Number
241472
Version
Substitute 1
Reference
231299
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,553,000 for a total estimated cost of these projects being $4,118,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $3,553,000. The total estimated cost of these projects is $4,118,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
1st and 4th Aldermanic District
2025 N. 27th St. And W. Highland Ave. Bioretention Maintenance (SM499250003) Bioretention maintenance. (Nonassessable Water Quality Fund -- $50,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2025 construction season.
4th and 12th Aldermanic District
2025 Green Highway Maintenance (SM499250006) Green Infrastructure maintenance. (Nonassessable Water Quality Fund -- $75,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2025 construction season.
5th Aldermanic District
Lindsay Park (W. Marion St., W. Congress St., N. 84th St., N 87th St.) (SM499240009) File Number 240812; Installing bioswales. (Nonassessable Water Quality Fund -- $30,000 additional funding). The total estimated cost of this project including the requested amount is $245,000. This project is anticipated to be completed during the 2025 construction season.
7th and 15th Aldermanic District
2025 N. Sherman Blvd. Bioretention Maintenance (SM499250004) Bioretention maintenance. (Nonassessable Water Quality Fund -- $50,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2025 construction season.
10th Aldermanic District
2025 Wisconsin Viaduct Vegetation Management and Monitoring (SM499250005) Vegetation maintenance. (Nonassessable Water Quality Fund -- $10,000). The total estimated cost of this project including the requested amount is $10,000. This project is anticipated to be completed during the 2025 construction season.
Citywide
2025 Existing Speed Hump Maintenance (ST211250103) (Nonassessable Reconstruction Paving Fund -- $100,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2025 construction season.
2025 Northside Bioretention Maintenance (SM499250001) Bioretention maintenance. (Nonassessable Water Quality Fund -- $394,000). The total estimated cost of this project including the requested amount is $394,000. This project is anticipated to be completed during the 2025 construction season.
2025 Southside Bioretention Maintenance (SM499250002) Bioretention maintenance. (Nonassessable Water Quality Fund -- $194,000). The total estimated cost of this project including the requested amount is $194,000. This project is anticipated to be completed during the 2025 construction season.
ADA ramps for 2025 High impact paving north-side projects: (ST216240111) File Number 240614: Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund - $1,225,000). The total estimated cost of this project including the requested amount is $1,300,000. This project is anticipated to be completed during the 2025 construction season.
ADA ramps for 2025 High impact paving south-side projects: (ST216240112) File Number 240614: Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund - $925,000). The total estimated cost of this project including the requested amount is $1,000,000. This project is anticipated to be completed during the 2025 construction season.
Work by Done by Contractor/Paving. (WT410240750) File Number 231298: Water main alterations. (Nonassessable Water Fund Budget Line 6410 -- $500,000 additional funds). The total estimated cost of this project including the requested amount is $700,000. This project is anticipated to be completed during the 2025 construction season.
now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck
NFR 7 Sub
1/24/2025