powered help
header-left header-center header-right
File #: 061241    Version:
Type: Resolution Status: Passed
File created: 1/17/2007 In control: ZONING, NEIGHBORHOODS & DEVELOPMENT COMMITTEE
On agenda: Final action: 2/6/2007
Effective date:    
Title: Substitute resolution approving modification to scope of work for public infrastructure in Tax Incremental District No. 67 (The Brewery Project).
Sponsors: ALD. BAUMAN
Indexes: PUBLIC IMPROVEMENTS, TAX INCREMENTAL DISTRICTS, TAX INCREMENTAL FINANCING
Attachments: 1. Fiscal Note.pdf, 2. Revised Term Sheet-Redlined as of 1-17-07.pdf, 3. 10th Street Section B-B Plan as of 10-23-06, 4. Concept Site Plan as of 1-19-07, 5. Juneau Ave Section A-A Plan as of 10-23-06.pdf, 6. Juneau Ave Typical Intersection Plan as of 1-19-07.pdf, 7. Offsite Infrastructure Matrix Updated 1-15-07.pdf, 8. Urban Edge Design Award 2006

Number

061241

Version

SUBSTITUTE 1

Reference

060911

Sponsor

ALD. BAUMAN

Title

Substitute resolution approving modification to scope of work for public infrastructure in Tax Incremental District No. 67 (The Brewery Project).

Analysis

This substitute resolution changes the scope of work for the public infrastructure at The Brewery Project to incorporate an innovative, ‘sustainable’ storm water management program and amends the terms of the Development Agreement to provide for funding from the City and the Brewery Project, LLC. Since the cost increase for this change is within the limits permitted by Section 304-93 of the Code of Ordinances and the Developer has agreed to absorb, thru direct funding or securing of grants, 80 percent of this cost, no additional funding need be appropriated.

Body

Whereas, With the adoption of File No. 060911 on December 12, 2006, the City of Milwaukee (“City”) created Tax Incremental District (“TID”) No. 67 (The Brewery Project) and approved a Project Plan for this TID; and

 

Whereas, Included in the scope of work for the Project Plan was a budget for City infrastructure work, including the provision of storm sewers to be installed in the existing and/or newly dedicated rights-of-way within the TID; and

 

Whereas, The Brewery Project, LLC, (“Developer”) and the City now wish to provide for an innovative ‘sustainable’ storm water plan for the TID, including the provision of bio-swales, porous pavement and sub-surface water retention vessels to significantly reduce the rate of discharge into the MMSD collector and deep tunnel systems while also improving water quality; and

 

Whereas, The initial budget estimate for the City infrastructure work, including the storm water cost for the Project, was $6,149,500 as provided in Exhibit 5, pages 1-4 of the Project Plan and the Revised budget estimate for this work, including the revised storm water plan, including design and engineering is approximately $500,000 greater, of which the Developer has agreed to advance $400,000; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the scope of work for the public infrastructure and storm water plan as set forth in Exhibit 5 of the Project Plan are modified and approved as per the Offsite Infrastructure Matrix, a copy of which is attached to this Common Council File; and, be it

 

Further Resolved, That the Term Sheet for the Development Agreement for this Project Plan is amended as provided in a Revised Term Sheet, a copy of which is attached to this Common Council File; and, be it

 

Further Resolved, That in as much as the City’s share of the expected cost increase for implementing the revised infrastructure work is less than the amount permitted pursuant to Section 304-93 of the Milwaukee Code of Ordinances, additional funds for this work are not required to be appropriated.

Drafter

DCD:JS:js

01/24/07