File #: 070944    Version:
Type: Resolution Status: Passed
File created: 10/23/2007 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/21/2007
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $570,000 for a total estimated cost of these projects being $5,886,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Fiscal Note

Number

070944

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $570,000 for a total estimated cost of these projects being $5,886,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $570,000 with the total cost estimated to be $5,886,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

3rd Aldermanic District

 

N. Edison St. - E. Knapp St. to E. Cherry St. (SM495070145):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $131,000.  This project is anticipated to be completed during the 2008 construction season.

 

E. Irving Pl. - N. Cambridge Ave. to N. Prospect Ave. (SM495070144):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $186,000.  This project is anticipated to be completed during the 2008 construction season.

 

8th and 12th Aldermanic Districts

 

W. Forest Home Ave. - W. Historic Mitchell St. to S. 20th St. (SM495070140):  Relaying combined sewer and lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $378,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 13th St. (Various Locations) - W. Forest Home Ave. to W. Lincoln Ave. (SM495070139):  Relaying combined sewer and lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $637,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 14th St. - W. Forest Home Ave. to W. Windlake Ave. (SM495070141):  Relaying combined sewer and lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2008 construction season.

 

13th Aldermanic District

 

W. Aspen St. - S. 17th St. to S. 19th St. (WT410081088):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2008 construction season.

 

W. Jewell Ave. - S. 17th St. to S. 19th St. (WT410081086):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2008 construction season.

 

W. Wood Ave. - S. 17th St. to S. 20th St. (WT410081093):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 13th St. - W. Boden Ct. to W. College Ave. (ST211070174):  Asphalt overlay. The total estimated cost for this project is $150,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 17th St. - W. Jewel Ave. to W. Aspen St. (WT410081087):  Relaying water main. (Nonassessable Water Fund -- $25,000).  The total estimated cost for this project including the requested amount is $390,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 18th St. - W. Wood Ave. to W. Aspen St. (WT410081089):  Relaying water main. (Nonassessable Water Fund -- $20,000). The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 19th St. - W. Aspen St. to a point 175 feet m/l south of W. Aspen St. (WT410081092):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 19th St. - W. Jewel Ave. to W. Wood St. (WT410081091):  Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 20th St. - W. Wood Ave. to a point 1000 feet m/l south of W. Wood Ave. (WT410081090):  Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2008 construction season.

 

14th Aldermanic District

 

S. Austin St. - E. Clarence St. to E. Deer Pl. (SM495070146):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. Burrell St. - E. Smith St. to E. Clarence St. (SM495070131):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $179,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. Lenox St. - E. Linus St. to E. Conway St. (SM495070122):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $82,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. Lenox St. - S. Kinnickinnic Ave. to E. Russell Ave. (SM495070125):  Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $24,000.  This project is anticipated to be completed during the 2008 construction season.

 

E. Linus St. - S. Woodward St. to S. Logan Ave. (SM495070123):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $425,000.  This project is anticipated to be completed during the 2008 construction season.

 

E. Oklahoma Ave. - S. Ellen St. to S. Kinnickinnic Ave. (SM495070163):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $242,000.  This project is anticipated to be completed during the 2008 construction season.

 

15th Aldermanic District

 

W. North Ave. - A point 85 feet m/l east of N. 31st St. to N. 36th St. (SM495070117):  Relaying combined sewer and lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $341,000.  This project is anticipated to be completed during the 2008 construction season.

 

W. North Ave. - N. 39th St. to N. Sherman Blvd. (SM495070118):  Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $461,000.  This project is anticipated to be completed during the 2008 construction season.

 

Various Aldermanic Districts

 

City Wide (SM495070001) File Number 061095:  Engineering studies throughout the City of Milwaukee.  Indirect Account. (Nonassessable Sewer Maintenance Relay Fund - $100,000, additional funds).  File Number 061095 authorized $400,000.  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2007 construction season.

 

Bridge Indirect and Administration. (BR100070105).  (City Share Non-assessable Structure Fund - $50,000, additional funds).  File Number 070081 authorized $40,000.  The total estimated cost of this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2007-2008 construction season.

 

Underwater Dive Inspection of Scour Critical Bridges.  (BR100070106).  (City Share Non-assessable Structure Fund - $125,000).  The total estimated cost of this project is $125,000.  This project is anticipated to be completed during the 2008 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

npr3

10/30/07

Technical correction requested by Mary Dziewiontkoski 10/26/07 completed by jp