File #: 021411    Version:
Type: Resolution Status: Passed
File created: 1/22/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/11/2003
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS
Attachments: 1. Infr. Serv. Div. cover letter.pdf, 2. FISCAL NOTE.pdf

 

Number

021411

Version

SUBSTITUTE 1

Reference

991203

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. Green Bay Ave. (Including Structure) – W. Villard Ave. to City Limits North (A point north of W. Silver Spring Dr.) (Including W. Silver Spring Dr. Interchange Ramps) (ST32092601) (2565-00-72/2565-03-71) File Numbers 991203/891473:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Assessable State Aid Fund -- $15,800; Nonassessable State Aid Fund -- $86,000; State or Federal Funds -- $803,500; State/Federal Grantor Paving Fund -- $122,000; State or Federal Structure Funds -- $505,500; State/Federal Grantor Structure Fund -- $76,000)  These funds are to be transferred to the construction account ST32092610.

 

4th Aldermanic District

 

Alley between W. Cherry St., W. Vliet St., N. 30th St., and N. 31st St. (ST212030128) File Number 020020:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $35,200; Nonassessable Alley Paving Fund -- $21,100)

 

8th Aldermanic District

 

Alley between W. Evergreen Ln., S. Layton Bl., W. Pierce St., and S. 28th St. (ST212020111) File Number 000779:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches,  grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $39,800; Nonassessable Alley Paving Fund -- $23,700)

 

12th Aldermanic District

 

Alley between W. Historic Mitchell St., W. Maple St., S. 5th St., and S. 6th St. (East West Leg) (ST212020113) File Number 000779:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $27,200; Nonassessable Alley Paving Fund -- $12,200)

 

Alley between W. Lapham Bl., W. Orchard St., S. 5th St., and S. 6th St. (ST212020109) File Number 960740:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $67,800; Nonassessable Alley Paving Fund -- $20,000)

 

Alley between W. National Ave., W. Walker St., S. 5th St., and S. 6th St. (ST212030126) File Number 871700:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $36,500: Nonassessable Alley Paving Fund -- $10,000)

 

Alley between W. Scott St., W. Washington St., S. 3rd St., and S. 4th St. (ST212030111) File Number 011048:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $30,000; Nonassessable Alley Paving Fund -- $10,000

 

13th Aldermanic District

 

S. 20th St. – W. Howard Ave. to W. Morgan Ave. (ST32092001) (2275-00-72) File Number 990562:  Concrete pavement reconstruction, replace all curb and gutter and sidewalk, replace driveway approaches where needed, sodding, and grading. (Assessable State Aid Fund -- $62,800; Nonassessable State Aid Fund -- $117,000; State or Federal Funds -- $571,000; State/Federal Grantor Paving Fund -- $88,000) These funds are to be transferred to the construction account ST32092010.

 

13th and 14th Aldermanic Districts

 

S. Howell Ave. (Excluding Structure) – E. Wilbur Ave. to E. Oklahoma Ave. (ST30582201) (2060-07-71) File Number 950706:   Concrete pavement reconstruction.  Narrow the existing roadway to 48 feet.  Replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Assessable State Aid Fund -- $80,300; Nonassessable State Aid Fund -- $267,000; State or Federal Funds -- $1,060,000; State/Federal Grantor Paving Fund -- $164,000) These funds are to be transferred to the construction account ST30582210.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances, and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the City Engineer and the Commissioner of Public Works are hereby authorized to negotiate and enter into an agreement with the State of Wisconsin, Department of Transportation for the City to undertake construction management duties on the following projects: N. Green Bay Ave. (Including Structure) – W. Villard Ave. to City Limits North (A point north of W. Silver Spring Dr.) (Including W. Silver Spring Dr. Interchange Ramps) (ST32092601)(2565-00-72/2565-03-71), S. Howell Ave. (Excluding Structure) – E. Wilbur Ave. to E. Oklahoma Ave. (ST30582201) (2060-07-71), and S. 20th St. – W. Howard Ave. to W. Morgan Ave. (ST32092001) (2275-00-72); and, be it

 

Further Resolved, That the City Engineer is authorized and directed to approve and make periodic payments to the State of Wisconsin, Department of Transportation after receipt of invoices from said State for the City's share of the costs for said projects:  N. Green Bay Ave. (Including Structure) – W. Villard Ave. to City Limits North (A point north of W. Silver Spring Dr.) (Including W. Silver Spring Dr. Interchange Ramps) (ST32092601)(2565-00-72/2565-03-71), S. 20th St. – W. Howard Ave. to W. Morgan Ave. (ST32092001) (2275-00-72) and S. Howell Ave. (Excluding Structure) – E. Wilbur Ave. to E. Oklahoma Ave. (ST30582201) (2060-07-71); and, be it

 

Further Resolved, That upon the completion of projects: N. Green Bay Ave. (Including Structure) – W. Villard Ave. to City Limits North (A point north of W. Silver Spring Dr.) (Including W. Silver Spring Dr. Interchange Ramps) (ST32092601)(2565-00-72/2565-03-71), S. 20th St. – W. Howard Ave. to W. Morgan Ave. (ST32092001) (2275-00-72), and S. Howell Ave. (Excluding Structure) – E. Wilbur Ave. to E. Oklahoma Ave. (ST30582201) (2060-07-71) and a determination of the actual costs, it is understood that if the City of Milwaukee's share is less than the amount previously paid, the difference will be refunded to said City; and, be it

 

Further Resolved, That projects: N. Green Bay Ave. (ST32092601)(2565-00-72/2565-03-71), Alley W. Cherry St. (ST212030128), Alley W. Evergreen Ln. (ST212020111), S. 20th St. (ST32092001) (2275-00-72), and S. Howell Ave. (ST30582201) (2060-07-71)  will be billed after January 1, 2005; and Alley W. Historic Mitchell St. (ST212020113), Alley W. Lapham Bl. (ST212020109), Alley W. National Ave. (ST212030126), and Alley W. Scott St. (ST212030111) will be billed after January 1, 2006, but not before 12 months after the project contract has been completed.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk