File #: 090538    Version:
Type: Resolution Status: Passed
File created: 9/1/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 9/22/2009
Effective date:    
Title: Substitute resolution approving engineering review and construction oversight of projects to be funded by the American Reinvestment and Recovery Act (ARRA) as non-assessable public improvements at various locations and appropriating funds for these purposes, with the City share of these projects for nonparticipating items is estimated to be $635,000.
Sponsors: THE CHAIR
Indexes: AMERICAN RECOVERY AND REINVESTMENT ACT, STREET IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal note, 3. Comptroller's Certification, 4. Hearing Notice List

Number

090538

Version

  SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution approving engineering review and construction oversight of projects to be funded by the American Reinvestment and Recovery Act (ARRA) as non-assessable public improvements at various locations and appropriating funds for these purposes, with the City share of these projects for nonparticipating items is estimated to be $635,000.

Analysis

The resolution directs the engineering review and the construction oversight of said public improvements. The City share of these projects for nonparticipating items is estimated to be $635,000 with the total estimated costs of these projects in there entirety are $14,192,730 with grantor ARRA funding of $13,197,730 and a City share of $995,000.

Body

Whereas, Monies became available under Phase 3 of the American Reinvestment and Recovery Act (ARRA) for local paving projects with 100% construction and construction engineering funding; and

 

Whereas, Resolution 081603 authorized the Commissioner of Public Works to execute agreements with the WISDOT for projects funded by the ARRA; and

 

Whereas, The City applied for various street construction projects that were eligible for construction funding under Phase 3 of the ARRA; and

 

Whereas, Phase 3 of the ARRA requires an expedited submittal by December 1, 2009 for final documents and construction to be initiated in 2010; and

 

Whereas, To meet the eligibility requirements of ARRA, these projects are to be let to contract by the WISDOT in February 2010 and construction is to be completed thereafter; and

 

Whereas, The City engineering review and construction oversight and some items proposed for construction, including  utility adjustments for sewer and water, are nonparticipating items to be funded 100% by the City; and

 

Whereas, It is in the public’s interest to design and construct with City and ARRA funding the following improvements:

 

1st Aldermanic District:

 

North Sherman Boulevard - W. Silver Spring Dr. to W. Florist Ave. (ARRA) (2155-02-02) (ST52009XXXX):  Paving the roadway with asphalt, replace curb and gutter and sidewalk where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $600,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

North Sherman Boulevard - W. Silver Spring Dr. to W. Florist Ave. (ARRA) (2155-02-72) (ST52009XXXX):  Paving the roadway with asphalt, replace curb and gutter and sidewalk where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $600,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

North Teutonia Avenue - W. Mill Rd. to W. Silver Spring Dr. (ARRA) (2984-03-70) (ST520-09-0210): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $570,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

North Teutonia Avenue - W. Good Hope Rd. to W. Mill Rd. (ARRA) (2984-03-70) (ST520-09-0310): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $625,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

3rd and 6th Aldermanic Districts:

 

North Dr. Martin Luther King Jr. Drive - W. McKinley Ave. to W. W. Burleigh St. (ARRA) (2984-03-70) (ST520-09-0410): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $1,475,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

4th and 6th Aldermanic Districts:

 

West Winnebago Street - N. 8th Street to N. 7th Street (ARRA) (2057-01-00) (ST52009XXXX):  Roundabout (Non-assessable Paving Fund -- $150,000).  The total estimated cost for this project including the requested amount is $910,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

West Winnebago Street - N. 8th Street to N. 7th Street (ARRA) (2057-01-70) (ST52009XXXX):  Roundabout (Non-assessable Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $910,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

4th and 12th Aldermanic Districts:

 

South 2nd Street - W. National Ave. to W. St. Paul Ave. (ARRA) (2445-02-00) (ST520-09-XXXX):  Decorative street lighting fixtures and poles.  (Non-assessable Paving Fund -- $95,000)  The total estimated cost for this project including the requested amount is $672,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

South 2nd Street - W. National Ave. to W. St. Paul Ave. (ARRA) (2445-02-70) (ST520-09-XXXX):  Decorative street lighting fixtures and poles.  (Non-assessable Paving Fund -

$10,000) The total estimated cost for this project including the requested amount is $672,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

6th Aldermanic District:

 

E/W North Avenue - N. Dr. Martin Luther King Jr. Dr. to N. Booth St. (ARRA) (2445-07-00) (ST52009XXXX):  Street reconstruction, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding and grading.  (Non-assessable Paving Fund -- $60,000)  The total estimated cost for this project including the requested amount is $2,443,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

E/W North Avenue - N. Dr. Martin Luther King Jr. Dr. to N. Booth St. (ARRA) (2445-07-70) (ST52009XXXX):  Street reconstruction, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding and grading.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $2,443,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

6th and 15th Aldermanic Districts:

 

West Locust Street - W. Hopkins St. to W. W. Burleigh St. (ARRA) (2984-03-70)  (ST520-09-0510): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $456,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

11th Aldermanic District:

 

West Howard Avenue - S. 84th St. to S. 76th St. (ARRA) (ST520-09-0610): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $320,000.  This project is anticipated to be completed during the 2010 construction season if ARRA construction funds become available.  Otherwise, the design will be used in conjunction with a future paving program, subject to Common Council approval.

