Number
201552
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,201,000 for a total estimated cost of these projects being $25,574,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $2,201,000 with the total cost estimated to be $25,574,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st Aldermanic District
W. Glendale Ave. - N. 30th St. to N. 32nd St. (WT410220654) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $170,000. This project is anticipated to be completed during the 2022 construction season.
W. Hampton Ave. - N. 32nd St. to 250’ west of N. 32nd St. (WT410220633) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $65,000. This project is anticipated to be completed during the 2022 construction season.
W. Luscher Ave. - N. 42nd St. to (E/L) N. Sherman Blvd. (WT410220646) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $90,000. This project is anticipated to be completed during the 2022 construction season.
W. Sheridan Ave. - N. 51st Blvd. to N. 57th St. (WT410220615) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $485,000. This project is anticipated to be completed during the 2022 construction season.
W. Stark St. - N. 42nd St. to N. 46th St. (WT410220647) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; (Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $325,000. This project is anticipated to be completed during the 2022 construction season.
N. 31st St. - W. Atkinson Ave. to W. Glendale Ave. (WT410220655) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $60,000. This project is anticipated to be completed during the 2022 construction season.
N. 32nd St. - W. Hampton Ave. to 200’ north of W. Hampton Ave. (WT410220634) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; (Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2022 construction season.
N. 42nd St. - W. Hampton Ave. to 300’ north of W. Stark St. (WT410220645) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2022 construction season.
N. 44th St. - W. Stark St. to 300’ north of W. Stark St. (WT410220648) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2022 construction season.
2nd Aldermanic District
N. 54th St./W. Maxwell Pl. - W. Capitol Dr. to W. Fond du Lac Ave. (WT410220672) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2022 construction season.
N. 75th Ct. - N. 75th St. to 135’ west of N. 75th St. (WT410220662) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $35,000. This project is anticipated to be completed during the 2022 construction season.
N. 75th St. - 350’ south of N. 75th Ct. to W. Tallmadge Pl. (WT410220661) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $170,000. This project is anticipated to be completed during the 2022 construction season.
N. 87th St. - W. Villard Ave. to W. Lawn Ave. (WT410220630) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $215,000. This project is anticipated to be completed during the 2022 construction season.
N. 90th St. - W. Villard Ave. to W. Rohr Ave. (WT410220631) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $165,000. This project is anticipated to be completed during the 2022 construction season.
3rd Aldermanic District
E. Park Pl. - N. Downer Ave. to N. Wahl Ave./N. Lake Dr. (WT410220667) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $310,000. This project is anticipated to be completed during the 2022 construction season.
4th Aldermanic District
E. Chicago St. - N. Water St. to N. Jackson St. (WT410220642) Relaying water main. Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $390,000. This project is anticipated to be completed during the 2022 construction season.
N. Jefferson St. - E. Chicago St to E. Buffalo St. (WT410220641) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $115,000. This project is anticipated to be completed during the 2022 construction season.
5th Aldermanic District
W. Burleigh St. - N. 88th St. to N.92nd St. (WT410220690) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $335,000. This project is anticipated to be completed during the 2022 construction season.
W. Fairmount Ave. - W. Appleton Ave. (W/S) to N. 89th St. (WT410220679) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $125,000. This project is anticipated to be completed during the 2022 construction season.
W. Fiebrantz Ave. - N. 82nd St. to N. 84th St. (WT410220677) Water main extension.
(Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $170,000. This project is anticipated to be completed during the 2022 construction season.
W. Grantosa Dr. - 225’ east of N. 100th St. to N. 100th St. (WT410220614) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000).The total estimated cost of this project including the requested amount is $65,000. This project is anticipated to be completed during the 2022 construction season.
W. Olive St. - N. 85th St to N. 88th St. (WT410220674) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $235,000. This project is anticipated to be completed during the 2022 construction season.
W. Potomac Ave. - N. 86th St. to 70’ north of W. Fairmount Ave. (WT410220682) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $315,000. This project is anticipated to be completed during the 2022 construction season.
W. Stark St. - W. Appleton Ave. to west side of N. 91st St. (WT410220681) Relaying water main. Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $455,000. This project is anticipated to be completed during the 2022 construction season.
N. 79th St. - W. Capitol Dr. to W. Hope Ave. (WT410220678) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $350,000. This project is anticipated to be completed during the 2022 construction season.
N. 83rd St. - W. Capitol Dr. to W. Hope Ave. (WT410220676) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $320,000. This project is anticipated to be completed during the 2022 construction season.
N. 85th St. - W. Capitol Dr. to W. Olive St. (WT410220673) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $310,000. This project is anticipated to be completed during the 2022 construction season.
