Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $551,000 for a total estimated cost of these projects being $1,261,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $551,000. The total estimated cost of these projects is $1,261,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
4th Aldermanic District
E. Erie St. access road at the end of E. Erie St. to a point east. (ST214110105): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Developer Paving Fund -- $30,000). The total estimated cost for this project is $30,000. This project is anticipated to be completed during the 2011 construction season.
5th Aldermanic District
N. 103rd St. - W. Birch Ave. to W. Rae Ave. (ST214110104) File Number 110231: Install traffic calming devices. (Developer Paving Fund -- $5,000). The total estimated cost for this project is $5,000. This project is anticipated to be completed during the 2011 construction season.
11th Aldermanic District
S. 68th St. - W. Howard Ave. to W. Cleveland Ave. (Hot in place asphalt project) (ST211110180) File Number 110163: Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $500,000). The total estimated cost for this project including the requested amount is $510,000. This project is anticipated to be completed during the 2011 construction season.
13th Aldermanic District
S. 20th St. - The south City Limits to W. College Ave. (ST211020101) (Portions in the City of Oak Creek) (ST214110103) File Number 101349: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading. (City of Oak Creek Funds -- $16,000, Additional Funds). The total estimated cost for this project including the requested amount is $716,000. This project is anticipated to be completed during the 2011 construction season.
now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Nfr 14