File #: 181112    Version: 0
Type: Resolution Status: Passed
File created: 11/5/2018 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/27/2018
Effective date:    
Title: Resolution authorizing the Commissioner of Public Works to execute Project Agreements titled ”State Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation and to set up design engineering at total estimated cost of $1,010,450 and an estimated City of Milwaukee share of $202,090 and a grantor share of $808,360 for four City owned bridges.
Sponsors: THE CHAIR
Indexes: BRIDGES, INTERGOVERNMENTAL AGREEMENTS
Attachments: 1. Calumet SMA.pdf, 2. Dana Ct SMA.pdf, 3. Grange SMA-1.pdf, 4. Lovers Lane SMA.pdf, 5. Comptrollers Certificate

Number

181112

Version

ORIGINAL

Reference

 

Sponsor

THE CHAIR

Title

Resolution authorizing the Commissioner of Public Works to execute Project Agreements titled ”State Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation and to set up design engineering at total estimated cost of $1,010,450 and an estimated City of Milwaukee share of $202,090 and a grantor share of $808,360 for four City owned bridges.

Analysis

This Resolution authorizes the Commissioner of Public Works to execute Project Agreements with the Wisconsin Department of Transportation for the design and reconstruction or rehabilitation of four City owned bridges.  This resolution also directs the City of Milwaukee Comptroller to transfer funds and establish project grant chartfield values for the preliminary engineering for these projects.  The Project Agreement provides for 80 percent Federal and State aid and 20 percent local funds.  The total estimated cost for the projects is $7,809,430 of which $1,717,886 is the City of Milwaukee’s Share and $6,091,544 is the grantor’s share.  Construction funds for these projects will be included in future resolutions.

Body

Whereas, The project agreements have been requested and received from the Wisconsin Department of Transportation to be executed by the City of Milwaukee for programming, design and construction of the following projects with Federal and State aid under the Local Bridge Program:

 

State I.D. 2030-15-00, 70

North Lovers Lane Road B-40-0435

Over Union Pacific Railway

 

State I.D. 2984-51-00, 70

South Dana Court P-40-0589

Over Land

 

State I.D. 2984-50-00, 70

West Calumet Road P-40-0537

Over Little Menomonee River

 

State I.D. 2365-07-00, 70

West Grange Avenue B-40-0500

Over Canadian Pacific Railway

 

Whereas, The Department of Public Works shall notify the Common Council of the City of Milwaukee of project cost overruns and changes in scope approved by the Department of Public Works; and

 

Whereas, The Common Council of the City of Milwaukee recognizes that the City may be 100 percent liable for project cost overruns and changes in scope as approved by the Department of Public Works; and

 

Whereas, The Common Council of the City of Milwaukee recognizes that the City may be liable for any costs incurred by the State should the City decide to withdraw from the project; and

 

Whereas, Construction on these projects is currently scheduled to start in 2020-2022, now therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is hereby authorized to execute the Project Agreements for the programming, design and construction of the aforementioned projects with Federal and State aid under the Local Bridge Program, copies of which are attached to this file and incorporated in this resolution by reference as though set forth therein in full; and, be it

 

Further Resolved, That the Commissioner of Public Works is hereby directed to undertake, or engage a consultant to undertake, all or part of the engineering for the improvement of the aforementioned projects and to reimburse the Wisconsin Department of Transportation for design engineering costs as they occur for the improvement; and, be it

 

Further Resolved, That the Commissioner of Public Works is hereby authorized and directed to enter into an agreement with the Wisconsin Department of Transportation pertaining to the cost participation for the installation and modification of the traffic control facilities in conjunction with the improvements of the aforementioned  projects; and, be it

 

Further Resolved, That the Commission of Public Works is hereby authorized and directed to negotiate and enter into the cost sharing agreements with adjacent municipalities for those projects whose project limits extend beyond the City of Milwaukee boundaries; and, be it

 

Further Resolved, That minor changes to the agreement which do not change its intent are hereby approved; and, be it

 

Further Resolved, That the City Comptroller is hereby authorized to create within the Capital Improvement Fund, Grant and Aid Projects, the necessary Project Grant Chartfield Values for design engineering for the projects (Expenditure) and transfer to any of these accounts the amount required under the grant agreement and City Accounting Policy but not to exceed a 10 percent increase of the total amounts reserved for the grantor’s share and local share or $5,000, whichever is greater, as follows:

