Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $20,910,000 for a total estimated cost of these projects being $21,811,000 of which $16,263,000 is for projects that have been submitted to the Wisconsin Department of Natural Resources for consideration for American Recovery and Reinvestment Act (ARRA) funding.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Revised fiscal note, 3. Fiscal note, 4. Sub. 2 Fiscal note, 5. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
8/5/20092 MAYOR SIGNED   Action details Meeting details Not available
7/28/20092 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
7/28/20092 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
7/28/20091 PUBLIC WORKS COMMITTEE RECONSIDEREDPass4:0 Action details Meeting details Not available
7/28/20091 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A offered.
Pass4:0 Action details Meeting details Not available
7/28/20092 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Erick Shambarger, Dept. of Admin., Budget & Management Div.
Pass4:0 Action details Meeting details Not available
7/15/20091 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works, Infrastructure Services
Pass5:0 Action details Meeting details Not available
7/10/20091 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
7/10/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/7/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

090317

Version

SUBSTITUTE 2

Reference

081588

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $20,910,000 for a total estimated cost of these projects being $21,811,000 of which $16,263,000 is for projects that have been submitted to the Wisconsin Department of Natural Resources for consideration for American Recovery and Reinvestment Act (ARRA) funding.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $20,910,000.  The total estimated cost of these projects is $21,811,000.

 

Projects totaling $16,263,000 million in this file include 2010 sewer projects that have been accelerated to qualify for the WDNR Clean Water Fund program as part of the American Recovery and Reinvestment Act (ARRA) stimulus program.  To qualify for funding, ARRA projects must be under contract by October 1st, 2009.   In order to place projects under contract by October 1st, projects need both Public Works Committee construction approval and budget authority.  This file achieves the former.  Council file 090330, if amended, will include up to $16.3 million in contingent borrowing authority.  This will allow the Comptroller's Office to certify funding for these projects ahead of the WDNR's decision to award the Clean Water Funding.  The 2010 Sewer Maintenance Fund capital budget will be reduced to reflect projects funded with 2009 contingent borrowing authority.

 

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas,  Common Council file 081478 directed the appropriate City of Milwaukee officials and City departments to apply for economic stimulus funds for qualifying City projects in accordance with the federal American Recovery and Reinvestment Act (ARRA); and


Whereas, The Department of Public works applied for sewer project funding from the Clean Water Fund, administered by the Wisconsin Department of Natural Resources; and

 

Whereas, The available 2009 Clean Water Fund appropriations were greatly increased due to ARRA funding; and

 

Whereas, The Clean Water Funds will be awarded as a combination of low-interest loans and grants; and

 

Whereas, As a condition to receive ARRA funding, construction projects must be bid and under contract with a vendor by October 1st, 2009; and

 

Whereas, $16,263,000 of these projects do not have existing budget authority currently available to the Department of Public Works for construction; and

 

Whereas, Contingent borrowing authority may be necessary for the Comptroller’s Office to certify available funds for the projects ahead of the ARRA awards; and

 

Whereas, Council file 090330, if amended, will include up to $16.3 million in contingent borrowing authority; and

 

Whereas, Existing sewer capital accounts have $8,735,000 in appropriation authority that the Comptroller’s Office has assigned to department 9990 in the event that the sewer projects are funded through revenue bonds requiring a reserve; and

 

Whereas, The full $8,735,000 may not be needed if Clean Water Fund low-interest loans and grants are used to fund capital projects; and

 

Whereas, The amount of contingent borrowing may be reduced at the Comptroller’s discretion by assigning existing sewer capital budget authority assigned to department 9990 to the Department of Public Works to fund project construction; and

 

Whereas, The 2010 Sewer capital program will be reduced to reflect projects funded through contingent borrowing; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

1st Aldermanic District

 

W. Congress St. - N. 17th St. to N. 18th St. (SM495090025) File Number 081588: Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $59,000).  The total estimated cost for this project including the requested amount is $74,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Cornell St. - N. 22nd St. to N. 23rd St. (SM495090036) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $64,000).  The total estimated cost for this project including the requested amount is $79,000.  This project is anticipated to be completed during the 2009 construction season.

