File #: 080237    Version:
Type: Resolution Status: Passed
File created: 6/10/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/1/2008
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $675,000 for a total estimated cost of these projects being $10,286,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Hearing notice list, 3. Fiscal note, 4. Sub Fiscal Note
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/11/20082 MAYOR SIGNED   Action details Meeting details Not available
7/1/20082 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
6/18/20081 PUBLIC WORKS COMMITTEE AMENDED

Minutes note: Ald. Wade moved to amend by adding the following: Various Aldermanic Districts Downtown Connector Alternative Analysis study administered by the Wisconsin Center District and funded with an FTA grant that requires a local match shared by the City of Milwaukee and Milwaukee County. As the alternatives have increased in scope, the city’s total estimated portion of the local match is $580,000 of which $395,000 can be achieved using in-kind services with the remainder funded using Special number special number for this ST320080000 (City Share Non-Assessable Paving Fund - $185,000). Previously authorized for preliminary engineering: $0.00 Current capital estimated cost of the Alternative Analysis study including this resolution: $185,000.00 Current estimated City of Milwaukee in-kind cost of the Alternative Analysis study: $395,000.00
Pass4:0 Action details Meeting details Not available
6/18/20082 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
6/13/20080 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/10/20080 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

080237

Version

SUBSTITUTE 2

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $675,000 for a total estimated cost of these projects being $10,286,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $675,000 with the total cost estimated to be $10,286,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Roosevelt Dr. - 100 feet m/l east of N. 21st St. to N. 20th St. (SM495080026): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2008 construction season.

 

3rd Aldermanic District

 

N. Bartlett Ave. - E. North Ave. to 95 feet m/l north of E. North Ave. (SM495070105): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $64,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Cramer St. - E. North Ave. to E. Thomas Ave. (SM495080031): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $117,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Maryland Ave. - E. Hartford Ave. to E. Newport Ave. (SM495080034): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $101,000.  This project is anticipated to be completed during the 2009 construction season.

 

E. North Ave. - N. Bartlett Ave. to N. Cambridge Ave. (SM495080048): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost for this project including the requested amount is $941,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Oakland Ave. - E. Thomas Ave. to E. Bradford Ave. (SM495080042): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $204,000.  This project is anticipated to be completed during the 2009 construction season.

 

4th Aldermanic District

 

W. Clybourn St. - N. 26th St. to N. 29th St. (SM495060055): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $35,000).  The total estimated cost for this project including the requested amount is $850,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Market St. - E. Wells St. to a point north of E. Wells St. (ST211090125): Concrete pavement reconstruction, special treatment.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $108,000.  This project is anticipated to be completed during the 2009 construction season.

 

5th Aldermanic District

 

N. 76th St. - 275 feet m/l north of W. Locust St. to W. Chambers St. (SM495080044): Storm sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $46,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 84th St. - W. Lorraine Pl. to W. Locust St. (SM495080029): Relaying sanitary and storm sewers. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $400,000.  This project is anticipated to be completed during the 2009 construction season.

 

6th Aldermanic District

 

W. Nash St. - N. 22nd St. to N. 23rd St. (SM495080040): Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $34,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 20th St. - 320 feet m/l south of W. Concordia Ave. to W. Townsend St. (SM495080043): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $173,000.  This project is anticipated to be completed during the 2009 construction season.

 

6th and 15th Aldermanic Districts

 

N. 8th St. - W. Hadley St. to W. Chambers St. (SM495080036): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2009 construction season.

 

7th Aldermanic District

 

W. Cawker Pl. - N. 30th St. to 140 feet west of N . 30th St. (SM495080035): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $42,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Sherman Blvd. - W. Locust St. to W. Burleigh St. (SM495080041): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $241,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 27th St. - W. Nash St. to W. Capitol Dr. (SM495070171): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $447,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 34th St. - W. Fond du Lac Ave. to W. Burleigh St. (SM495080033): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $54,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 51st Blvd. - W. Auer Ave. to W. Concordia Ave. (SM495070182): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $205,000.  This project is anticipated to be completed during the 2009 construction season.

 

8th Aldermanic District

 

W. Rogers St. - S. 36th St. to S. 37th St. (SM495080027): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2009 construction season.

 

10th Aldermanic District

 

W. Girard Ave. - 185 feet m/l west of W. Appleton Ave. to N. 66th St. (SM495070178): Sanitary sewer relay and lining. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $181,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Richmond Ave. - N. 62nd St. to N. 64th St. (SM495070193): Sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 43rd St. - W. Juneau Ave. to W. Martin Dr. (SM495080028): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 55th St. - W. Washington Blvd. to W. Vine St. (SM495080030): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $1,112,000.  This project is anticipated to be completed during the 2009 construction season.

 

Various Locations (SM498050009): Sealing sanitary sewers. (Nonassessable Flow Reduction Fund -- $25,000).  The total estimated cost for this project including the requested amount is $405,000.  This project is anticipated to be completed during the 2008 construction season.

 

11th Aldermanic District

 

W. Dodge Pl. - 65 feet east of W. Wilbur Ave. to W. Warnimont Ave. (WT410091424): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Oklahoma Ave. - 300 feet west of W. Lakefield Dr. to 300 feet east of S. 76th St. (WT410081108): Relaying water main and water main extension. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 68th St. at W. Howard Ave. (WT410091423): Water main alteration. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2009 construction season.

 

12th Aldermanic District

 

S. 14th St. - W. Mitchell St. to W. Forest Home Ave. (SM495070027): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 15th St. - W. Mitchell St. to W. Forest Home Ave. (SM495080032): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2009 construction season.

 

13th Aldermanic District

 

W. Grange Ave. - S. 13th St. to 1,270 feet m/l west of S. 13th St. (SM495080018): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $1,233,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Kimberly Ave. - S. 18th St. to S. 20th St. (WT410090001): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2009 construction season.

 

14th Aldermanic District

 

S. Austin St. - E. Ward St. to E. Lincoln Ave. (SM495070175): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $91,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. Herman St. - E. Idaho St. to E. Manitoba St. (SM495080046): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. Linebarger Terr. - 450 feet m/l north of S. Kinnickinnic Ave. to E. Rusk Ave. (SM495080037): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. Logan Ave. - E. Linus St. to E. Conway St. (SM495080019): Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $71,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Montana St. - S. 6th St. to S. 9th St. (SM495080021): Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $499,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 8th St. - W. Manitoba St. to W. Oklahoma Ave. (SM495080047): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $102,000.  This project is anticipated to be completed during the 2009 construction season.

 

15th Aldermanic District

 

N. 15th St. - W. Wright St. to W. Clarke St. (SM495080045): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $139,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 25th St. - W. Meinecke Ave. to W. Medford Ave. (SM495080003): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $151,000.  This project is anticipated to be completed during the 2008 construction season.

 

Various Aldermanic Districts

 

Downtown Connector Alternative Analysis study administered by the Wisconsin Center District and funded with an FTA grant that requires a local match shared by the City of Milwaukee and Milwaukee County.  As the alternatives have increased in scope, the city’s total estimated portion of the local match is $580,000 of which $395,000 can be achieved using in-kind services with the remainder funded using Special number special number for this ST320080000 (City Share Non-Assessable Paving Fund - $185,000).

 

Previously authorized for preliminary engineering:  $0.00

Current capital estimated cost of the Alternative Analysis study including this resolution: $185,000.00

Current estimated City of Milwaukee in-kind cost of the Alternative Analysis study:  $395,000.00

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:dr