Number
241617
Version
Substitute 1
Reference
231464
Sponsor
THE CHAIR
Title
Resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $1,954,000 for a total estimated cost of these projects being $2,644,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $1,954,000. The total estimated cost of these projects is $2,644,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
5th Aldermanic District
N. 84th St. - W. Congress St. to W. Hampton Av. (ST211210156) File Number: 221685: Install traffic calming speed table(s). (Nonassessable Reconstruction Paving Fund --$10,000 additional funding). The total estimated cost of this project including the requested amount is $58,000. These funds are needed to close out the contract.
W. Glendale Ave. - N. 84th St. to N. 87th St. (ST211210198) File Number 230039: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8.0’width of tree border area) and grading. (Nonassessable Reconstruction Paving Fund -- $15,000). The total estimated cost for this project including the requested amount is $390,000. These funds are needed to close out the contract.
6th Aldermanic District
W. Townsend St.- N. 1st St. to 150’+/- east of N. 2nd St. (SM495240030) File Number 240811: Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $97,000). The total estimated cost of this project including the requested amount is $109,000. This project is anticipated to be completed during the 2025 construction season.
E. Vienna Ave.- N. Humboldt Blvd. to 550’+/- east of N. Humboldt Blvd. (SM495240031) File Number 240811: Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $173,000). The total estimated cost of this project including the requested amount is $188,000. This project is anticipated to be completed during the 2025 construction season.
11th Aldermanic District and City of Greenfield
W. Howard Av. - S. 43rd St. to S. 60th St. (ST216240109/ST214250101) File Number 231464: Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $750,000; Developer Paving Fund -- $150,000). The total estimated cost of this project including the requested amount is $930,000. This project is anticipated to be completed during the 2025 construction season.
13th Aldermanic District
S. 5th St.- W. Waterford Ave. to W. Plainfield Ave. (SM495240032) File Number 240811: Installing new storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $197,000). The total estimated cost of this project including the requested amount is $212,000. This project is anticipated to be completed during the 2025 construction season.
W. Waterford Ave.- 190’ east of S. 5th St. to S. 5th St. (SM495240033) File Number 240811: Installing new storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $121,000). The total estimated cost of this project including the requested amount is $136,000. This project is anticipated to be completed during the 2025 construction season.
13th and 14th Aldermanic District
S. 4th St.- W. Holt Ave. to 100’ south of W. Morgan Ave. (SM495240068) File Number 241329: Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $191,000). The total estimated cost of this project including the requested amount is $206,000. This project is anticipated to be completed during the 2025 construction season.
Various Aldermanic Districts
High impact paving: City portion of TID 76; S. 20th, W. Plainfield (ST216240105) File Number 240368: Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $250,000 additional funds). The total estimated cost of this project including the requested amount is $415,000. This project is anticipated to be completed during the 2025 construction season.
now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck
NFR 8 Sub
2/17/2025