N. 86th St.( south line) -- W. Locust St. to (S/L) W. Burleigh St. (WT410220692) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $320,000. This project is anticipated to be completed during the 2022 construction season.
N. 88th St. - N. Colgate Cir. To W. Marion St. (WT410220675) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2022 construction season.
N. 88th St. - W. Hampton Ave. to W. Potomac Ave. (WT410220683) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $300,000. This project is anticipated to be completed during the 2022 construction season.
N. 89th St. - W. Capitol Dr. to W. Fairmount Ave. (WT410220680) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $310,000. This project is anticipated to be completed during the 2022 construction season.
N. 89th St. - 475’ south of W. Burleigh St. to W. Burleigh St. (WT410220691) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $140,000. This project is anticipated to be completed during the 2022 construction season.
N. 90th St. - W. Hampton Ave. to 425’ north of W. Stark St. (WT410220684) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; (Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $265,000. This project is anticipated to be completed during the 2022 construction season.
N. 98th St. - W. Metcalf Pl. to W. Lisbon Ave. (WT410220652) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2022 construction season.
N. 100th St. - W. Capitol Dr. to W. Grantosa Dr. (WT410220600) Relaying water main.
(Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $285,000. This project is anticipated to be completed during the 2022 construction season.
N. 100th St. - W. Nash St. to W. Lisbon Ave. (WT410220651) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $440,000. This project is anticipated to be completed during the 2022 construction season.
5th 7th and 8th Aldermanic Districts.
Bioswales for projects that are Pedestrian and Transit Improvement Projects (SM499210014 ) (Nonassessable Water Quality Fund -- $10,000) The total estimated cost of this project including the requested amount is $110,000. This project is anticipated to be completed during the 2021 construction season.
6th Aldermanic District
N. Booth St. - E. Nash St. to E. Vienna Ave. (WT410220670) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $175,000. This project is anticipated to be completed during the 2022 construction season.
E. Clarke St. - N. 1st St. to N. Hubbard St. (WT410220649) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $160,000. This project is anticipated to be completed during the 2022 construction season.
N. Fratney St. - E. Vienna Ave. to E. Capitol Dr. (WT410220669) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $295,000. This project is anticipated to be completed during the 2022 construction season.
W. Locust St. - N. 11th Ln. to N. 13th St. (WT410220671) Relaying water main. Lead Replacement of Service. Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $105,000. This project is anticipated to be completed during the 2022 construction season.
E. Vienna Ave. - N. Richards St. to N. Humboldt Ave. (WT410220668) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $655,000. This project is anticipated to be completed during the 2022 construction season.
N. 9th St. - W. Vliet St. to W. Somers St. (WT410220629) Relaying water main.
Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $110,000. This project is anticipated to be completed during the 2022 construction season.
7th Aldermanic District
W. Roosevelt Dr. (south side) -- N. Sherman Blvd. to N. 47th St. (WT410220632) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $375,000. This project is anticipated to be completed during the 2022 construction season.
W. Ruby Ave. - N. 36th St. to N. Sherman Blvd. (SM499210016) Installing pavers. (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $20,000). The total estimated cost of this project including the requested amount is $379,000. This project is anticipated to be completed during the 2021 construction season.
N. 51st Blvd. - W. Congress St. to W. Hampton Ave. (WT410220650) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $575,000. This project is anticipated to be completed during the 2022 construction season.
8th Aldermanic District
W. Pierce St. - S. Cesar Chavez Dr. to S. 23rd St. (WT410220620) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $39,000).The total estimated cost of this project including the requested amount is $615,000. This project is anticipated to be completed during the 2022 construction season.
W. Pierce St. - S. 35th St. to S. 36th St. (WT410220643) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $80,000. This project is anticipated to be completed during the 2022 construction season.
S. 35th St. - 150’ north of W. Pierce St. to W. Pierce St. (WT410220644) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $40,000. This project is anticipated to be completed during the 2022 construction season.
9th Aldermanic District
W. Acacia St. - N. 77th St. to N. 80th St. (WT410220623) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $275,000. This project is anticipated to be completed during the 2022 construction season.
N. Burbank Ave. - W. Casper St. to W. Green Tree Rd. (WT410220621) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $95,000. This project is anticipated to be completed during the 2022 construction season.
W. Casper St. - N. 77th St. to N. 78th St. (WT410220625) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $65,000. This project is anticipated to be completed during the 2022 construction season.
N. 78th St. - W. Acacia St. to W. Casper St. (WT410220624) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $245,000. This project is anticipated to be completed during the 2022 construction season.
N. 84th St. - W. Mill Rd. to N. Burbank Ave. (WT410220622) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $610,000. This project is anticipated to be completed during the 2022 construction season.
