File #: 991497    Version:
Type: Resolution Status: Passed
File created: 1/18/2000 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/8/2000
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, STREET IMPROVEMENTS

NUMB:

991497

VERS:

SUBSTITUTE 1

XXBY:

THE CHAIR

TITL:

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations.

ANLS:

-Analysis-

 

This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.

BODY:

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Olive St. - N. 44th Pl. to N. 45th St. (RM52314014): New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading.

 

Parklawn Development Area bounded by W. Marion St., W. Hope Ave., N. Sherman Blvd., N. 47th St. (WK68320007/RE17190216): Installing storm and sanitary sewers.

 

N. 44th Pl. - W. Hope Ave. to W. Olive St. (RM52314014): New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading.

 

N. 45th St. - W. Olive St. to W. Marion St. (RM52314014): New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading.

 

N. 45th Pl. - W. Hope Ave. to W. Olive St. (RM52314014): New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading.

 

Alley between W. Hope Ave., W. Olive St., N. 44th Pl., N. 45th St. (RM52314014): Concrete alley construction and grading.

 

Alley between W. Marion St., W. Olive St., N. 44th Pl., N. 45th St. (RM52314014): Concrete alley construction and grading.

 

Alley between W. Marion St., W. Olive St., N. 45th St., N. 45th Pl. (RM52314014): Concrete alley construction and grading.

 

5th Aldermanic District

 

N. 92nd St. - W. Elmore Ct. (Ext'd) to W. Melvina St. (SM495000405): Relaying storm sewer. (Nonassessable Relief and Relay Sewer Fund -- $6,600)

 

6th Aldermanic District

 

N. Dr. Martin Luther King Jr. Dr. - 128 ft. m/l south of W. Ring St. to 324 ft. m/l north of W. Concordia Ave. (SM495000255): Relay combined sewer.

 

12th Aldermanic District

 

W. St. Paul Ave. - N. 10th St. to N. 12th St. (SM495000402): Relaying combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $6,100)

 

13th Aldermanic District

 

S. 13th St. (East Side) - W. College Ave. to a point 750 feet m/l north of W. College Ave. (ST210000101): Concrete walk construction. (Nonassessable New Paving Fund -- $1,000)

 

17th Aldermanic District

 

W. Vine St. - N. 22nd St. to N. 26th St. (SM495000404): Relaying combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $20,000)

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

DFTR:

INFRASTRUCTURE SERVICES DIVISION

CAW:lmh

02-3-2000- Deleted 4th Ald. Dist. per B. Russo.