File #: 071572    Version:
Type: Resolution Status: Passed
File created: 3/18/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/9/2008
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,165,100 for a total estimated cost of $3,588,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Official Notice 107, 3. Official Notice Number 107 ACTIONS, 4. Petition submitted by Mr Achenbach, 5. Sub 1 Fiscal Note, 6. Hearing notice list, 7. Notice Published on 4-30-08
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/30/20082 CITY CLERK PUBLISHED   Action details Meeting details Not available
4/15/20082 MAYOR SIGNED   Action details Meeting details Not available
4/9/20082 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
4/9/20081 COMMON COUNCIL AMENDED

Minutes note: Ald. Bauman moved to amend File #071572 by adding the following project: In the 9th Aldermanic District N. Wausaukee Rd. (North 124th St.); W. County Line Rd. to W. Mequon Rd. (Sponsored by the City of Mequon)(ST320051801) (2697-05-00) File Number 050157: Asphalt pavement reconstruction; pulverize existing roadway, reconstruct with asphalt pavement and gravel shoulders.( Grantor Non-Reimbursable Paving Fund--$135,000; City Share Non-Assessable Paving Fund--$20,000; City Share Assessable Paving Fund--$15,000). These funds are to be transferred to the construction account (ST320051810)(2697-05-70). Previously authorized for construction: $0.00; Current estimated cost of the total project including this resolution: $2,470,000.00. Original estimated cost of the total project: Unknown-City of Mequon lead agent; This project is anticipated to be completed during the 2008 construction season. (Please note: The dollar amounts in the title also changed as follows: $995,100 to $1,165,100 and $1,118,800 to $3,588,800)
Pass13:0 Action details Meeting details Not available
4/9/20082 COMMON COUNCIL ADOPTED

Minutes note: As amended.
Pass13:0 Action details Meeting details Not available
3/26/20081 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
3/26/20081 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
3/20/20080 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
3/18/20080 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

071572

Version

Substitute 2

Reference

070660

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,165,100 for a total estimated cost of $3,588,800.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,165,100.  The total estimated cost of these projects is $3,588,800.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

3rd Aldermanic District

 

E. Locust St. - N. Lake Dr. to N. Maryland Ave. (ST211060116) File Number 070660:  Asphalt pavement resurfacing, replace all curb and gutter, narrowing the roadway from 40 feet to 36 feet, sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary.  Install traffic calming devices. (Assessable Reconstruction Paving Fund -- $47,000; Nonassessable Reconstruction Paving Fund -- $575,000).  The total estimated cost for this project including the requested amount is $690,900.  This project is anticipated to be completed during the 2008 construction season.

 

9th Aldermanic District

 

N. Wausaukee Rd.(North 124th St.); W. County Line Rd. to W. Mequon Rd. (Sponsored by the City of Mequon)(ST320051801) (2697-05-00) File Number 050157: Asphalt pavement reconstruction; pulverize existing roadway, reconstruct with asphalt pavement and gravel shoulders.( Grantor Non-Reimbursable Paving Fund -- $135,000; City Share Non-Assessable Paving Fund -- $20,000; City Share Assessable Paving Fund--$15,000).

 

These funds are to be transferred to the construction account (ST320051810)(2697-05-70).

 

Previously authorized for construction:  $0.00

Current estimated cost of the total project including this resolution: $2,470,000.00.

Original estimated cost of the total project: Unknown-City of Mequon lead agent

This project is anticipated to be completed during the 2008 construction season.

 

 

10th Aldermanic District

 

S. 55th St. - W. Morgan Ave. to W. Oklahoma Ave. (ST211010155) File Number 070489:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $115,000; Nonassessable Reconstruction Paving Fund -- $180,000).  The total estimated cost for this project including the requested amount is $332,000.  This project is anticipated to be completed during the 2008 construction season.

 

13th Aldermanic District

 

S. 2nd St. - W. Howard Ave. to W. Tripoli Ave. (ST211020125) File Number 070368:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $2,800; Nonassessable Reconstruction Paving Fund -- $33,000).  The total estimated cost for this project including the requested amount is $45,600.  This project is anticipated to be completed during the 2008 construction season.

 

14th Aldermanic District

 

S. Shore Dr. - E. Ontario St. to E. Russell Ave. (ST211080114) File Number 070660:  Replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $12,300; Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $50,300.  This project is anticipated to be completed during the 2008 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects: E. Locust St. (ST211060116), N. Wausaukee Rd.(North 124th St.)(ST320051801), S. 55th St. (ST211010155), S. 2nd St. (ST211020125), and S. Shore Dr. (ST211080114) will be billed after January 1, 2010, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following projects be deleted from the 2008 Paving Program:

 

9th Aldermanic District

 

N. 83rd St. - W. Brentwood Ave. to W. Clovernook St. (ST211070105) File Number 060952

 

N. Burbank Ave. - W. Casper St. to W. Spokane St. (ST211060125) File Number 060842

 

14th Aldermanic District

 

Alley between W. Dakota St., S. 14th St., S. 15th St., and the Union Pacific Railroad Company (ST212070101) File Number 051328.

 

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

afr9

04/09/2008