File #: 061231    Version:
Type: Resolution Status: Passed
File created: 1/17/2007 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/6/2007
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $71,000 for a total estimated cost of these projects being $990,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. Fiscal Note, 3. Handouts submitted by Atty. Brad Hoeschen, 4. Proposal submitted by Fred Anderson-Eaton Asphalt Services, Inc. 1-24-07 PW
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
2/20/20071 MAYOR SIGNED   Action details Meeting details Not available
2/6/20071 COMMON COUNCIL ADOPTEDPass12:3 Action details Meeting details Not available
1/24/20071 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Appearances by: Ald. Bohl, 5th Aldermanic District Clark Wantoch, Administration & Transportation Design Manager, Dept. of Public Works Tim Erkander, 12031 W. Bobolink Ave. Attorney Brad Hoeschen -with Greenberg & Hoeshen, LLC for Fredrick Anderson Fredrick Anderson, Property owner of several lots in the area of 121st & Bobolink Ave. Mr. Oscar A. Froehlich, 12131 W. Bobolink Ave. Ald. Dudzik moved to make photos submitted by Attorney Brad Hoeschen a part of the record. Prevailed.
Pass3:2 Action details Meeting details Not available
1/22/20070 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
1/22/20070 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
1/19/20071 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
1/17/20070 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

061231

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $71,000 for a total estimated cost of these projects being $990,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $71,000 with the total cost estimated to be $990,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

5th Aldermanic District

 

N. 121st St. - A point 450 feet m/l south of W. Bobolink Ave. to W. Bobolink Ave. (ST210060101):  Construct asphalt pavement, construct curb and gutter.  Doing all the necessary grading pertaining to said work.  (Nonassessable New Paving Fund -- $15,000).  The total construction cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 121st St. - A point 450 feet m/l south of W. Bobolink Ave. to W. Bobolink Ave. (SW170060110):  Installing new sanitary and storm sewers. (Nonassessable Expansion of Capacity Sewer Fund -- $5,000).  The total estimated cost for this project including the requested amount is $157,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Flagg St. (Extended) - 130 feet m/l west of N. 119th St. to N. 121st St. (SW170060109):  Installing new sanitary and storm sewers. (Nonassessable Expansion of Capacity Sewer Fund -- $5,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2007 construction season.

 

6th Aldermanic District

 

Alley between E. Auer Ave., N. Booth St., E. Concordia Ave., N. Pierce St., and the C.M.C. Real Estate Corporation Right of Way. (ST21200103):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $4,000, additional funds).  File Number 980909 authorized $4,000.  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2008 construction season.

 

6th and 15th Aldermanic Districts

 

W. Brown St. (Excluding Structure) - N. 6th St. to N. 12th St. (ST211080106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2008 construction season.

 

7th Aldermanic District

 

W. Nash St. - N. 56th St. to N. 60th St. (ST211060132):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000, additional funds).  File Number 060842 authorized $13,000.  The total estimated engineering cost including this request is $15,000. The total estimated cost for this project including the requested amount is $143,000.  This project is anticipated to be completed during the 2008 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

apr6

01/24/07