10th Aldermanic District
N. Hawley Rd. - W. Vliet St. to W. Galena St. (WT410220653) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $185,000. This project is anticipated to be completed during the 2022 construction season.
11th Aldermanic District
W. Holt Ave. - S. 84th St. to S. 88th St. (WT410220687) Relaying water main. Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $340,000. This project is anticipated to be completed during the 2022 construction season.
W. Morgan Ave. - S. 84th St. to S.92nd St. (WT410220685) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $690,000. This project is anticipated to be completed during the 2022 construction season.
W. Oklahoma Ave. (north side) -- S. 70th St.(extended) to S. 72nd St. (WT410220639) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $115,000. This project is anticipated to be completed during the 2022 construction season.
S. 72nd St. - W. Bennett Ave. to W. Oklahoma Ave. (WT410220640) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2022 construction season.
S. 91st St. - 105’ north of W. Morgan Ave. to W. Morgan Ave. (WT410220686) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $35,000. This project is anticipated to be completed during the 2022 construction season.
11th and 13th Aldermanic Districts
Alley bounded by West Euclid Avenue, West Ohio Avenue, South 24th Street, and South 25th Street; and on alley bounded by West Arthur Avenue, West Harrison Avenue, South 65th Street, South 66th Street and the city limits (North-South leg). (SM499210017) Installing Permeable pavers (Stormwater Quality - non assessable, -- $1,000). The total estimated cost for this project including the requested amount is $35,000. The project is anticipated to be completed in 2021.
12th Aldermanic District
W. Mitchell St. - S. 15th Pl. to S.16th St. (WT410220637) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $65,000. This project is anticipated to be completed during the 2022 construction season.
S. 15th Pl. - W. Odell St. to W. Mitchell St. (WT410220638) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2022 construction season.
S. 10th St. - W. National Ave. to W. Scott St. (WT410220619) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $380,000. This project is anticipated to be completed during the 2022 construction season.
13th Aldermanic District
W. Carrington Ave. - S. 19th St. to S. 20th St. (WT410220710) Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $80,000. This project is anticipated to be completed during the 2022 construction season.
W. Denis Ave. - S. 14th St. to S. 15th Pl. (WT410220604) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $215,000. This project is anticipated to be completed during the 2022 construction season.
W. Henry Ave. - S. 23rd St. to S. 25th Ct. (WT410220703) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2022 construction season.
S. Honey Creek Dr. - W. Wanda Ave. to W. Parnell Ave. (WT410220697) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $265,000. This project is anticipated to be completed during the 2022 construction season.
W. Klein Ave. - S. 13th St. to S. 15th Pl. (WT410220602) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $290,000. This project is anticipated to be completed during the 2022 construction season.
W. Mangold Ave. - S. 18th St. to S. 20th St. (WT410220705) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2022 construction season.
S. Melinda St. - W. Wanda Ave. to S. Lorene Ave. (WT410220698) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $165,000. This project is anticipated to be completed during the 2022 construction season.
W. Parnell Ave. - S. Marilyn St. to W. Ramsey Ave. (WT410220695) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $44,000). The total estimated cost of this project including the requested amount is $780,000. This project is anticipated to be completed during the 2022 construction season.
W. Ramsey Ave. - S. 23rd St. to S. 27th St. (WT410220700) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $320,000. This project is anticipated to be completed during the 2022 construction season.
W. Tripoli Ave. - S. 20th St. to S. 24th St. (WT410220657) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $380,000. This project is anticipated to be completed during the 2022 construction season.
W. Wanda Ave. - S. 14th St. to S. 15th Pl. (WT410220603) Relaying water main.
(Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $215,000. This project is anticipated to be completed during the 2022 construction season.
W. Wanda Ave. - S. 33rd St. to S. 34th St. (WT410220694) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $70,000. This project is anticipated to be completed during the 2022 construction season.
W. Wilbur Ave. -- S. 20th St. to S. 23rd St. (WT410220658) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $305,000. This project is anticipated to be completed during the 2022 construction season.
S.14th St. - W. Grange Ave. to W. Klein Ave. (WT410220606) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $250,000. This project is anticipated to be completed during the 2022 construction season.
S. 15th Pl. - W. Denis Ave. to W. Wanda Ave. (WT410220605) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $70,000. This project is anticipated to be completed during the 2022 construction season.
S. 18th St. - W. Ramsey Ave. to W. Mangold Ave. (WT410220707) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $415,000. This project is anticipated to be completed during the 2022 construction season.
S. 19th Ct. - 240’ north of W. Mangold Ave. to W. Mangold Ave. (WT410220706) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 5010 -- $14,000). The total estimated cost of this project including the requested amount is $70,000. This project is anticipated to be completed during the 2022 construction season.
