Type: Resolution Status: Passed
File created: 4/17/2018 In control: COMMON COUNCIL
On agenda: Final action: 5/8/2018
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,701,100 for a total estimated cost of $2,921,500.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AFR-LTR11 signed.pdf, 2. Official Notice, 3. Notice Published on 05-24-18
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/24/20181 CITY CLERK PUBLISHED   Action details Meeting details Not available
5/17/20181 MAYOR SIGNED   Action details Meeting details Not available
5/8/20181 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
4/25/20180 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 49th St. - W. Villard Ave. to W. Custer Ave. (ST211180105) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 2nd Aldermanic District W. Carmen Ave. - N. 68th St. to N. 76th St. (ST211140127) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (15’ width of tree border area), and grading. Michael Gradus Legislative Assistant stated Ald. Johnson is in support. Ald. Borkowski moved approval. (Prevailed 5-0) N. 87th St. - W. Silver Spring Dr. to W. Fond du lac Ave. (ST211150112) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’width of tree border area), and grading. Michael Gradus Legislative Assistant stated Ald. Johnson is in support. Ald. Donovan moved approval. (Prevailed 5-0) 3rd Aldermanic District N. Summit Ave. - E. Locust St. to E. Kenwood Blvd. (ST211180113) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’width of tree border area), and grading. Ald. Kovac moved approval. (Prevailed 5-0) 4th Aldermanic District W. Clybourn St. - N. 29th St. to N. 35th St. (ST211180180) Install traffic calming speed hump(s). Mike Brower St. Rose Catholic School 540 N 31st St stated he is in support. Darryl Collins St. Rose Catholic School 540 N 31st St stated he is in support. Sherrie Tussler 3402 W St Paul Ave stated she is in support. Pat Curl 3208 W Clybourn Ave stated he is in support. Ald. Murphy moved approval. (Prevailed 5-0) 7th Aldermanic District N. 39th St. -- W. Ruby Ave. to W. Courtland Ave. (ST211050111) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Terry Clayton 4654 N 39th St stated he is opposed because he already pays taxes and would like speed humps. Shirley Keen 4578 N 39th St stated she cannot afford the payment. Juan Contreras 4046 N 39th St stated he wants speed humps. Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Kovac moved to hold to the call of the chair to add speed humps. (Prevailed 5-0) N. 44th St. - W. Townsend St. to W. Keefe Ave. (ST211180185) Install traffic calming speed hump(s). Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Borkowski moved approval. (Prevailed 5-0) N. 49th St. - W. Locust St. to W. Chambers St. (ST211180186) Install traffic calming speed hump(s). Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Kovac moved approval. (Prevailed 5-0) N. 53rd St. - W. Keefe Ave. to W. Nash St. (ST211180187) Install traffic calming speed hump(s). Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Borkowski moved approval. (Prevailed 5-0) 8th Aldermanic District S. 28th St. - W. National Ave. to W. Pierce St. (ST211180115) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 5-0) S. 30th St. - W. Greenfield Ave. to W. Scott St. (ST211180144) Install traffic calming speed hump(s). Javier Corubias 1254 S 30th St stated people drive like crazy and is opposed to the speed humps. Ald. Donovan moved approval. (Prevailed 5-0) 10th Aldermanic District S. 91st St. – A point 300’ south of W. Adler St. to W. Adler St. (ST211070132) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Ald. Murphy moved approval. (Prevailed 5-0) 11th Aldermanic District W. Verona Ct. - S. 77th St. to S. 79th St. (ST211180114) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) S. 54th St. – W. Midland Dr. to W. Forest Home Ave. (ST211180106) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 12th Aldermanic District S. 3rd St. - W. Maple St. to W. Lapham Blvd. (ST21100102) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 4-0) S. 19th St. - W. Lincoln Ave. to W. Grant St. (ST211170135) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) 13th Aldermanic District S. 16th St. - W. Edgerton Ave. to 300 feet north of W. Vogel Ave. (ST211150107) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Witkowski stated he had 1 objector. Ald. Murphy moved approval. (Prevailed 4-0) 15th Aldermanic District W. Clarke St. - N. 23rd St. to N. 24th St. (ST211180188) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. 24th Pl. - W. Clarke St. to W. Center St. (ST211180184) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) N. 24th St. - W. Clarke St. to W. Center St. (ST211180183) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. 41st St. - W. Meinecke Ave. to W. Wright St. (ST211180104) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (4’ width of tree border area), and grading. Linda Martin 2462 N 41st St stated she wants speed humps. Ald. Kovac moved approval. (Prevailed 4-0) Ald. Borkowski moved approval as amended. (Prevailed 5-0)
Pass4:0 Action details Meeting details Video Video
4/17/20180 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

180028

Version

Original

Reference

160587

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,701,100 for a total estimated cost of $2,921,500.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $2,701,100.  The total estimated cost of these projects is $2,921,500.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 49th St. -- W. Villard Ave. to W. Custer Ave. (ST211180105) File Number 160587:

Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading.   (Assessable Reconstruction Paving Fund -- $11,600; Nonassessable Reconstruction Paving Fund -- $185,000).  The total estimated cost for this project including the requested amount is $215,000.  This project is anticipated to be completed during the 2018 construction season.

