Number
230576
Version
Substitute A
Reference
221683
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $50,000 for a total estimated cost of these projects being $407,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $50,000 with the total cost estimated to be $407,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
1st Aldermanic District
Alley betw. W. Florist Av., W. Oriole Dr., N. 34th St., N. 35th St. (North half of North/South Leg and East/West Leg) (ST212220105) File Number 221597: Concrete alley pavement reconstruction, and grading. (Nonassessable Alley Paving Fund -- $10,000, additional funds) The total estimated cost of this project including the requested amount is $132,000. This project is anticipated to be completed during the 2023 construction season.
3rd and 4th Aldermanic Districts
N. Prospect Ave. - E. Ogden Ave. to E. Kenilworth Pl. (ST211230124) File Number 221683: Install traffic calming speed table(s) and bump out(s). (Nonassessable Reconstruction Paving Fund --$25,000 additional funds). The total estimated cost of this project including the requested amount is $175,000. This project is anticipated to be completed during the 2024-25 construction season.
5th Aldermanic District
Alley betw. W. Burleigh St., W. Chambers St., N. 87th St., N. 88th St. (ST212230104). Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2024 construction season.
; and, be it
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck/TW
APR 1 sub
9/1/2023