powered help
header-left header-center header-right
File #: 231569    Version:
Type: Resolution Status: Passed
File created: 2/6/2024 In control: COMMON COUNCIL
On agenda: Final action: 2/27/2024
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $35,000 for a total estimated cost of these projects being $1,145,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

231569

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $35,000 for a total estimated cost of these projects being $1,145,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $35,000 with the total cost estimated to be $1,145,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

11th Aldermanic District

 

S. 48th St. - W. Forest Home Ave. to W. Oklahoma Ave. (ST211180218) Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000, additional funding). The total estimated cost for this project including the requested amount is $250,000. These funds are to close out the project.

 

12th Aldermanic District

 

S. 14th St. - W. Becher St. to W. Forest Home Ave. (ST211200133) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (3’ width of tree border area), roadway narrowing, and grading. (Nonassessable Reconstruction Paving Fund -- $25,000 additional funding).  The total estimated cost for this project including the requested amount is $895,000.  These funds are to close out the project.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck/TW

NPR 8 Sub

2/9/2024