paving Fund -- $10,000)
 
16th Aldermanic District
 
W. Adler St. - S. 84th St. to S. 92nd St. (ST211050109):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $18,000)
 
S. 92nd St. - A Point 900 feet m/l south of W. Adler St. to East-West Freeway (ST21100122):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $13,000)
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 