Number
180285
Version
SUBSTITUTE 1
Reference
Sponsor
THE CHAIR
Title
A substitute ordinance relating to permit fees for the installation of solar panels.
Section
200-33-5-g rn
200-33-5-g cr
200-33-11-yb rc
200-33-41.3 cr
Analysis
This ordinance changes the permit fees for electrical installations and repairs of solar panels from a per-kilowatt fee to a rated system. This ordinance also adds a permit fee for building inspection for installation of solar panels using the same rated system.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:
Part 1. Section 200-33-5-g of the code is renumbered 200-33-5-h.
Part 2. Section 200-33-5-g of the code is created to read:
200-33. Fees.
5. BUILDING PERMITS.
g. Solar PV. g-1. There shall be no building permit fee for the installation of a solar PV system on one- or 2-family dwellings not required to undergo structural reinforcement or alterations.
g-2. The building permit fees for installations of all other solar PVs shall be as follows:
g-2-a. 0-20 kilowatts: $70.
g-2-b. 20.1-35 kilowatts: $100.
g-2-c. 35.1-50 kilowatts: $150.
g-2-d. 50.1-75 kilowatts: $200.
g-2-e. 75.1-100 kilowatts: $250.
g-2-f. Over 100 kilowatts: $300.
Part 3. Section 200-33-11-yb of the code is repealed and recreated to read:
11. ELECTRICAL INSTALLATIONS AND REPAIRS.
yb. Solar PV:
yb-1. 0-20 kilowatts: $70.
yb-2. 20.1-35 kilowatts: $100.
yb-3. 35.1-50 kilowatts: $150.
yb-4. 50.1-75 kilowatts: $200.
yb-5. 75.1-100 kilowatts: $250.
yb-6. Over 100 kilowatts: $300.
Part 4. Section 200-33-41.3 of the code is created to read:
41.3. PLAN EXAMINATION, SOLAR PV. The fee for the examination of commercial solar PV building plans shall be $250 per system.
LRB
APPROVED AS TO FORM
____________________________
Legislative Reference Bureau
Date: ______________________
Attorney
IT IS OUR OPINION THAT THE ORDINANCE
IS LEGAL AND ENFORCEABLE
____________________________
Office of the City Attorney
Date: ______________________
Requestor
Erick Shambarger
Drafter
LRB 171063-2
Tea Norfolk
6/5/2018