Title: Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites, various areas and school sites and appropriating funds for these purposes with the city construction cost estimated to be $1,205,000 for a total estimated cost of these projects being $1,250,000.
Sponsors: THE CHAIR
Indexes: SIDEWALKS

Number

171856

Version

Substitute 1

Reference

171478

Sponsor

THE CHAIR

Title

Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites, various areas and school sites and appropriating funds for these purposes with the city construction cost estimated to be $1,205,000 for a total estimated cost of these projects being $1,250,000.

 

Analysis

To provide the necessary authority for sidewalk repairs at Scattered Sites, various areas and school sites.  The City cost of these projects approved by this resolution is estimated to be $1,205,000.  The total estimated cost of these projects is $1,250,000.

 

Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and

 

Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:

 

2018 Scattered Sites (ST230180156) File Number 171478 :  Laying concrete walk.  Doing all necessary grading pertaining to said work.  (Assessable Sidewalk Reconstruction Paving Fund -- $50,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $385,000).  The total estimated cost for this project including the requested amount is $450,000.  This project is anticipated to be completed during the 2018 construction season.

 

Area bounded by W North Av., N. 32nd St., W. Meinecke Av., and N. 35th St.; Area bounded by W. Mitchell St., S. 11th St., W. Becher St., and S. 13th St.; Area bounded by W. Cleveland Ave., S. 47th St., W. Oklahoma Ave., and S. 51st St.; and various schools (ST230180155) File Number 171478:  Laying concrete walk.  Doing all necessary grading pertaining to said work.  (Assessable Sidewalk Reconstruction Paving Fund -- $200,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $570,000).  The total estimated cost for this project including the requested amount is $800,000.  This project is anticipated to be completed during the 2018 construction season.

 

Resolved, That said Commissioner of Public Works is authorized to proceed with said work in accordance with said report pursuant to Section 66.0704 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work.

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Dee laBelle

Sidewalk Replacement 2018

03/28/2018

 

Technical Correction

Molly Kuether-Steele