Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,635,700 for a total estimated cost of $1,739,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,635,700. The total estimated cost of these projects is $1,739,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
5th Aldermanic District
N. 81st St. - W. Fiebrantz Ave. to W. Hope Ave. (ST211110120) File Number 090907: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7.0 - 9.0-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $10,400; Nonassessable Reconstruction Paving Fund -- $100,000). The total estimated cost for this project including the requested amount is $124,000. This project is anticipated to be completed during the 2011 construction season.
N. 83rd St. - W. Lorraine Pl. to W. Locust St. (ST211110121) File Number 090907: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7.0-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $8,000; Nonassessable Reconstruction Paving Fund -- $100,000). The total estimated cost for this project including the requested amount is $121,000. This project is anticipated to be completed during the 2011 construction season.
N. 119th St. - W. Hampton Ave. to 1600 feet m/l north of W. Hampton Ave. (SM495100035) File Number 091232: Install storm sewer. (Assessable Expansion of Capacity Sewer Fund -- $30,000; Nonassessable Sewer Maintenance Relay Fund -- $285,000). The total estimated cost for this project including the requested amount is $330,000. This project is anticipated to be completed during the 2011 construction season.
N. 119th St. - W. Hampton Ave. to a point 1700 feet m/l north of W. Hampton Ave.
(ST11080113) File Number 091232: Concrete pavement reconstruction, install curb and gutter, driveway approaches where necessary, omit walk, sodding (5.0-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $31,600; Nonassessable Reconstruction Paving Fund -- $555,000). The total estimated cost for this project including the requested amount is $612,000. This project is anticipated to be completed during the 2011 construction season.
7th Aldermanic District
N. 41st St. - W. Congress St. to W. Ruby Ave. (ST211110137) File Number 100837: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7.0-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $8,600; Nonassessable Reconstruction Paving Fund -- $80,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2011 construction season.
N. 42nd St. - W. Burleigh St. to W. Townsend St. (ST211050117) File Number 100837: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7.0-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $17,100; Nonassessable Reconstruction Paving Fund -- $410,000). The total estimated cost for this project including the requested amount is $452,000. This project is anticipated to be completed during the 2011 construction season.
; and
Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and
Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That projects N. 81st St. (ST211110120), N. 83rd St. (ST211110121), N. 119th St. (SM495100035), N. 119th St. (ST211080113), N. 41st St. (ST211110137), and N. 42nd St. (ST211050117) will be billed after January 1, 2013, but not before 12 months after the project contract has been completed; and, be it
Further Resolved, That upon request of property owners (tax key numbers: 218-0021-100-7, 218-0022-100-2, 218-0031-100-1, 218-0041-X, 218-9979-110-7, 218-9991-119-6, 218-9991-124-2, 218-9991-211-7, 218-9992-111-6, 218-9995-200-3, and 218-9997-112-1), the special assessments for storm sewer in N. 119th St. (SM495100035) be deferred until application for connection to said storm sewer is made. Cost for deferred charges shall be in accordance with City Charter 12-10.
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Afr 10