File #: 981441    Version:
Type: Resolution Status: Passed
File created: 1/19/1999 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/9/1999
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS
NUMB:
981441
VERS:
SUBSTITUTE 1
REF:
911748
XXBY:
THE CHAIR
TITL:
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
ANLS:
-Analysis-
 
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
BODY:
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
 
3rd Aldermanic District
 
N. Arlington Pl. - E. Brady St. to E. Kane Pl. ST21190174 (873-0767-1) File Number 911748: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund -- $148,855; Assessable Reconstruction Paving Fund -- $55,465)
 
N. Fratney St. - E. Center St. to E. Hadley St. ST21190223 (879-0867-9) File Number 970997: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Nonassessable Reconstruction Paving Fund -- $94,810; Assessable Reconstruction Paving Fund -- $13,615)
 
N. 1st St. - W. Capitol Dr. to 200 ft. m/l north of W. Capitol Dr. ST21190237 (879-0892-5) File Number 980620: New concrete pavement construction, replace curb and gutter and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund -- $28,755; Assessable Reconstruction Paving Fund -- $10,130; Glendale -- $12,900)
 
10th Aldermanic District
 
Alley between W. Chambers St., W. Locust St., N. 38th St., and N. 39th St. ST21290136 (888-0677-5) File Number 960740: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, grading, and storm water drainage facilities where needed. (Nonassessable Alley Paving Fund -- $42,385; Assessable Alley Paving Fund -- $29,765)
 
11th Aldermanic District
 
W. Montana St. - S. 66th St. to S. 68th St. ST21190215 (879-0855-3) File Number 970750: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund -- $53,440; Assessable Reconstruction Paving Fund -- $7,735)
 
12th Aldermanic District
 
Alley between W. Grant St., W. Lincoln Ave., S. 15th Pl. and S. 15th St. ST21290156 (889-0875-9) File Number 970997: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, and grading. (Nonassessable Alley Paving Fund -- $36,345; Assessable Alley Paving Fund -- $25,010)
 
15th Aldermanic District
 
Alley between W. Carmen Ave., W. Thurston Ave., N. 98th St. and N. 99th St. ST21290144 (888-0759-0) File Number 970868: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, grading, and storm water drainage facilities where needed. (Nonassessable Alley Paving Fund 31-523---212-0001 -- $60,380; Assessable Alley Paving Fund 71-523---212-0001 -- $34,265)
 
;and
 
Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and
 
Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it
 
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital purpose subaccounts; and, be it
 
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
 
Further Resolved, That projects N. Arlington Pl. (873-0767-1), N. Fratney St. (879-0867-9), N. 1st St. (879-0892-5), Alley W. Chambers St. (888-0677-5), W. Montana St. (879-0855-3), Alley W. Grant St. (889-0875-9), Alley W. Carmen Ave. (888-0759-0) will be billed after January 1, 2001, but not before 12 months after the project contract has been completed.
 
 
DFTR:
INFRASTRUCTURE SERVICES DIVISION
MGL:sdp
01-27-99
981441.AFR