 

Area bounded by W. Hampton Ave. to W. Olive St. and N. 17th St. to N. 24th Pl. (SM495090022) File Number 081588: Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $1,380,000).  The total estimated cost for this project including the requested amount is $1,395,000.  This project is anticipated to be completed during the 2009-2010 construction season. (ARRA)

 

W. Hampton Ave. - N. 20th St. to N. 24th Pl. (SM495090040) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $335,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Roosevelt Dr. - N. 21st St. to W. Congress St. (SM495090035) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $37,000).  The total estimated cost for this project including the requested amount is $52,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 18th St. - 270 feet m/l north of W. Olive St. to W. Congress St. (SM495090042) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $132,000).  The total estimated cost for this project including the requested amount is $147,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 19th Pl. - W. Olive St. to W. Congress St. (SM495090032) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $170,000).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 19th St. - W. Olive St. to W. Congress St. (SM495090033) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $170,000).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 21st St. - W. Roosevelt Dr. to W. Cornell St. (SM495090034) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $188,000).  The total estimated cost for this project including the requested amount is $203,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 22nd St. - W. Congress St. to W. Cornell St. (SM495090039) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $253,000).  The total estimated cost for this project including the requested amount is $268,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 23rd St. - W. Ruby Ave. to W. Cornell St. (SM495090037) File Number 081588: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $148,000).  The total estimated cost for this project including the requested amount is $163,000.  This project is anticipated to be completed during the 2009 construction season.

 

1st, 6th, 7th Aldermanic Districts

 

Area bounded by W. Capitol Dr., W. Nash St. and N. 27th St. to N. 31st St. (SM495090063) File Number 090194: Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $521,000).  The total estimated cost for this project including the requested amount is $536,000.  This project is anticipated to be completed during the 2009-2010 construction season. (ARRA)

 

2nd, 5th, 10th Aldermanic Districts

 

Area bounded by W. Hampton Ave. to W. Nash St. and N. 68th St. to N. 91st St. (SM495090056) File Number 090194: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $2,793,000).  The total estimated cost for this project including the requested amount is $2,808,000.  This project is anticipated to be completed during the 2009-2010 construction season. (ARRA)

 

3rd Aldermanic District

 

E. Belleview Pl. - N. Downer Ave. to N. Stowell Ave. (SM495090065) File Number 090316: Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $88,000).  The total estimated cost for this project including the requested amount is $89,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. Cambridge Ave. - E. Locust St. to E. North Ave. (SM495090045) File Number 081678: Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $3,245,000).  The total estimated cost for this project including the requested amount is $3,270,000.  This project is anticipated to be completed during the 2010 construction season. (ARRA)

 

N. Cambridge Ave. - E. Newport Ave. to E. Locust St. (SM495090046) File Number 081678: Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $4,425,000).  The total estimated cost for this project including the requested amount is $4,450,000.  This project is anticipated to be completed during the 2010 construction season. (ARRA)

 

N. Hackett Ave. - N. Downer Ave. to E. Park Pl.  (SM495090066) File Number 090316: Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $115,000).  The total estimated cost for this project including the requested amount is $116,000.  This project is anticipated to be completed during the 2009 construction season.

 

E. Park Pl. - N. Hackett Ave. to N. Summit Ave. (SM495090064) File Number 090316: Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $68,000).  The total estimated cost for this project including the requested amount is $69,000.  This project is anticipated to be completed during the 2009 construction season.

 

5th Aldermanic District

 

Area bounded by W. Melvina St. to W. Auer Ave. and N. 83rd St. to N. Argonne Dr. (SM495090021) File Number 081588: Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $3,060,000).  The total estimated cost for this project including the requested amount is $3,075,000.  This project is anticipated to be completed during the 2009-2010 construction season. (ARRA)

 

6th Aldermanic District

 

N. Holton St. at E. Townsend St. (ST04083900) File Number 090074: Special treatment including removal of railroad crossings (DCD/BID-36 Nonassessable Funds -- $115,000). The total estimated cost for this project is $115,000.  This project is anticipated to be completed during the 2009 construction season.

 

9th Aldermanic District

 

W. Rohr Ave. - N. Sherman Blvd. to N. 46th St. (WT410071085) File Number 051658: Relay water main. (Nonassessable Water Fund -- $215,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 46th St. - W. Villard Ave. to W. Rohr Ave. (WT410071084) File Number 051658: Relay water main. (Nonassessable Water Fund -- $175,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2009 construction season.