 

2nd Aldermanic District

 

W. Carmen Ave. -- N. 68th St. to N. 76th St. (ST211140127) File Number 120251:

Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (15’ width of tree border area), and grading.   (Assessable Reconstruction Paving Fund -- $12,100; Nonassessable Reconstruction Paving Fund -- $450,000).  The total estimated cost for this project including the requested amount is $490,000.  This project is anticipated to be completed during the 2018 construction season.

 

 

N. 87th St. --  W. Silver Spring Dr. to W. Fond du lac Ave. (ST211150112) File Number 131474: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $18,200; Nonassessable Reconstruction Paving Fund -- $260,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2018 construction season.

 

3rd Aldermanic District

 

N. Summit Ave. -- E. Locust St. to E. Kenwood Blvd. (ST211180113) File Number 160695: Concrete pavement reconstruction, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $26,100; Nonassessable Reconstruction Paving Fund -- $375,000).  The total estimated cost for this project including the requested amount is $420,000.  This project is anticipated to be completed during the 2018 construction season.

 

4th Aldermanic District

 

W. Clybourn St.--  N. 29th St. to N. 35th St. (ST211180180) File Number 180029:

Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $11,300; Nonassessable Reconstruction Paving Fund -- $33,700). The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2018 construction season. 

 

7th Aldermanic District

 

N. 44th St. --  W. Townsend St. to W. Keefe Ave. (ST211180185)  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,000; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $7,000.  This project is anticipated to be completed during the 2018 construction season. 

 

N. 49th St. -- W. Locust St. to W. Chambers St. (ST211180186)  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,700; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,700.  This project is anticipated to be completed during the 2018 construction season. 

 

N. 53rd St. -- W. Keefe Ave. to W. Nash St. (ST211180187)  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $3,200; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $5,200.  This project is anticipated to be completed during the 2018 construction season. 

8th Aldermanic District

 

S. 28th St. --  W. National Ave. to W. Pierce St. (ST211180115) File Number 161438:

Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $11,600; Nonassessable Reconstruction Paving Fund -- $150,000). The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2018 construction season. 

 

S. 30th St. -- W. Greenfield Ave. to W. Scott St. (ST211180144) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,600; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,600.  This project is anticipated to be completed during the 2018 construction season. 

 

10th Aldermanic District

 

S. 91st St. - A point 300’ south of  W. Adler St. to W. Adler St. (ST211070132) File Number 051328: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $5,500; Nonassessable Reconstruction Paving Fund -- $100,000). The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2018 construction season. 

 

11th Aldermanic District

 

W. Verona Ct. --  S. 77th St. to S. 79th St. (ST211180114) File Number 160695: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 6’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $3,900; Nonassessable Reconstruction Paving Fund -- $100,000). The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2018 construction season. 

 

S. 54th St. - W. Midland  Dr. to W. Forest Home Ave.  (ST211180106) File Number  160587:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $3,600; Nonassessable Reconstruction Paving Fund -- $135,000). The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2018 construction season. 

 

12th Aldermanic District

 

S. 3rd St. --  W. Maple St. to W. Lapham Blvd. (ST21100102) File Number 020390:

Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $16,000; Nonassessable Reconstruction Paving Fund -- $332,000). The total estimated cost for this project including the requested amount is $370,000.  This project is anticipated to be completed during the 2018 construction season. 

 

S. 19th St. --  W. Lincoln Ave. to W. Grant St. (ST211170135) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,800; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $6,800.  This project is anticipated to be completed during the 2018 construction season. 

 

13th Aldermanic District

 

S. 16th St. from W. Edgerton Ave. to 300 feet north of W. Holmes Av. (including W. Vogel Ave). (ST211150107)  File Number 131474: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $9,700; Nonassessable Reconstruction Paving Fund -- $125,000). The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2018 construction season. 

 

15th Aldermanic District

 

W. Clarke St. --  N. 23rd St. to N. 24th St. (ST211180188) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $3,000; Nonassessable Reconstruction Paving Fund -- $3,000). The total estimated cost for this project including the requested amount is $6,000.  This project is anticipated to be completed during the 2018 construction season. 

 

N. 24th Pl. - W. Clarke St. to W. Center St. (ST211180184) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $5,300; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $7,300.  This project is anticipated to be completed during the 2018 construction season. 

 

N. 24th St. -- W. Clarke St. to W. Center St. (ST211180183) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,900; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $6,900.  This project is anticipated to be completed during the 2018 construction season. 

 

 N. 41st St. -- W. Meinecke Ave. to W. Wright St. (ST211180104) File Number 160587: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (3’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $14,300; Nonassessable Reconstruction Paving Fund -- $255,000). The total estimated cost for this project including the requested amount is $290,000.  This project is anticipated to be completed during the 2018 construction season. 

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects: N. 49th St. (ST211180105); W. Carmen Ave. (ST211140127); N. 87th St. (ST211150112); N. Summit Ave. (ST211180113); W. Clybourn St. (ST211180180); N. 44th St. (ST211180185); N. 49th St. (ST211180186); N. 53rd St. (ST211180187); S. 30th St. (ST211180144); S. 28th St. (ST211180115); S. 91st St. (ST211070132); W. Verona Ct. (ST211180114); S. 54th St. (ST211180106);S. 3rd St. (ST21100102); S.19th St. (ST211170135); S.16th St. (ST211150107); W. Clarke St. (ST211180188); N. 24th Pl. (ST211180184); N. 24th St. (ST211180183); N. 41st St. (ST211180104) will be billed after January 1, 2020, but not before 12 months after the project contract has been completed.

 

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Dee  La Belle

Afr11