S. 19th St. - W. Henry Ave. to W. Kimberly Ave. (WT410220708) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $205,000. This project is anticipated to be completed during the 2022 construction season.
S. 20th St. - W. College Ave. to W. Wood Ave. (WT410220709) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $600,000. This project is anticipated to be completed during the 2022 construction season.
S. 20th St. - W. Ramsey Ave. to W. College Ave. (WT410220704) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $645,000. This project is anticipated to be completed during the 2022 construction season.
S. 20th Pl. - W. Tripoli Ave. to W. Howard Ave. (WT410220656) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $85,000. This project is anticipated to be completed during the 2022 construction season.
S. 22nd St. - W. Henry Ave. to W. Bridge St. (WT410220701) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $160,000. This project is anticipated to be completed during the 2022 construction season.
S. 23rd St. - W. Henry Ave. to W. Kimberly Ave. (WT410220702) Relaying water main. Water main extension (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $215,000. This project is anticipated to be completed during the 2022 construction season.
S. 23rd St. - W. Wilbur Ave. to 280’ south of W. Wilbur Ave. (WT410220660) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $80,000. This project is anticipated to be completed during the 2022 construction season.
S. 25th St. - 425’ north of W. Wilbur Ave. to W. Wilbur Ave. (WT410220659) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $120,000. This project is anticipated to be completed during the 2022 construction season.
S. 33rd St. - W. Wanda Ave. to W. Parnell Ave. (WT410220693) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $170,000. This project is anticipated to be completed during the 2022 construction season.
S. 36th Ct. - 215’ northeast of S. Melinda St. to S. Melinda St. (WT410220699) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $60,000. This project is anticipated to be completed during the 2022 construction season.
S. 37th Ct. - W. Parnell Ave. to 350’ south of W. Parnell Ave. (WT410220696) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2022 construction season.
14th Aldermanic District
S. Alabama Ave. - 120’ north of E. Wilbur Ave. to W. Tripoli Ave. (WT410220626) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $365,000. This project is anticipated to be completed during the 2022 construction season.
S. Herman St. - E. Saveland Ave. to E. Howard Ave. (WT410220628) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $245,000. This project is anticipated to be completed during the 2022 construction season.
E. Wilbur Ave. - S. Brust Ave. to Kansas Ave. (WT410220627) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $155,000. This project is anticipated to be completed during the 2022 construction season.
15th Aldermanic District
W. Cherry St. - N. 12th St. to N. 13th St. (WT410220663) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $95,000. This project is anticipated to be completed during the 2022 construction season.
W. Garfield Ave. - N. 47th St. to N. 49th St. (WT410220636) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $155,000. This project is anticipated to be completed during the 2022 construction season.
W. Kneeland St. - N. 13th St. to N. 14th St. (WT410220666) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $95,000. This project is anticipated to be completed during the 2022 construction season.
W. Walnut St. - N. 12th St. to N. 20th St. (WT410220001) Relaying water main. Hydrant alteration. Lead Replacement of Service (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $270,000. This project is anticipated to be completed during the 2022 construction season.
W. Walnut St. - N. 24th St. to N. 27th St. (WT410220616) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $310,000. This project is anticipated to be completed during the 2022 construction season.
N. 12th St. - W. Vliet St. to 215’ north of W. Cherry St. (WT410220664) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $195,000. This project is anticipated to be completed during the 2022 construction season.
N. 13th St. - W. Kneeland St. to W. Cherry St. (WT410220665) Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $65,000. This project is anticipated to be completed during the 2022 construction season.
N. 17th St. - W. Galena St. to W. Walnut St. (WT410220688) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2022 construction season.
N. 21st St. - W. Walnut St. to W. Barbee St. (WT410220689) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $105,000. This project is anticipated to be completed during the 2022 construction season.
N. 25th St. - W. Galena St. to W. Lisbon Ave. (WT410220617) Relaying water main.
Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $160,000. This project is anticipated to be completed during the 2022 construction season.
N. 26th St. - W. Galena St. to W. Vine St. (WT410220618) Relaying water main.
Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $325,000. This project is anticipated to be completed during the 2022 construction season.
N. 47th St. - W. Garfield Ave. to W. Lisbon Ave. (WT410220635) Relaying water main. Lead Replacement of Service. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $80,000. This project is anticipated to be completed during the 2022 construction season.
Various Aldermanic Districts
ADA ramps for 2021 High impact paving central projects: (ST216210109) Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund -- $50,000). The total estimated cost of this project including the requested amount is $1,000,000. This project is anticipated to be completed during the 2021 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/dl
Npr 10 Sub
03/11/2021