File #: 011577    Version:
Type: Resolution Status: Passed
File created: 3/5/2002 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/26/2002
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, SANITARY SEWERS, SEWER IMPROVEMENTS, SEWERS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS
Attachments: 1. Infr. Serv. Div. Cover Letter.pdf, 2. FISCAL NOTE.pdf
 
Number
011577
Version
SUBSTITUTE 1
Reference
901670
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
 
3rd Aldermanic District
 
N. Marshall St. - E. Hamilton St. to E. Land Pl. (ST21110138) File Number 901670:  Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $18,000; Nonassessable Reconstruction Paving Fund -- $26,800)
 
Alley between N. Cambridge Ave., N. Newhall St., E. North Ave., and E. Windsor Pl. (ST21210106) File Number 961238:  Concrete alley pavement reconstruction, replace some abutting sidewalk or driveway approach, and grading. (Assessable Alley Paving Fund -- $27,100; Nonassessable Alley Paving Fund -- $29,600)
 
6th Aldermanic District
 
N. Hubbard St. - E. Brown St. to E. North Ave. (ST211020117) File Number 871700:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $117,500; Nonassessable Reconstruction Paving Fund -- $132,300)
 
13th Aldermanic District
 
W. Howard Ave. (Excluding Structure) - S. 13th St. to S. 27th St. (ST32001601) (2395-10-70) File Number 000718:  Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (State or Federal Funds -- $1,860,000; State/Federal Grantor Paving Fund -- $270,000; Assessable State Aid Fund -- $153,100; Nonassessable State Aid Fund -- $295,500). These funds are to be transferred to the construction account ST32001610.
 
15th Aldermanic District
 
N. 119th St. - A point north of W. Langlade St. to W. Kaul Ave. (SW170020106) File Number 011575:  New sanitary sewer. (Assessable New Sewer Fund -- $7,280; Nonassessable New Sewer Fund -- $27,720)
 
;and
 
Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and
 
Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it
 
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
 
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
 
Further Resolved, That the City Engineer and the Commissioner of Public Works are hereby authorized to negotiate and enter into an agreement with the State of Wisconsin, Department of Transportation for the City to undertake construction management duties on the following project: W. Howard Ave. (Excluding Structure) - S. 13th St. to S. 27th St. (ST32001601) (2395-10-70); and, be it
 
Further Resolved, That the City Engineer is authorized and directed to approve and make periodic payments to the State of Wisconsin, Department of Transportation after receipt of invoices from said State for the City's share of the costs for said project: W. Howard Ave. (Excluding Structure) - S. 13th St. to S. 27th St. (ST32001601) (2395-10-70); and, be it
 
Further Resolved, That upon the completion of project W. Howard Ave. (Excluding Structure) - S. 13th St. to S. 27th St. (ST32001601) (2395-10-70) and a determination of the actual cost, it is understood that if the City of Milwaukee's share is less than the amount previously paid, the difference will be refunded to said City; and, be it
 
Further Resolved, That upon request of property owners (tax key numbers 148-9921-100-7 and 148-9922-100-2), the special assessment for sanitary sewer in N. 119th St. be deferred until application for connection to said sewer is made.  Cost for deferred charges shall be in accordance with City Charter 12-10; and, be it
 
Further Resolved, That projects: N. Marshall St. (ST21110138), Alley N. Cambridge Ave. (ST21210106), N. Hubbard St. (ST211020117), W. Howard Ave. (ST32001601) (2395-10-70), and N. 119th St. (SW170020106) will be billed after January 1, 2004, but not before 12 months after the project contract has been completed; and, be it
 
Further Resolved, That the following projects be deleted from the 2002 Paving Program:
 
1st Aldermanic District
 
Alley between W. Fairmount Ave., W. Lancaster Ave., N. Teutonia Ave., and N. 28th St. (ST212020107) File Number 86-1721
 
3rd Aldermanic District
 
N. Marietta Ave. - E. Locust St. to E. Kenwood Bl. (ST211020144) File Number 001024
 
Requestor
Infrastructure Services Division
Drafter
mld:lk
afr9
03/13/02