File #: 110916    Version: 0
Type: Resolution Status: Passed
File created: 11/2/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/30/2011
Effective date:    
Title: Resolution relative to the cost participation and installation of traffic control devices in conjunction with the Federal and State Aid paving of North Port Washington Avenue from North Dr. Martin Luther King Jr. Drive to the North City Limit in the 6th Aldermanic District at a total estimated cost of $86,718.20, with an estimated grantor share of $69,374.56, and an estimated City share of $17,343.64.
Sponsors: THE CHAIR
Indexes: TRAFFIC CONTROL SIGNALS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Agreement, 2. Project Cost Analysis, 3. Comptroller's Certificate, 4. Hearing Notice List, 5. Executed Agreement
Number
110916
Version
ORIGINAL
Reference
 
Sponsor
THE CHAIR
Title
Resolution relative to the cost participation and installation of traffic control devices in conjunction with the Federal and State Aid paving of North Port Washington Avenue from North Dr. Martin Luther King Jr. Drive to the North City Limit in the 6th Aldermanic District at a total estimated cost of $86,718.20, with an estimated grantor share of $69,374.56, and an estimated City share of $17,343.64.
Analysis
This resolution authorizes the Commissioner of Public Works and Comptroller to enter into a funding agreement with the Wisconsin Department of Transportation for installation of traffic control improvements in conjunction with the paving of North Port Washington Avenue from North Dr. Martin Luther King Jr. Drive to the North City Limit in the 6th Aldermanic Districts at a total estimated cost of $86,718.20, with an estimated grantor share of $69,374.56, and an estimated City share of $17,343.64, and to install these improvements upon execution of the agreement.  This resolution also authorizes the Comptroller to establish and transfer funds to the appropriate accounts for the project.  The total estimated cost of the entire project is $3,005,000, with a grantor share of $2,404,000 and a City share of $601,000.
Body
Whereas, The Project Agreement for the paving of North Port Washington Avenue from North Dr. Martin Luther King Jr. Drive to the North City Limit was approved by the Common Council under File Number 100021; and
 
Whereas, The Surface Transportation Program provides cost participation for traffic control improvements in conjunction with the paving of highways located on the Federal/State Aid Highway System; and
 
Whereas, The project will include the installation of new warranted traffic control signal at the intersection of North Port Washington Avenue and the eastbound West Capitol Drive ramps; and
 
Whereas, The total estimated cost of this project is $86,718.20 for the alteration and upgrade of traffic control signals and the upgrade of traffic control signs; and
 
Whereas, Twenty percent of the participating costs, or $17,343.64, is not reimbursable and is included in the Division's 2011 Capital Purpose Project/Grant Number ST320110000; and
 
Whereas, Eighty percent of the participating project cost, or $69,374.56, is reimbursable from the Wisconsin Department of Transportation (WISDOT), and should be earmarked for this project in the 2011 Capital Grant and Aids Projects Fund Project/Grant Number SP032110100; and
 
Whereas,  The State cannot proceed with any project cost overruns and/or changes in scope of more than 5% without prior Department of Public Works approval; and    
 
Whereas, The Department of Public Works shall notify the Common Council of the City of Milwaukee at the next scheduled meeting of any such project cost overruns and/or changes in scope approved by the Department of Public Works; and
 
Whereas, The Common Council of the City of Milwaukee recognizes that the City may be 100% liable for any such project cost overruns and/or changes in scope as approved by the Department of Public Works; and
 
Whereas, The Common Council of the City of Milwaukee recognizes that the City may be liable for any costs incurred by the State should the City decide to withdraw from the project; now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works and the Comptroller are authorized to enter into a funding agreement and are directed to execute the contract with WISDOT for the installation of traffic control facilities in conjunction with the improvements to North Port Washington Avenue from North Dr. Martin Luther King Jr. Drive to the North City Limit with unit prices based on a predetermined estimate prepared under the Federal/State aided highway program, a copy of which is attached to this resolution, and is incorporated into this resolution as though set forth in full; and, be it
 
Further Resolved, That upon approval of this contract, that the Commissioner of Public Works is directed to install and modify traffic control facilities in conjunction with the improvements to North Port Washington Avenue from North Dr. Martin Luther King Jr. Drive to the North City Limit; and, be it
 
Further Resolved, That upon approval of this contract, the City Comptroller is hereby authorized to create within the Capital Grant and Aid Projects Fund the appropriate Project/Grant Chartfield Value for this project; and transfer to these accounts the amount required under the agreement and City accounting policy, but not to exceed a ten percent increase of the total amounts reserved for the grantor's share and local share or $5,000, whichever is greater as follows:
 
Location:
Project I.D.-2570-04-90
North Port Washington Avenue - North Dr. Martin Luther King Jr. Drive to the North City Limit
 
City of Milwaukee Share
Fund Number-0333
Project/Grant Number-ST320110000
$17,343.64
 
Grantor Reimbursable Cash - Traffic Control
Fund Number-0306
Project/Grant Number-SP032110100
$69,374.56
 
Total-$86,718.20
 
Previously Authorized for Traffic Control Improvements-$0
Current Estimated Cost of the Total Project Including this Resolution-$3,005,000
Original Estimated Cost of the Total Project (Common Council Resolution File Number 100021)-$2,505,000.
 
Requestor
Department of Public Works
Drafter
Infrastructure Services Division
RWB: ns
October 24, 2011
North Port Washington Avenue (MLK to North City Limits)