 

10th Aldermanic District

 

W. Wells St. - N. 45th Pl. to 360 feet west of N. 45th Pl. (WT410081002) File Number 070266: Relay water main. (Nonassessable Water Fund -- $70,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 42nd St. - W. St. Paul Ave. to 200 feet north of W. St. Paul Ave. (WT410071062) File Number 051658: Relay water main. (Nonassessable Water Fund -- $50,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 45th Pl. - W. Wisconsin Ave. to W. Wells St. (WT410081001) File Number 070266: Relay water main. (Nonassessable Water Fund -- $110,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 59th St. - 300 feet m/l south of W. St. Paul Ave. to W. Blue Mound Rd. (SM495090060) File Number 090194: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $142,000).  The total estimated cost for this project including the requested amount is $157,000.  This project is anticipated to be completed during the 2009 construction season.

 

11th Aldermanic District

 

W. Crawford Ave. - S. 48th St. to S. 50th St. (WT410071054) File Number 051658: Relay water main. (Nonassessable Water Fund -- $70,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Lynndale Ave. - S. 48th St. to S. 50th St. (WT410071056) File Number 051658: Relay water main. (Nonassessable Water Fund -- $150,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2009 construction season.

 

Area bounded by W. Wilbur Ave. to W. Howard Ave. and S. 51st St. to S. 53rd St. (SM495090062) File Number 090194: Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $839,000).  The total estimated cost for this project including the requested amount is $854,000.  This project is anticipated to be completed during the 2009-2010 construction season. (ARRA)

 

S. 48th St. - W. Crawford Ave. to W. Tripoli Ave. (WT410071053) File Number 051658: Relay water main. (Nonassessable Water Fund -- $70,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 48th St. - W. Tripoli Ave. to W. Howard Ave. (WT410071055) File Number 051658: Relay water main. (Nonassessable Water Fund -- $130,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 50th St. - W. Crawford Ave. to W. Howard Ave. (WT410071057) File Number 051658: Relay water main. (Nonassessable Water Fund -- $135,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 68th St. at W. Howard Ave. (WT410091423) File Number 080237: Relay water main. (Nonassessable Water Fund -- $55,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2009 construction season.

 

12th Aldermanic District

 

W. National Ave. at S. 9th St. Site Investigation (SM494090104): Soil borings and ground water monitoring. (Nonassessable I & I (Infiltration and Inflow) Reduction Fund -- $13,000).  The total estimated cost for this project including the requested amount is $14,000.  This project is anticipated to be completed during the 2009 construction season.

 

13th Aldermanic District

 

S. 27th St. - W. Clayton Crest Ave. to W. Grange Ave. (WT410091422) File Number 071573: Relay water main. (Nonassessable Water Fund -- $350,000).  The total estimated cost for this project including the requested amount is $370,000.  This project is anticipated to be completed during the 2009 construction season.

 

14th Aldermanic District

 

E. Oklahoma Ave. at S. Logan Ave. (ST211090142) File Number 081678: Median installation. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2009 construction season.

 

15th Aldermanic District

 

W. Fond du Lac Ave. at N. 18th St. (ST211090130) File Number 080660: Median alteration. Remove and replace curb and gutter and sidewalk as necessary. (Nonassessable Reconstruction Paving Fund -- $70,000).  The total estimated cost for this project is $82,000.  This project is anticipated to be completed during the 2009-2010 construction season.

 

City of Greenfield

 

W. Edgerton Ave. at S. 43rd St. (WT410081104) File Number 070266: Water main alteration. (Nonassessable Water Fund -- $680,000).  The total estimated cost for this project including the requested amount is $700,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Edgerton Ave. at S. 60th St. (WT410081103) File Number 070266: Water main alteration. (Nonassessable Water Fund -- $155,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2010 construction season.

 

Various Locations

 

Stormwater Quality Treatment Devices (SM493090104) File Number 090013: (Nonassessable Sewer Fund-TSS Removal Fund -- $45,000 Additional Funds).  The total estimated cost for this project including the requested amount is $415,000.  This project is anticipated to be completed during the 2009 construction season.

 

; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Nfr 15

07/27/09

 

9/14/09 Technical correction made. TJM