File #: 171478    Version:
Type: Resolution Status: Passed
File created: 1/17/2018 In control: COMMON COUNCIL
On agenda: Final action: 2/6/2018
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $50,000 for a total estimated cost of these projects being $1,525,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS

 

Number

171478

Version

Substitute 1

Sponsor

THE CHAIR

Title

Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $50,000 for a total estimated cost of these projects being $1,525,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $50,000 with the total cost estimated to be $1,525,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

10th Aldermanic District

 

N. 60th St.-W. Wells St. to W. Valley Forge Dr. (Sponsored by the city of Wauwatosa) (ST211190101).  Concrete pavement reconstruction replace all curb and gutter, replace sidewalk and driveway approaches as necessary, sodding and grading.  (Non-assessable Reconstruction Paving Fund--$5,000).  The total cost of this project is estimated to be $125,000.  This project is anticipated to be completed during the 2019 - 2020 construction season. 

 

Various Aldermanic Districts

 

Sidewalk Replacement - Area Wide 2018 (ST230180155): Laying concrete walk.  Doing all necessary grading pertaining to said work.  (Nonassessable Sidewalk Reconstruction Paving Fund -- $ 30,000).  The total cost of this project is estimated to be $1,000,000.  This project is anticipated to be completed during the 2018 construction season. 

 

Sidewalk Replacement - Scattered Sites 2018 (ST230180156): Laying concrete walk.  Doing all necessary grading pertaining to said work.

 

(Nonassessable Sidewalk Reconstruction Paving Fund -- $15,000).  The total cost of this project is estimated to be $400,000.  This project is anticipated to be completed during the 2018 construction season. 

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That if surplus 2017 funds become available, some or all of the 2018 sidewalk replacement projects (ST230180155) and (ST230180156) may be funded with the 2017 funds; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Dee La Belle

Apr 7

01 /17/2018