 

State I.D. 2030-15-00

North Lovers Lane Road B-40-0435

Over Union Pacific Railway

 

City Share Non-Assessable Fund Structure

BR300180000

Fund 0303

$21,566

 

Grantor Reimbursable Fund Structure

SP032180100

Fund 0306

$79,759

 

Grantor Non-Reimbursable Cash Fund Structure

$6,507

 

City Share Non-Assessable Fund Paving

ST320180000

Fund 0333

$9,243

 

Grantor Reimbursable Fund Paving

SP032180100

Fund 0306

$34,182

 

Grantor Non-Reimbursable Cash Fund Paving

$2,788

 

Estimated total engineering $154,045.00

Total engineering previously authorized -0-

Current estimated cost of the total project including this resolution $1,225,125.00

Original estimated cost of the total project $1,225,125.00

 

State I.D. 2984-51-00

South Dana Court P-40-0589

Over Land

 

City Share Non-Assessable Fund Structure

BR300180000

Fund 0303

$36,592

 

Grantor Reimbursable Fund Structure

SP032180100

Fund 0306

$139,861

 

Grantor Non-Reimbursable Cash Fund Structure

$6,507

 

City Share Non-Assessable Fund Paving

ST320180000

Fund 0333

$15,682

 

Grantor Reimbursable Fund Paving

SP032180100

Fund 0306

$59,940

 

Grantor Non-Reimbursable Cash Fund Paving

$2,788

 

Estimated total engineering $261,370.00

Total engineering previously authorized -0-

Current estimated cost of the total project including this resolution $2,102,820.00

Original estimated cost of the total project $2,102,820.00

 

State I.D. 2984-50-00

West Calumet Road P-40-0537

Over Little Menomonee River

 

City Share Non-Assessable Fund Structure

BR300180000

Fund 0303

$38,208

 

Grantor Reimbursable Fund Structure

SP032180100

Fund 0306

$143,232

 

Grantor Non-Reimbursable Cash Fund Structure

$9,601

 

City Share Non-Assessable Fund Paving

ST320180000

Fund 0333

$16,375

 

Grantor Reimbursable Fund Paving

SP032180100

Fund 0306

$61,385

 

Grantor Non-Reimbursable Cash Fund Paving

$4,114

 

Estimated total engineering $272,915.00

Total engineering previously authorized -0-

Current estimated cost of the total project including this resolution $1,897,320.00

Original estimated cost of the total project $1,897,320.00

 

State I.D. 2365-07-00

West Grange Avenue B-40-0500

Over Canadian Pacific Railway

 

City Share Non-Assessable Fund Structure

BR300180000

Fund 0303

$45,097

 

Grantor Reimbursable Fund Structure

SP032180100

Fund 0306

$173,881

 

Grantor Non-Reimbursable Cash Fund Structure

$6,507

 

City Share Non-Assessable Fund Paving

ST320180000

Fund 0333

$19,327

 

Grantor Reimbursable Fund Paving

SP032180100

Fund 0306

$74,520

 

Grantor Non-Reimbursable Cash Fund Paving

$2,788

 

Estimated total engineering $322,120.00

Total engineering previously authorized -0-

Current estimated cost of the total project including this resolution $2,584,165.00

Original estimated cost of the total project $2,584,165.00

 

Totals

City Share Non-Assessable Fund Structure $141,463

Grantor Reimbursable Fund Structure $536,733

Grantor Non-Reimbursable Cash Fund Structure $29,122

City Share Non-Assessable Fund Paving $60,627

Grantor Reimbursable Fund Paving $230,027

Grantor Non-Reimbursable Cash Fund Paving $12,478

 

Estimated Total $1,010,450; and, be it

 

Further Resolved, That the City Engineer is hereby authorized and directed to approve and make periodic payments to the Wisconsin Department of Transportation upon receipt of invoices for the City’s share of costs of the above projects.

 

Requestor

Department of Public Works

Drafter

Infrastructure Services Division

JERREL KRUSCHKE/HOLLY RUTENBECK/C. Murphy

October 30, 2018