 

12th Aldermanic District:

 

West Lapham Boulevard - S. 11th St. to S. 1st St. (ARRA) (2984-04-70) (ST520-09-0710): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $580,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

South Cesar E. Chavez Drive - W. Greenfield Ave. to W. Pierce St. (ARRA) (2615-00-72) (ST520-09-0110):  Paving the roadway with asphalt, replace curb and gutter and  sidewalk  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project, including the requested amount is $1,260,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

South Cesar E. Chavez Drive - W. Greenfield Ave. to W. Pierce St. (ARRA) (2615-00-03) (ST52009XXXX):  Streetscaping  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project, including the requested amount is $920,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

South Cesar E. Chavez Drive - W. Greenfield Ave. to W. Pierce St. (ARRA) (2615-00-73) (ST52009XXXX):  Streetscaping  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project, including the requested amount is $920,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

 

South 13th Street - W. Cleveland Ave. to W. Windlake Ave. (ARRA) (2505-08-00) (ST52009XXXX):  Street reconstruction and replace curb and gutter, sidewalk and driveway approaches where necessary, sodding and grading.  (Non-assessable Paving Fund -- $60,000)  The total estimated cost for this project including the requested amount is $2,039,230.  This project is estimated to be completed during the 2010 construction season with ARRA construction funds. 

 

South13th Street - W. Cleveland Ave. to W. Windlake Ave. (ARRA) (2505-08-70) (ST52009XXXX):  Street reconstruction and replace curb and gutter, sidewalk and driveway approaches where necessary, sodding and grading.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $2,039,230.  This project is estimated to be completed during the 2010 construction season with ARRA construction funds.

 

12th and 14th Aldermanic Districts:

 

Kinnickinnic River Bicycle Trail - S. 6th St. from E. Rosedale to E. Washington St. (ARRA) (2967-00-00) ST52009XXXX):  Rehabilitate the bridge over Greenfield Avenue and remove the bridge over Kinnickinnic Avenue.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $457,500.  This project is estimated to be completed during the 2010 construction season with ARRA construction funds.

 

Kinnickinnic River Bicycle Trail - S. 6th St. from E. Rosedale to E. Washington St. (ARRA) (2967-00-70) ST52009XXXX):  Rehabilitate the bridge over Greenfield Avenue and remove the bridge over Kinnickinnic Avenue.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $457,500.  This project is estimated to be completed during the 2010 construction season with ARRA construction funds.

 

13th Aldermanic District:

 

West Bolivar Avenue - S. 27th St. to S. 20th St. (ARRA) (ST520-09-0801): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $25,000)  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

West Bolivar Avenue - S. 27th St. to S. 20th St. (ARRA) (2984-04-70) (ST520-09-0810): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

South 6th Street - W. Howard Ave. to W. Holt Ave. (ARRA) (ST520-09-0901): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $25,000)  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

South 6th Street - W. Howard Ave. to W. Holt Ave. (ARRA) (2984-04-70) (ST520-09-0910): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

13th and 14th Aldermanic Districts:

 

West Holt Avenue - S. 6th St. to S. Chase Ave. (ARRA) (ST520-09-1001): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $20,000)  The total estimated cost for this project including the requested amount is $355,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

West Holt Avenue - S. 6th St. to S. Chase Ave. (ARRA) (2984-04-70)  (ST520-09-1010): Paving the roadway with asphalt and replace curb and gutter where necessary.  (Non-assessable Paving Fund -- $10,000)  The total estimated cost for this project including the requested amount is $355,000.  This project is anticipated to be completed during the 2010 construction season with ARRA construction funds. 

 

; now, therefore, be it

 

Resolved, That all City departments are authorized to do engineering review and construction oversight in the construction of said projects; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is hereby authorized and directed to create within the Capital Grant and Aid Fund the appropriate Project/Grant Chartfield Value for these projects; and to transfer to these accounts the amounts indicated above in accordance with City accounting policy, but not to exceed a ten percent increase of the total amounts reserved for the local share or $5,000; whichever is greater.

 

Requestor

Department of Public Works

Drafter

Infrastructure Services Division

LCG: ns

September 2, 2009