File #: 021620    Version:
Type: Resolution Status: Passed
File created: 3/4/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/25/2003
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. cover letter.pdf, 3. SUB 1 FISCAL NOTE.pdf

 

Number

021620

Version

SUBSTITUTE 1

Reference

020020

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

Alley between W. Hope Ave., W. Marion St., W. Sercombe Rd., N. 36th St., and N. 39th St. (Except North-South Leg) (ST212030112) File Number 020020:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $28,700; Nonassessable Alley Paving Fund -- $33,700)

 

2nd and 9th Aldermanic Districts

 

N. 64th St. – W. Villard Ave. to W. Silver Spring Dr. (ST211030104) File Number 020390:  Asphalt pavement resurfacing, sidewalk and driveway approaches where needed, sodding and grading. (Assessable Reconstruction Paving Fund -- $133,200; Nonassessable Reconstruction Paving Fund -- $107,900)

 

N. 64th St. – W. Silver Spring Dr. to W. Kaul Ave. (ST211020116) File Number 020390:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $265,800; Nonassessable Reconstruction Paving Fund -- $167,700)

 

3rd Aldermanic District

 

E. Keefe Ave. – N. Bremen St. to a point 125 feet m/l east of N. Weil St. (ST211030132) File Number 021133:  Replace all curb and gutter, replace sidewalk where needed, sodding and grading. (Assessable Reconstruction Paving Fund -- $9,000; Nonassessable Reconstruction Paving Fund -- $20,000)

 

8th Aldermanic District

 

Alley between W. Lapham St., S. Layton Blvd., W. Orchard St., and S. 26th St. (ST21210129) File Number 970181:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $63,800; Nonassessable Alley Paving Fund -- $25,000)

 

10th Aldermanic District

 

Alley between W. Keefe Ave., W. Townsend St., N. 35th St., and N. 36th St. (ST212030135) File Number 020729:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $46,100; Nonassessable Alley Paving Fund -- $20,000)

 

Alley between W. Melvina St., W. Vienna Ave., N. 26th St., and N. 27th St. (ST212030121) File Number 011691:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, tree removal and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $68,300; Nonassessable Alley Paving Fund -- $25,000)

 

12th Aldermanic District

 

Alley between S. Cesar E. Chavez Dr., W. Mineral St., W. Walker St., and S. 15th St. (ST212020115) File Number 000779:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $62,300; Nonassessable Alley Paving Fund -- $20,000)

 

;and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances, and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That projects: Alley W. Hope Ave. (ST212030112), N. 64th St. (ST211030104), N. 64th St. (ST211020116), and E. Keefe Ave. (ST211030132) will be billed after January 1, 2005, and that projects: Alley W. Lapham St. (ST21210129), Alley W. Keefe Ave. (ST212030135), Alley W. Melvina St. (ST212030121), and Alley S. Cesar E. Chavez Dr. (ST212020115) will be billed after January 1, 2006, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following projects be deleted from the 2003 Paving Program.

 

7th Aldermanic District

 

Alley between W. Keefe Ave., W. Townsend St., N. 55th St., and N. 56th St.  (ST212030130) File Number 960740

 

8th Aldermanic District

 

S. 31st St. – W. Cleveland Ave. to a point 40 feet m/l south of W. Forest Home Ave. (ST211000109) File Number 85-727

 

9th Aldermanic District

 

W. Good Hope Rd. – A point east of N. 51st St. to N. 76th St. (ST210020103) File Number 021622

 

12th Aldermanic District

 

W. Bruce St. – S. 5th St. to S. 9th St. (ST211030114) File Number 020390

 

13th Aldermanic District

 

Alley between W. Morgan Ave., W. Wilbur Ave., S. 14th St., and S. 15th St. (Southerly 550 feet m/l) (ST212030127) File Number 891874

 

16th Aldermanic District

 

S. 60th St. – W. Adler St. to W. Dixon St. (ST211030117) File Number 020390

 

S. 76th St. – The South City Limits (South of W. Main St.) to W. Kearney St. (ST211030105) File Number 020390

 

17th Aldermanic District

 

Alley between W. Juneau Ave., W. McKinley Ave., N. 21st St., and N. 22nd St. (ST212020123) File Number 001024

 

Requestor

Infrastructure Services Division

Drafter

mld:lk