File #: 110232    Version:
Type: Resolution Status: Passed
File created: 6/14/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/6/2011
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $551,000 for a total estimated cost of these projects being $1,261,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Proposed Substitute A, 2. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/11/20111 MAYOR SIGNED   Action details Meeting details Not available
7/6/20111 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
6/22/20111 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
6/22/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Clark Wantoch, Department of Public Works-Infrastructure Proposed Substitute B was accepted.
Pass4:0 Action details Meeting details Not available
6/22/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
6/20/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/20/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/20/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/14/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

110232

Version

Substitute 1

Reference

110231

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $551,000 for a total estimated cost of these projects being $1,261,000.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $551,000.  The total estimated cost of these projects is $1,261,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

4th Aldermanic District

 

E. Erie St. access road at the end of E. Erie St. to a point east. (ST214110105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Developer Paving Fund -- $30,000).  The total estimated cost for this project is $30,000.  This project is anticipated to be completed during the 2011 construction season.

 

5th Aldermanic District

 

N. 103rd St. - W. Birch Ave. to W. Rae Ave. (ST214110104) File Number 110231:  Install traffic calming devices.  (Developer Paving Fund -- $5,000).  The total estimated cost for this project is $5,000.  This project is anticipated to be completed during the 2011 construction season.

 

11th Aldermanic District

 

S. 68th St. - W. Howard Ave. to W. Cleveland Ave. (Hot in place asphalt project) (ST211110180) File Number 110163:  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $500,000).  The total estimated cost for this project including the requested amount is $510,000.  This project is anticipated to be completed during the 2011 construction season.

 

13th Aldermanic District

 

S. 20th St. - The south City Limits to W. College Ave. (ST211020101) (Portions in the City of Oak Creek) (ST214110103) File Number 101349:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading.  (City of Oak Creek Funds -- $16,000, Additional Funds).  The total estimated cost for this project including the requested amount is $716,000.  This project is anticipated to be completed during the 2011 construction season.

 

now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Nfr 14

06/20/2011