Number
241716
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $149,000 for a total estimated cost of these projects being $3,174,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $149,000 with the total cost estimated to be $3,174,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
3rd Aldermanic District
Alley between E. Belleview Pl., N. Downer Ave., N. Stowell Ave., and E. Webster Pl. (ST212060101) File Number 091341: Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000 additional funds). The total estimated cost for this project including the requested amount is $150,000. This project is anticipated to be completed during the 2027 construction season.
E. Hartford Ave.- N. Downer Ave. to Oakland Ave. (ST216250107) Asphalt surface overlay and ADA ramps. (Nonassessable High Impact Paving Fund -- $15,000) The total estimated cost of this project including the requested amount is $300,000. This project is anticipated to be completed during the 2025 construction season.
N. Oakland Ave. - E. Locust St. to E. Linnwood Ave. (BID #13) (ST211250107) Traffic calming concrete speed table(s). (Nonassessable High Impact Paving Fund -- $15,000) The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2025 construction season.
4th and 8th Aldermanic Districts
ADA ramps for 2025 Area wide sidewalk repair areas (ST216250112): Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund -- $15,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2025 construction season.
11th Aldermanic District
S. 53rd St. - W. Oklahoma Ave. to W. Montana St. (ST211250131) Asphalt surface overlay and ADA ramps. (Nonassessable Reconstruction Paving Fund -- $10,000). The total estimated cost for this project including the requested amount is $150,000. This project is anticipated to be completed during the 2025 construction season.
11th Aldermanic District and City of Greenfield
W. Cold Spring Rd. - S. 51st St. to S. 68th St. (Sponsored by the City of Greenfield) (ST211250108) Concrete pavement maintenance and ADA ramps. (Nonassessable Reconstruction Paving Fund -- $10,000). The total estimated cost for this project including the requested amount is $125,000. This project is anticipated to be completed during the 2025 construction season.
13th and 14th Aldermanic District
S. 6th St.- W. Howard Ave. to W. Ohio Ave. (ST216250109) Asphalt surface overlay, ADA ramps, and bike lane. (Nonassessable High Impact Paving Fund -- $15,000) The total estimated cost of this project including the requested amount is $500,000. This project is anticipated to be completed during the 2025/2026 construction season.
13th Aldermanic District
S. 13th St.- W. College Ave. to W. Layton Ave. (ST216250108) Asphalt surface overlay, ADA ramps, and traffic calming. (Nonassessable High Impact Paving Fund -- $15,000) The total estimated cost of this project including the requested amount is $1,000,000. This project is anticipated to be completed during the 2025 construction season.
S. Griffin Ave. - E. Van Norman Ave. to E. Armour Ave. (SM495250031) Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $36,000. This project is anticipated to be completed during the 2025 construction season.
S. Jasper Ave. - E. Van Norman Ave. to E. Armour Ave. (SM495250032) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $88,000. This project is anticipated to be completed during the 2025 construction season.
City Wide
Large Diameter Sewer Exams in Area Bounded by W. Oklahoma Ave. to W. Keefe Ave. and S. Delaware Ave. to N. 55th St. (SM495250030) Combined sewer exams. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost for this project including the requested amount is $675,000. This project is anticipated to be completed during the 2025 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck
NPR 9 Sub
3/20/2025