File #: 030635    Version: 0
Type: Resolution Status: Passed
File created: 9/3/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 9/23/2003
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, STREET IMPROVEMENTS
Attachments: 1. Infr. Serv. Div. cover letter.pdf, 2. Fiscal Note.pdf
Number
030635
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
N. 28th St. at W. Lincoln Creek (ST211040123):  Street closure. (Nonassessable Reconstruction Paving Fund -- $5,000)
 
Alley between W. Fairmount Ave., W. Stark St., N. Teutonia Ave., N. 27th St., and N. 28th St. (ST212040114):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000)
 
2nd Aldermanic District
 
N. 71st St. - W. Capitol Dr. to W. Congress St. (ST21110128):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 of additional funds to this project)
 
3rd Aldermanic District
 
Alley between E. Auer Ave., N. Bremen St., E. Burleigh St., N. Weil St., the C. M. C. Real Estate Corporation Right-of-Way (ST21290130):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000)
 
Alley between E. Linnwood Ave., E. Locust St., N. Prospect Ave., and N. Stowell Ave. (ST212040121):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,000)
 
5th Aldermanic District
 
W. Chambers St. - N. 80th St. to N. 84th St. (ST211040101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 of additional funds to this project)
 
Alley between W. Auer Ave., W. Burleigh St., N. 86th St., and N. 87th St. (ST21290131):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
7th Aldermanic District
 
Alley between W. Center St., W. Hadley St., N. 46th St., and N. 47th St. (ST21290135):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
8th Aldermanic District
 
Alley between W. Manitoba St., W. Oklahoma Ave., S. 48th St., and S. 49th St. (ST21290143):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000)
 
Alley between W. Becher St., W. Grant St., S. 16th St., and S. 17th St. (ST21290154):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,000)
 
Alley between W. Becher St., W. Merrill St., S. Muskego Ave., and S. 24th St. (ST21290155):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000)
 
9th Aldermanic District
 
Alley between W. Rohr Ave., W. Villard Ave., N. 35th St., and N. 36th St. (ST21200140):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
Alley between W. Rohr Ave., W. Villard Ave., N. 44th St., and N. 45th St. (ST212040111):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
12th Aldermanic District
 
Alley between W. Becher St., W. Rogers St., S. 6th St., and S. 7th St. (ST212040120):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $6,000)
 
Alley between W. Bruce St., W. Virginia St., S. 1st St., and S. 2nd St. (ST21290126)  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000)
 
13th Aldermanic District
 
Alley between W. Morgan Ave., W. Ohio Ave., W. Verona Ct., S. 22nd St., S. 24th St., the Union Pacific Railroad Company Right-of-Way (Southerly East-West Leg and North-South Leg) (ST212030134):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $20,000)
 
14th Aldermanic District
 
S. Woodward St. - E. Lincoln Ave. to a point north of E. Lincoln Ave. (ST211040113):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
 
Alley between S. Austin St., E. Dewey Pl., S. Howell Ave., and E. Schiller St. (Westerly North-South Leg, Southerly East-West Leg, and Easterly North-South Leg)  (ST21290120):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000)
 
Alley between S. Clement Ave., S. Herman St., E. Saveland Ave., and E. Wilbur Ave. (ST212040124):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
 
16th Aldermanic District
 
Alley between W. Lapham St., W. Mitchell St., S. 32nd St., and S. 33rd St. (ST212040122):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,000)
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
mld:lk
apr1
09/10/03