File #: 130600    Version:
Type: Resolution Status: Passed
File created: 9/4/2013 In control: COMMON COUNCIL
On agenda: Final action: 9/24/2013
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $7,835,500 for a total estimated cost of these projects being $9,191,100.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
9/27/20131 MAYOR SIGNED   Action details Meeting details Not available
9/24/20131 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
9/11/20131 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
9/11/20131 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
9/11/20130 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Mary Dziewiontkoski, Department of Public Works Proposed Substitute A was accepted.
Pass5:0 Action details Meeting details Not available
9/6/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/6/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/6/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/6/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/6/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/6/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/4/20130 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
130600
Version
Substitute 1
Reference
121420
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $7,835,500 for a total estimated cost of these projects being $9,191,100.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $7,835,500.  The total estimated cost of these projects is $9,191,100.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
 
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
 
1st Aldermanic District
 
Area bounded by W. Silver Spring Dr., W. Douglas Ave., N. 43rd St., and N. 27th St. (SM494120217) File Number 121420:  Sanitary Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $1,718,000).  The total estimated cost for this project including the requested amount is $1,738,000.  This project is anticipated to be completed during the 2013 construction season.
 
2nd and 5th Aldermanic Districts
 
W. Appleton Ave. - W. Capitol Dr. to N. 107th St. (WT410130009) File Number 121421:  Hydrant alteration.  (Nonassessable Water Fund Budget Line 5010 -- $8,000, Additional Funds; Nonassessable Water Fund Budget Line 6410 -- $57,000, Additional Funds).  The total estimated cost for this project including the requested amount is $169,500.  This project is anticipated to be completed during the 2013 construction season.
 
3rd Aldermanic District
 
N. Farwell Ave. - E. Ogden Ave. to E. Royall Pl. (SM495120310) File Number 111474:  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $91,000).  The total estimated cost for this project including the requested amount is $106,000.  This project is anticipated to be completed during the 2013 construction season.
 
3rd and 4th Aldermanic Districts
 
E. Royall Pl. - N. Farwell Ave. to N. Prospect Ave. (SM495130075) File Number 130599:  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $60,000).  The total estimated cost for this project including the requested amount is $72,000.  This project is anticipated to be completed during the 2014 construction season.
 
4th Aldermanic District
 
N. Cass St. - E. Mason St. to E. Wells St. (SM495130052) File Number 130599:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $107,000).  The total estimated cost for this project including the requested amount is $122,000.  This project is anticipated to be completed during the 2013 construction season.
 
N. Milwaukee St. - E. St. Paul Ave. to E. Clybourn St. (WT410130507) File Number 121749:  Hydrant alteration.  (Nonassessable Water Fund Budget Line 6410 -- $6,500, Additional Funds).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2013 construction season.
 
5th Aldermanic District
 
N. 100th St. - W. Grantosa Dr. to a point north of W. Congress St. (Sponsored by the City of Wauwatosa) (ST211130204) File Number 130599:  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $240,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2013 construction season.
 
6th Aldermanic District
 
E. Locust St. - N. Holton St. to N. Pierce St. (SM495130046) File Number 130362:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $288,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2013 construction season.
 
7th Aldermanic District
 
N. 32nd St. - W. Auer Ave. to 550 feet m/l north of W. Auer Ave. (SM495130050) File Number 130599:  Installing new storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $198,000).  The total estimated cost for this project including the requested amount is $213,000.  This project is anticipated to be completed during the 2013 construction season.
 
N. 33rd St. - W. Auer Ave. to 550 feet m/l north of W. Auer Ave. (SM495130051) File Number 130599:  Installing new storm sewer and relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $212,000).  The total estimated cost for this project including the requested amount is $228,000.  This project is anticipated to be completed during the 2013 construction season.
 
8th and 12th Aldermanic Districts
 
W. Mitchell St. - S. 19th St. to S. 20th St. (SM495130037) File Number 130362:  Combined large diameter sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $298,000).  The total estimated cost for this project including the requested amount is $310,000.  This project is anticipated to be completed during the 2013 construction season.
 
S. 19th St. - W. Burnham St. to W. Mitchell St. (SM495130036) File Number 130362:  Combined large diameter sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $268,000).  The total estimated cost for this project including the requested amount is $283,000.  This project is anticipated to be completed during the 2013 construction season.
 
10th Aldermanic District
 
N. Story Pkwy. - 120 feet east of N. Pinecrest St. to Parkway Dr. (SM495120088) File Number 120702:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $1,366,000).  The total estimated cost for this project including the requested amount is $1,386,000.  This project is anticipated to be completed during the 2013 construction season.
 
Zoo Interchange (SM495130015) File Number 130028:  Sewer work prior to paving.  (Nonassessable Sewer Maintenance Relay Fund -- $2,000, Additional Funds).  The total estimated cost for this project including the requested amount is $2,600.  This project is anticipated to be completed during the 2013 construction season.
 
11th Aldermanic District
 
Area bounded by W. Forest Home Ave., W. Cold Spring Rd., S. 48th St., and S. 84th St. (SM494120214) File Number 121420:  Sanitary Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $2,351,000).  The total estimated cost for this project including the requested amount is $2,371,000.  This project is anticipated to be completed during the 2013 construction season.
 
12th Aldermanic District
 
E. Greenfield Ave. - S. 1st St. to 1,470 feet east of S. Barclay St. (WT410120003) File Number 111025:  (Nonassessable Water Fund Budget Line 6410 -- $325,000, Additional Funds).  The total estimated cost for this project including the requested amount is $850,000.  This project is anticipated to be completed during the 2013 construction season.
 
13th Aldermanic District
 
S. 6th St. Corridor permeable pavement demonstration project (ST211130202) File Number 130599:  Laying concrete walk and driveway.  Doing all necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2013 construction season.
 
14th Aldermanic District
 
E. Estes St. - S. Shore Dr. to S. Superior St. (SM495130038) File Number 130362:  Combined large diameter sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $93,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2013 construction season.
 
S. Whitnall Ave. - 130 feet north of E. Holt Ave. to E. Holt Ave. (WT410130013) File Number 130235:  Relaying water main.  (Nonassessable Water Fund Budget Line 6410 -- $28,000, Additional Funds).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2013 construction season.
 
Various Aldermanic Districts
 
Asphalt surface - various streets (north side) (ST211130182) File Number 121754:  (Nonassessable Reconstruction Paving Fund -- $30,000, Additional Funds)  The total estimated cost for this project including the requested amount is $455,000.  This project is anticipated to be completed during the 2013 construction season.
 
City of Glendale
 
N. Port Washington Rd. - W. Olive St. to W. Hampton Ave. (SM494130204) File Number 130599:  Manhole adjustments.  (Nonassessable Sewer Maintenance Relay Fund -- $74,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2013 construction season.
 
now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Nfr 1
09/06/2013