Title: Resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $8,315,000 for a total estimated cost of these projects being $8,596,000.
Sponsors: THE CHAIR

Number

251491

Version

ORIGINAL

Reference

250902

Sponsor

THE CHAIR

Title

Resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $8,315,000 for a total estimated cost of these projects being $8,596,000.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $8,315,000.  The total estimated cost of these projects is $8,596,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

1st Aldermanic District

 

N. 39th St. - W. Fairmount Ave. to W. Lancaster Ave. (SM495250048) File Number 250902: Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $204,000).  The total estimated cost of the project including the requested amount is $219,000.  This project is anticipated to be completed during the 2026 construction season.

 

4th and 8th Aldermanic District

 

16th Street Viaduct over the Menomonee River (BR100260108) Expansion joint replacement. (City Share Non-assessable Structure Fund - $600,000).  The total estimated cost for this project is $600,000. This project is anticipated to be completed during the 2026 construction season.

 

16th Street Viaduct over the Menomonee River (BR100260109) Bent 23 floorbeam replacement (City Share Non-assessable Structure Fund - $750,000).  The total estimated cost for this project is $750,000. This project is anticipated to be completed during the 2026 construction season.

 

6th Aldermanic District

 

N. 6th St. - 250’+/- South of W. Vienna Ave. to W. Vienna Ave. (SM495250044) File Number 250756: Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $97,000).  The total estimated cost of the project including the requested amount is $109,000.  This project is anticipated to be completed during the 2026 construction season.

 

8th Aldermanic District

 

27th Street Viaduct (400 North) (BR100260107) Bridge expansion joint replacement. (City Share Non-assessable Structure Fund - $1,000,000).  The total estimated cost for this project is $1,000,000.  The project is anticipated to be completed during the 2026 construction season. 

 

31st Street Pedestrian Bridge (2700 South) over the UPRR (BR100260109) Bridge removal. (City Share Non-assessable Structure Fund - $300,000).  The total estimated cost for this project is $425,000.  This project is anticipated to be completed during the 2027 construction season.

 

W. Orchard St. - S. 41st St. to S. 42nd St. (SM495250045) File Number 250756: Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $110,000).  The total estimated cost of the project including the requested amount is $122,000.  This project is anticipated to be completed during the 2026 construction season.

 

12th Aldermanic District

 

16th St Bridge over Kinnickinnic River (2700 South 16th Street) (BR100250116) Channel Repairs following 2025 Flood Event. (Non-assessable Structure Fund - $250,000).  The total estimated cost for this project is $250,000. This project is anticipated to be completed during the 2026 construction season.

 

13th Aldermanic District

 

S. 13th St. - 300’+/- South of W. Edgerton Ave. to 250’ South of W. Goldcrest Ave. (SM495250072) File Number 251287:  Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $620,000). The total estimated cost of the project including the requested amount is $640,000.  This project is anticipated to be completed during the 2026 construction season.

 

15th Aldermanic District

 

N. 23rd St. - 140’ North of W. McKinley Ave. to 240’ North of W. McKinley Ave. (SM495250046) File Number 250902: Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $44,000). The total estimated cost of this project including the requested amount is $56,000.  This project is anticipated to be completed during the 2026 construction season.

 

Various Districts

 

Bridge Expansion Joint Replacement at Multiple Bridges (BR100260106): Bridge Expansion Joint Replacement at Multiple Bridges (City Share Non-assessable Structure Fund - $100,000).  The total estimated cost for this project is $100,000.  The project is anticipated to be completed during the 2026 construction season. 

 

Movable Bridge Upgrades (BR100260105): Movable bridge mechanical, hydraulic, and electrical upgrades (City Share Non-assessable Structure Fund - $75,000).  The total estimated cost for this project is $75,000.  The engineering is anticipated to be completed during the 2026 construction season. 

 

Miscellaneous Bridge Capitol Repairs (BR100260104): Bridge Maintenance construction repairs to various projects. (City Share Non-assessable Structure Fund - $150,000).  The total estimated cost for this project is $150,000.  This project is anticipated to be completed during the 2026 construction season. 

 

Citywide

 

2026 Indirect Account. (SM495260001) (Nonassessable Sewer Maintenance Relay Fund --$800,000). The total estimated cost of this project including the requested amount is $800,000. This project is anticipated to be completed during the 2026 construction season.

 

2026 Paving Coordination. (SM495260002) (Nonassessable Sewer Maintenance Relay Fund --$200,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2026 construction season.

 

2026 Sanitary Manhole Inspections. (SM494260001) (Infiltration/Inflow Reduction Fund -- $200,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2026 construction season.

 

2026 Sewer Exam Requests. (SM495260003) (Nonassessable Sewer Maintenance Relay Fund --$150,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2026 construction season.

 

2026 Sewer Repairs. (SM495260006) (Nonassessable Sewer Maintenance Relay Fund --$150,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2026 construction season.

 

2026 Sewer Survey Requests. (SM495260005) (Nonassessable Sewer Maintenance Relay Fund --$500,000). The total estimated cost of this project including the requested amount is $500,000. This project is anticipated to be completed during the 2026 construction season.

 

2026 Sewer Work Prior to Paving. (SM495260500) (Nonassessable Sewer Maintenance Relay Fund --$1,250,000). The total estimated cost of this project including the requested amount is $1,250,000. This project is anticipated to be completed during the 2026 construction season.

 

Water Repairs/Distribution Referred. (WT410260840) File Number 251490: Water main repairs. (Nonassessable Water Fund Budget Line 6410 -- $110,000).  The total estimated cost of this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2026 construction season.

 

Work by Milwaukee Water Works Prior to Paving. (WT410260730) File Number 251490: Water main alterations. (Nonassessable Water Fund Budget Line 6410 -- $35,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2026 construction season.

 

Work by Done by Contractor/Paving. (WT410260750) File Number 251490: Water main alterations. (Nonassessable Water Fund Budget Line 6410 -- $560,000). The total estimated cost of this project including the requested amount is $600,000.  This project is anticipated to be completed during the 2026 construction season.

 

Work by Done by Contractor/Sewer Alterations. (WT410260770) File Number 251490: Water main alterations. (Nonassessable Water Fund Budget Line 6410 -- $60,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2026 construction season.

 

now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 