powered help
header-left header-center header-right
File #: 220284    Version: 0
Type: Resolution Status: Passed
File created: 6/21/2022 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/12/2022
Effective date:    
Title: Resolution authorizing the City Comptroller to transfer additional funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the design and real estate acquisition of South 70th Street Bridge over the Canadian Pacific Railroad and Hank Aaron State Trail in Aldermanic District 10 with a total estimated cost increase for the projects of $45,000, with an estimated Grantor share of $0, and an estimated City share of $45,000.
Sponsors: THE CHAIR
Indexes: BRIDGES, RAILROADS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Resolution Certification Comptroller"s Office

Number

220284

Version

ORIGINAL

Reference

 

Sponsor

THE CHAIR

Title

Resolution authorizing the City Comptroller to transfer additional funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the design and real estate acquisition of South 70th Street Bridge over the Canadian Pacific Railroad and Hank Aaron State Trail in Aldermanic District 10 with a total estimated cost increase for the projects of $45,000, with an estimated Grantor share of $0, and an estimated City share of $45,000.

Analysis

Resolution authorizing the City Comptroller to transfer additional funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the design and real estate acquisition of South 70th Street Bridge over the Canadian Pacific Railroad and Hank Aaron State Trail in Aldermanic District 10 with a total estimated cost increase for the projects of $45,000, with an estimated Grantor share of $0, and an estimated City share of $45,000.

Body

Whereas, design engineering work and real estate acquisition has resulted in an increased cost charged against various capital improvement projects; and

 

Whereas, Additional funds are, therefore, necessary to complete the construction of the projects; now, therefore be it

 

Resolved, By the Common Council of the City of Milwaukee, that the City Comptroller is hereby authorized to transfer fund to the project grant chart field as follows:

 

Project Grant Value

State ID 2656-00-02

BR320141501

Bridge Over Canadian Pacific Railroad

And Hank Aaron State Trail

 

City Share Non-Assessable Fund, Structure

BR320220000

Fund 0303

$45,000

 

Grantor Reimbursable Fund Paving

SP032220100

$0

 

Grantor Non-Reimbursable Fund Paving

$0

 

Estimated Total Engineering - $45,000

 

Total engineering previously authorized $424,380

Current estimated cost of total project including this resolution $3,182,710

Original estimated cost of total project (Resolution File Number 140427) $2,955,390

 

 

Requestor

Department of Public Works

Drafter

Infrastructure Services Division

DAVID J TAPIA: C. Murphy

June 15, 2022