File #: 081489    Version:
Type: Resolution Status: Passed
File created: 3/3/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/25/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $968,000 for a total estimated cost of these projects being $14,336,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal Note, 3. Hearing Notice List

Number

081489

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $968,000 for a total estimated cost of these projects being $14,336,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $968,000 with the total cost estimated to be $14,336,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

N. 26th St. - W. Roosevelt Dr. to W. Atkinson Ave. (SM495090006): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $59,000.  This project is anticipated to be completed during the 2009 construction season.

 

System 1205 Department of Justice Rehabilitation Work. (SM495090100): Sanitary sewer relay and lining. (Nonassessable Sewer Maintenance Relay Fund -- $28,000).  The total estimated cost for this project including the requested amount is $348,000.  This project is anticipated to be completed during the 2009/2010 construction seasons.

 

System 1225 Department of Justice Rehabilitation Work (SM495090103): Sanitary sewer relay and lining. (Nonassessable Sewer Maintenance Relay Fund -- $112,000).  The total estimated cost for this project including the requested amount is $1,400,000.  This project is anticipated to be completed during the 2009/2010 construction seasons.

 

3rd Aldermanic District

 

E. North Ave. - N. Bartlett Ave. to N. Oakland Ave. (SM495090014): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $860,000.  This project is anticipated to be completed during the 2010 construction season.

 

4th Aldermanic District

 

Clybourn Street Vertical Lift Bridge over the Milwaukee River (BR100090104): Preliminary engineering for structural steel repairs and painting. (City Share Nonassessable Structure Fund -- $150,000).  The total estimated cost for this project including the requested amount is $5,150,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. St. Paul Ave. - N. 27th St. to N. 28th St. (SM495090015): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $53,000.  This project is anticipated to be completed during the 2009 construction season.

 

7th Aldermanic District

 

W. Concordia Ave. - N. 41st St. to N. Sherman Blvd. (SM495090013): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $106,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Townsend St. - N. 42nd St. to N. Sherman Blvd. (SM495090010): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $44,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 37th St. - 150 feet m/l north of W. Burleigh St. to W. Fond du Lac Ave. (SM495090007): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2009 construction season.

 

8th Aldermanic District

 

S. 28th St. - W. Lincoln Ave. to W. Hayes Ave. (SM495080039): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $97,000.  This project is anticipated to be completed during the 2009 construction season.

 

11th Aldermanic District

 

W. Crawford Ave. - S. 84th St. to S. 87th St. (WT410100004): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $215,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Oklahoma Ave. - S. 74th St. to W. Beloit Rd. (WT410100006): Water main extension. (Nonassessable Water Fund -- $50,000).  The total estimated cost for this project including the requested amount is $2,600,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. Princeton Ave. - 350 feet m/l south of W. Sunbury Ct. to S. 37th St. (SM495090008): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $142,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 72nd St. at W. Bennett Ave. (Sponsored by the City of West Allis) (ST211090138) Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $5,000.  This project is anticipated to be completed during the 2009 construction season.

 

System 1780 Department of Justice Rehabilitation Work. (SM495090101): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $23,000).  The total estimated cost for this project including the requested amount is $753,000.  This project is anticipated to be completed during the 2009/2010 construction seasons.

 

12th Aldermanic District

 

W. Lapham Blvd. - S. 2nd St. to S. 4th St. (SM495090009): Relaying combined sewer.  The total estimated cost for this project is $260,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. National Ave. - S. 11th St. to S. 12th St. (SM495090011): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project is $55,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 1st St. - S. Kinnickinnic Ave. to E. Maple St. (WT410100009): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 2nd St. - W. Lapham Blvd. to W. Mitchell St. (SM495090012): Relaying combined sewer. The total estimated cost for this project is $113,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 3rd St. - W. Lapham Blvd. to W. Mitchell St. (SM495080064): Relaying combined sewer. The total estimated cost for this project is $170,000.  This project is anticipated to be completed during the 2009 construction season.

 

13th Aldermanic District

 

Oak Creek Channel - W. College Ave. to W. Ramsey Ave. (SM493090102) File Number 081488: Cattail removal from Oak Creek Channel.  The total estimated cost for this project is $25,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Oklahoma Ave. - S. 24th St. to S. 26th St. (ST211090139): Median revision. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2009 construction season.

 

14th Aldermanic District

 

6th Street Bridge over the Kinnickinnic River (BR100090105): Preliminary engineering review for bridge replacement. (City Share Nonassessable Structure Fund -- $50,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2012 construction season.

 

S. 7th St. - W. Manitoba St. to W. Oklahoma Ave. (SM495080038): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $101,000.  This project is anticipated to be completed during the 2009 construction season.

 

Various

 

Bridge Indirect and Administration (BR100090101). (City Share Nonassessable Structure Fund -- $150,000).  The total estimated cost for this project is $150,000.  This project is anticipated to be completed during the 2009 construction season.

 

Bridge Safety Inspection (BR100090102). (City Share Nonassessable Structure Fund -- $150,000).  The total estimated cost for this project is $150,000.  This project is anticipated to be completed during the 2009 construction season.

 

City of Greenfield

 

W. Cold Spring Rd. - 450 feet east of S. 34th St. to 100 feet east of S. 34th St. (WT410091013): Water service alteration. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 27th St. - W. Abbott Ave. to W. Parnell Ave. (WT410100008): Relaying water main. (Nonassessable Water Fund -- $30,000).  The total estimated cost for this project including the requested amount is $675,000.  This project is anticipated to be completed during the 2010 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 