powered help
header-left header-center header-right
File #: 991065    Version: 0
Type: Ordinance Status: Passed
File created: 10/19/1999 In control: ZONING, NEIGHBORHOODS & DEVELOPMENT COMMITTEE
On agenda: Final action: 11/9/1999
Effective date: 11/24/1999    
Title: An ordinance relating to the building code requirements for abandoned sewer and water plumbing connections.
Sponsors: THE CHAIR
Indexes: BUILDING CODE, PLUMBING CODE, SEWERS, WATER

NUMB:

991065

VERS:

ORIGINAL

REF:

 

XXBY:

THE CHAIR

TITL:

An ordinance relating to the building code requirements for abandoned sewer and water plumbing connections.

SECS:

225-9-1 am

225-9-2 am

225-9-5 am

ANLS:

- Analysis -

 

This ordinance brings building code into conformance with state requirements for abandoned sewer and water plumbing connections.

BODY:

The Mayor and Common Council of the City of Milwaukee do ordain as follows:

 

Part 1. Section 225-9-1 and 2 of the code is amended to read:

 

225-9. Abandonment of Sewer and Water Connections. 1. Any person, firm or corporation demolishing or moving a building or structure that is served by a [[sewer or water or both]] >>storm, sanitary, combination sewer or water service<< shall engage a licensed master plumber under a permit to properly abandon [[the building sewer or water service or both]] >>such service or services<< immediately inside the front lot line on private property. The plumbing permit shall be obtained from the department of city development before the commissioner of city development may issue a permit to demolish or move a building or structure.

 

2.                     The building sewer shall be disconnected at the front lot line and a pie or bulkhead installed. On a vitrified clay or concrete sewer, a pie shall be cemented into the bell or hub. If the pipe, bell or hub is broken, then a swab and 6 inches of concrete shall be inserted in the sewer as a permanent bulkhead. On a cast iron sewer, a cast iron >>cap or<< plug [[with a lead caulked joint]] shall be installed.

 

Part 2. Section 225-9-5 of the code is amended to read:

 

5.                     The water shall be disconnected at the front lot line and a plug or cap installed. [[On copper pipe, a plugged flared adapter shall be installed. On cast iron pipe, a cast iron plug or cap with a lead caulked joint shall be installed. On lead pipe, a solder joint shall be made.]] >>The copper, cast iron or lead service piping shall be sealed with approved piping material.<<

LRB:

APPROVED AS TO FORM

 

 

____________________________

Legislative Reference Bureau

Date:  _____________________

CATT:

IT IS OUR OPINION THAT THE ORDINANCE

IS LEGAL AND ENFORCEABLE

 

 

___________________________________

Office of the City Attorney

Date:  _____________________

ZDPT:

Department of Neighborhood Services

DFTR:

99336-2

CW

10/1/99