powered help
header-left header-center header-right
File #: 081488    Version:
Type: Resolution Status: Passed
File created: 3/3/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/25/2009
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $7,825,000 for a total estimated cost of these projects being $8,360,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter.pdf, 2. Fiscal Note, 3. Hearing Notice List, 4. Early Sign Letter

Number

081488

Version

SUBSTITUTE 1

Reference

070081

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $7,825,000 for a total estimated cost of these projects being $8,360,000.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $7,825,000.  The total estimated cost of these projects is $8,360,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

3rd Aldermanic District

 

N. Bartlett Ave. - E. Lafayette Pl. to E. North Ave. (SM495070044) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $186,000).  The total estimated cost for this project including the requested amount is $206,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Bartlett Ave. - E. North Ave. to 95 feet m/l north of E. North Ave. (SM495070105) File Number 080237: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $153,000).  The total estimated cost for this project including the requested amount is $163,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Cambridge Ave. - E. Irving Pl. to E. North Ave. (SM495070050) File Number 070081: Combined sewer relay and lining. (Nonassessable Sewer Maintenance Relay Fund -- $1,487,000).  The total estimated cost for this project including the requested amount is $1,500,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Newhall St. - E. Thomas Ave. to E. Bradford Ave. (SM495070054) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $287,000).  The total estimated cost for this project including the requested amount is $308,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Newhall St. - E. North Ave. to E. Thomas Ave. (SM495070053) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $210,000).  The total estimated cost for this project including the requested amount is $222,000.  This project is anticipated to be completed during the 2009 construction season.

 

E. Thomas Ave. - 250 feet m/l west of N. Newhall St. to N. Newhall St. (SM495070046) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $93,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2009 construction season.

 

E. Thomas Ave. - N. Oakland Ave. to N. Bartlett Ave. (SM495070049) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $79,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2009 construction season.

 

E. Woodstock Pl. - N. Oakland Ave. to N. Farwell Ave. (SM495070056) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $212,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2009 construction season.

 

6th Aldermanic District

 

N. Richards St. (Elimination of Railroad Crossing) - E. Keefe Ave. to a point 300 feet m/l north of E. Keefe Ave. (ST211080126) File Number 071054: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (3-foot width of tree border area), grading, and tree removal where necessary. (Nonassessable Reconstruction Paving Fund -- $50,000).  The total estimated cost for this project including the requested amount is $58,000.  This project is anticipated to be completed during the 2009 construction season.

 

8th Aldermanic District

 

S. Layton Blvd. - A point south of W. National Ave. to W. National Ave. (ST211090127) File Number 080387: Median revision. (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $33,000.  This project is anticipated to be completed during the 2009 construction season.

 

10th Aldermanic District

 

W. Roosevelt Dr. - N. 54th St. to N. 60th St. (SM495070148) File Number 081186: Relay sanitary sewer and sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $1,090,000 Additional Funds).  The total estimated cost for this project including the requested amount is $1,162,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 43rd St. - W. Juneau Ave. to W. Martin Dr. (SM495080028) File Number 080237: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $83,000).  The total estimated cost for this project including the requested amount is $93,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 54th St. - 300 feet m/l north of W. Wells St. to W. Wells St. (SM495080059) File Number 080809: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $82,000).  The total estimated cost for this project including the requested amount is $92,000.  This project is anticipated to be completed during the 2009 construction season.

 

12th Aldermanic District

 

W. Lapham Blvd. - S. 2nd St. to S. 4th St. (SM495090009) File Number 081489: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $260,000).  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 2nd St. - W. Lapham Blvd. to W. Mitchell St. (SM495090012) File Number 081489: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $113,000).  The total estimated cost for this project including the requested amount is $113,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 3rd St. - W. Lapham Blvd. to W. Mitchell St. (SM495080064) File Number 081489: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $170,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2009 construction season.

 

13th Aldermanic District

 

Oak Creek Channel - W. College Ave. to W. Ramsey Ave. (SM493090102) File Number 081489: Cattail removal from Oak Creek Channel. (Nonassessable TSS Reduction Fund -- $25,000).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2009 construction season.

 

City Wide

 

2009 Sanitary Manhole Rehabilitation (SM494090102) File Number 081268: (Nonassessable Sewer Maintenance I & I Reduction Fund -- $2,385,000).  The total estimated cost for this project including the requested amount is $2,400,000.  This project is anticipated to be completed during the 2009 construction season.

 

Various Locations

 

Concrete and crack repair for various bridges. (BR100090103) File Number 061498: (City Share Nonassessable Structure Fund -- $750,000).  The total estimated cost for this project including the requested amount is $750,000.  This project is anticipated to be completed during the 2009 construction season.

 

Sealcoating of various streets by contract. (ST211090132) File Number 080911: (Nonassessable Reconstruction Paving Fund -- $50,000 Additional Funds).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2009 construction season.

 

City of Greenfield

 

W. Cold Spring Rd. - 450 feet east of S. 34th St. to 100 feet east of S. 34th St. (WT410091013) File Number 081489: Water service alterations. (Nonassessable Water Fund -- $35,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2009 construction season.

 

; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Nfr 9

03/05/09