File #: 161561    Version:
Type: Resolution Status: Passed
File created: 3/1/2017 In control: COMMON COUNCIL
On agenda: Final action: 3/28/2017
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $915,000 for a total estimated cost of $1,080,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Transmittal Letter, 2. Official Notice, 3. Notice Published on 4-13-17
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/13/20171 CITY CLERK PUBLISHED   Action details Meeting details Not available
4/6/20171 MAYOR SIGNED   Action details Meeting details Not available
3/28/20171 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
3/8/20170 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works 1st Aldermanic District N. 52nd St. - W. Villard Ave. to W. Silver Spring Dr. (ST211140109): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9-foot width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 5-0) 11th Aldermanic District Alley between W. Cleveland Ave., W. Montana St., S. 49th St., and S. 50th St. (ST212060106): Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ald. Bauman moved approval. (Prevailed 5-0) 13th Aldermanic District S. 21st St. - W. Van Norman Ave. to W. Whitaker Ave. (ST211150160): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 5-0) 14th Aldermanic District S. Brust Ave. - E. Euclid Ave. to E. Oklahoma Ave. (ST211150121): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5-foot and 8-foot width of tree border area), and grading. Ald. Kovac moved approval. (Prevailed 5-0) S. Clement Ave. at E. Dakota St. (ST211170173): Install traffic calming speed table. Daniel Hansen 2816 S Clement Ave stated he would prefer stop signs instead of a speed table and he stated the street is in dire need of repair. Ald. Donovan moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
3/1/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

161561

Version

SUBSTITUTE 1

Reference

120112

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $915,000 for a total estimated cost of $1,080,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $915,000.  The total estimated cost of these projects is $1,080,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 52nd St. - W. Villard Ave. to W. Silver Spring Dr. (ST211140109) File Number 120112:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $95,000; Nonassessable Reconstruction Paving Fund -- $400,000).  The total estimated cost for this project including the requested amount is $530,000.  This project is anticipated to be completed during the 2017 construction season.

 

11th Aldermanic District

 

Alley between W. Cleveland Ave., W. Montana St., S. 49th St., and S. 50th St. (ST212060106) File Number 091341:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary.  (Assessable Alley Paving Fund -- $52,000; Nonassessable Alley Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2017 construction season.

 

13th Aldermanic District

 

S. 21st St. - W. Van Norman Ave. to W. Whitaker Ave. (ST211150160) File Number 140146:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $13,000; Nonassessable Reconstruction Paving Fund -- $120,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2017 construction season.

 

14th Aldermanic District

 

S. Brust Ave. - E. Euclid Ave. to E. Oklahoma Ave. (ST211150121) File Number 131585:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5-foot and 8-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $20,000; Nonassessable Reconstruction Paving Fund -- $125,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017 construction season.

 

S. Clement Ave. at E. Dakota St. (ST211170173):  Install traffic calming speed table.  (Assessable Reconstruction Paving Fund -- $25,000; Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2017 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  N. 52nd St. (ST211140109), Alley W. Cleveland Ave. (ST212060106), S. 21st St. (ST211150160), S. Brust Ave. (ST211150121), and S. Clement Ave. (ST211170103) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz