Number
241329
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $4,379,000 for a total estimated cost of these projects being $24,824,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $4,379,000 with the total cost estimated to be $24,824,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
4th Aldermanic District
W. Everett St. (Extended) - 175’ West of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. (SM495240066) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $86,000. This project is anticipated to be completed during the 2025 construction season.
Highland Avenue Lift Bridge (100 West) over the Milwaukee River (BR100250113): In Depth Inspection of Lift Bridge Hydraulic, Mechanical, and Electrical Systems. (City Share Non-assessable Structure Fund - $500,000). The total estimated cost for this project is $500,000. This project is anticipated to be completed during the 2025 construction season.
4th and 6th Aldermanic District
Juneau Avenue Lift Bridge (100 East) over the Milwaukee River (BR100250106): Preliminary engineering for bridge repair. (City Share Non-assessable Structure Fund - $100,000). The total estimated cost for this project is $500,000. This project is anticipated to be completed during the 2026 construction season.
4th and 12th Aldermanic District
16th Street Viaduct over the Menomonee River Expansion Joint Replacement (BR100250110): (City Share Non-assessable Structure Fund - $75,000). The total estimated cost for this project is $675,000. This project is anticipated to be completed during the 2026 construction season.
16th Street Viaduct over the Menomonee River (BR100250111): In Depth Inspection of Viaduct Unit 1 to Unit 17 (City Share Non-assessable Structure Fund - $200,000). The total estimated cost for this project is $200,000. This project is anticipated to be completed during the 2025 construction season.
6th Aldermanic District
E. Brown St. - 140’ West of N. Hubbard St. to N. Hubbard St. (SM495240071) Installing new combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $73,000. This project is anticipated to be completed during the 2025 construction season.
6th and 7th Aldermanic Districts
W. Burleigh St. - W. Hopkins St. to N. Sherman Bd. (ST216250102) Asphalt surface overlay and ADA ramps (Nonassessable High Impact Paving Fund -- $50,000). The total estimated cost of this project including the requested amount is $700,000. This project is anticipated to be completed during the 2025 construction season.
7th Aldermanic District
N. 24th Pl. - W. Burleigh St. to W. Auer Ave. (SM495240060) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $276,000. This project is anticipated to be completed during the 2025 construction season.
N. 28th St. - W. Auer Ave. to W. Concordia Ave. (SM495240061) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $258,000. This project is anticipated to be completed during the 2025 construction season.
W. Auer Ave. - N. 26th St. to N. 27th St. (SM495240062) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $122,000. This project is anticipated to be completed during the 2025 construction season.
W. Burleigh St. - N. 20th St. to N. 21st St. (SM495240064) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $122,000. This project is anticipated to be completed during the 2025 construction season.
W. Concordia Ave. - N. 27th St. to 150’ +/- West of N. 28th St. (SM495240063) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $162,000. This project is anticipated to be completed during the 2025 construction season.
8th Aldermanic District
W. Arthur Ave. - S. 30th St. to S. 31st St. (SM495240054) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $103,000. This project is anticipated to be completed during the 2025 construction season.
W. Lincoln Ave. - S. 31st St. to S. 32nd St. (SM495240055) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $95,000. This project is anticipated to be completed during the 2025 construction season.
9th Aldermanic District
W. Greenwood Tr. - N. 87th St. to N. 89th St. (SM495240070) Installing new storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $197,000. This project is anticipated to be completed during the 2025 construction season.
10th Aldermanic District
W. Fairview Ave. - 170’ Southeast of N. 59th St. to 175’ Southwest of N. 60th St. (SM495240069) Relaying storm sewer and relocation. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $177,000. This project is anticipated to be completed during the 2025 construction season.
11th Aldermanic District
S. 40th St. - W. Euclid Ave. to 210’ +/- South of W. Euclid Ave. (SM495240056) Relaying sanitary and storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $110,000. This project is anticipated to be completed during the 2025 construction season.
S. 41st St. - W. Euclid Ave. to 210’ +/- South of W. Euclid Ave. (SM495240057) Relaying sanitary and storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $113,000. This project is anticipated to be completed during the 2025 construction season.
12th Aldermanic District
S. 19th St. - W. Grant St. to W. Lincoln Ave. (SM495240067) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $215,000. This project is anticipated to be completed during the 2025 construction season.
12th and 14th Aldermanic Districts
S. 1st St. - S. Chase Av. to W. Lincoln Av. (ST216250101) Asphalt surface overlay and ADA ramps. (Nonassessable High Impact Paving Fund -- $20,000). The total estimated cost of this project including the requested amount is $300,000. This project is anticipated to be completed during the 2025 construction season.
13th Aldermanic District
W. Abbot Ave. - 320’ East of S. 15th Pl. to 100’ East of S. 15th Pl. (SM495240065) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $62,000. This project is anticipated to be completed during the 2025 construction season.
13th and 14th Aldermanic Districts
S. 4th St. - W. Holt Ave. to 100’ +/- South of W. Morgan Ave. (SM495240068) Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $186,000. This project is anticipated to be completed during the 2025 construction season.
14th Aldermanic District
S. Delaware Ave. - 320’ +/- North of E. Morgan Ave. to E. Morgan Ave. (SM495240058) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $113,000. This project is anticipated to be completed during the 2025 construction season.
E. Morgan Ave. - S. New York Ave. to S. Delaware Ave. (SM495240059) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $82,000. This project is anticipated to be completed during the 2025 construction season.
Various Aldermanic Districts
Administration cost for high impact paving engineering (ST216250001): Nonassessable High Impact Paving Fund -- $1,500,000). The total 2025 budget for the high impact resurface program is $12,000,000.
Administration cost for street paving engineering (ST211250001): (Nonassessable Reconstruction Paving Fund -- $750,000). The total 2025 budget for the street resurface/reconstruction program is $5,500,000.
Administration cost for Sidewalk Replacement (ST230250001) Laying concrete walk. Doing all necessary grading pertaining to said work. (Non- Assessable Sidewalk Reconstruction Paving Fund -- $150,000). The total 2025 budget for the sidewalk replacement program is $1,500,000.
Administration cost for 2024 Alley Paving (ST212250001) (Nonassessable Alley Paving Fund -- $125,000). The total 2025 budget for alley paving is $400,000.
Administration cost for 2025 Bike Infrastructure engineering (ST260250001) (Nonassessable Bike Infrastructure Fund -- $100,000). The total 2025 budget for the Bike Infrastructure program is $750,000.
Bridge Indirect and Administration (BR100250101): Preliminary engineering and administration of bridge projects. (City share Non-assessable Structure Fund $175,000). The total estimated cost for this project is $175,000. This project is anticipated to be completed during the 2025 construction season.
Bridge Safety Inspection (BR100250102): Federal and State mandated safety inspection of in-service bridges. (City share Non-assessable Structure Fund $300,000). The total estimated cost for this project is $300,000. This project is anticipated to be completed during the 2025 construction season.
Miscellaneous Bridge Design (BR100250103): Engineering related to various bridge maintenance projects. (City Share Non-assessable Structure Fund - $100,000). The total estimated cost for this project is $100,000. The project is anticipated to be completed during the 2025 construction season.
High impact paving: N. 50th, N. 67th, N. 69th, N. 77th, N. 78th, N. 79th, N. 86th, N. 87th, N. 90th, N. 97th, N. 99th, W. Cheyenne, W. Locust, W. Nash, W. Parkland, W. Rochelle, W. Sheridan. W. Villa; Group 1 (ST216250103) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $100,000). The total estimated cost of this project including the requested amount is $1,600,000. This project is anticipated to be completed during the 2025 construction season.
High impact paving: N. 19th, N. 26th, N. 31st, N. Bartlett, N. Blaine, W. Concordia, W. Congress, W. Courtland, E. Hartford, E. La Fayette, E. Locust, W. Locust, N. Newhall, N. Richards, N. Terrace, W. Vienna, E. Windsor; Group 2 (ST216250104) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $100,000). The total estimated cost of this project including the requested amount is $1,700,000. This project is anticipated to be completed during the 2025 construction season.
High impact paving: N. 51st, N. 53rd, S. 57th, N. 58th, N. 60th, S. 85th, S. 86th, W. Dakota, W. Dickinson, W. Holt, W. Park Hill, W. Stack, S. Tennessee; Group 3 (ST216250105) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $70,000). The total estimated cost of this project including the requested amount is $1,100,000. This project is anticipated to be completed during the 2025 construction season.
High impact paving: S. 5th, S. 22nd, W. Arthur, S. Austin, W. Becher, W. Bruce, W. Halsey, E. Howard, S. Linebarger, S. Logan, W. Pierce, S. Superior; Group 4 (ST216250106) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $70,000). The total estimated cost of this project including the requested amount is $1,100,000. This project is anticipated to be completed during the 2025 construction season.
Citywide
Material Inspection at Various Locations. (WT410250880) Water main inspection. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $40,000. This project is anticipated to be completed during the 2025 construction season.
Suburban Plan Reviews. (WT410250800) Water main plan review. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $25,000. This project is anticipated to be completed during the 2025 construction season.
Water Alterations - Developer Funded (WT410250300) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $25,000. This project is anticipated to be completed during the 2025 construction season.
Water Repairs/Distribution Referred. (WT410250840) Water main repairs. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2025 construction season.
Work by Done by Contractor/Paving. (WT410250750) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2025 construction season.
Work by Done by Contractor/Sewer Alterations. (WT410250770) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2025 construction season.
Work by Milwaukee Water Works Prior to Paving. (WT410250730) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2025 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck/mdz
NPR 6 Sub
1/3/25