File #: 201137    Version:
Type: Resolution Status: Passed
File created: 12/15/2020 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 1/19/2021
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $727,000 for a total estimated cost of $970,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. signed letter.pdf, 2. Official Notice Cycle 6.pdf, 3. Signed ad 6.pdf, 4. Proof of Publication
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
1/28/20211 MAYOR SIGNED   Action details Meeting details Not available
1/19/20211 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
1/6/20211 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 10th Aldermanic District N. 60th St. – W. McKinley to W. Vliet St. (Sponsored by the City of Wauwatosa) (ST211190106) Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Perez moved approval. (Prevailed 5-0) N. 60th St. – W. Wells St. to W. Valley Forge Dr. (Sponsored by the City of Wauwatosa) (ST211190101) Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0) 11th Aldermanic District S. 45th St., S. 47th St., W. Crawford Ave., W. Tripoli Ave. (Sponsored by the City of Greenfield) (ST211180279) Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (18’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
12/15/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

 

Number

201137

Version

SUBSTITUTE 1

Reference

181587

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $727,000 for a total estimated cost of $970,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $727,000.  The total estimated cost of these projects is $970,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

10th Aldermanic District

 

N. 60th St. - W. McKinley to W. Vliet St. (Sponsored by the City of Wauwatosa) (ST211190106) File Number 181587:  Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $21,500; Nonassessable Reconstruction Paving Fund  -- $255,000).   The total estimated cost of this project including the requested amount is $280,000. This project is anticipated to be completed during the 2021 construction season.

 

N. 60th St. - W. Wells St. to W. Valley Forge Dr. (Sponsored by the City of Wauwatosa)  (ST211190101) File Number 171478: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $7,300; Nonassessable Reconstruction Paving Fund  -- $153,000).   The total estimated cost of this project including the requested amount is $165,000. This project is anticipated to be completed during the 2021 construction season.

 

11th Aldermanic District

 

S. 45th St., S. 47th St., W. Crawford Ave., W. Tripoli Ave. (Sponsored by the City of Greenfield)  (ST211180279) File Number 190517: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (18’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $40,200; Nonassessable Reconstruction Paving Fund  -- $250,000).   The total estimated cost of this project including the requested amount is $525,000. This project is anticipated to be completed during the 2021 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

 

Further Resolved, That projects:  N. 60th St. (ST211190106), N. 60th St.(ST211190101), S. 45th St. (ST211180279) will be billed after January 1, 2023, but not before 12 months after the project contract has been completed.

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 6

01/06/2021