File #: 130868    Version:
Type: Resolution Status: Passed
File created: 10/15/2013 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/5/2013
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $319,000 for a total estimated cost of these projects being $7,025,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/12/20131 MAYOR SIGNED   Action details Meeting details Not available
11/5/20131 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
10/22/20130 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A accepted. Individual present: Mary Dziewiontkoski - Dept. of Public Works
Pass4:0 Action details Meeting details Video Video
10/22/20131 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
10/17/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/17/20130 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/15/20130 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
130868
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $319,000 for a total estimated cost of these projects being $7,025,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $319,000 with the total cost estimated to be $7,025,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
 
3rd Aldermanic District
 
N. Water St. at E. Pearson St. (Marsupial bridge area access) (ST211140156):  ADA access ramps and intersection modification.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2014 construction season.
 
4th Aldermanic District
 
E. Knapp St. - N. Van Buren St. to N. Astor St. (SM495120115):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $183,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. Milwaukee St. - 65 feet m/l north of E. Clybourn St. to E. Clybourn St. (SM495130088):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $37,000.  This project is anticipated to be completed during the 2014 construction season.
 
5th Aldermanic District
 
W. Congress St. - N. 84th St. to N. 90th St. (WT410140684):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $15,000; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $460,000.  This project is anticipated to be completed during the 2014 construction season.
 
6th Aldermanic District
 
N. 10th St. - W. Nash St. to W. Capitol Dr. (WT410140689):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2014 construction season.
 
7th Aldermanic District
 
Area bounded by W. Congress St., W. Hampton Ave., N. 34th St., and N. 50th St. (SM494130205):  Sanitary Sewer lining.  (Infiltration/Inflow Reduction Fund -- $25,000).  The total estimated cost for this project including the requested amount is $2,290,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 44th St. - W. Center St. to W. Locust St. (SM495120108):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $453,000.  This project is anticipated to be completed during the 2014 construction season.
 
8th Aldermanic District
 
W. Arthur Ave. - S. 33rd St. to S. 35th St. (SM495120093):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $131,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Hayes Ave. - S. 33rd St. to S. 35th St. (SM495120092):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Pierce St. - S. 22nd St. to S. Layton Blvd. (SM495130087):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $374,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 34th St. - W. Arthur Ave. to W. Pabst Ave. (SM495120095):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $176,000.  This project is anticipated to be completed during the 2014 construction season.
 
10th Aldermanic District
 
W. Clybourn St. - 175 feet m/l east of N. 39th St. to N. 40th St. (SM495120101):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $141,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Wright St. - N. 56th St. to N. 57th St. (SM495120113):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $68,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 39th St. - W. Clybourn St. to W. Blue Mound Rd. (SM495120100):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 56th St. - 225 feet m/l south of W. Wright St. to W. Lisbon Ave. (SM495120112):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $169,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 68th St. - W. Center St. to W. Lisbon Ave. (SM495120090):  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $420,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 74th St. - W. Mt. Vernon Ave. to W. Blue Mound Rd. (SM495130089):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $62,000.  This project is anticipated to be completed during the 2014 construction season.
 
11th and 13th Aldermanic Districts
 
S. 27th St. - 725 feet m/l south of W. Cleveland Ave. (Union Pacific Railroad) to W. Morgan Ave. (SM495130035):  Relaying sanitary and storm sewers and lining.  (Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost for this project including the requested amount is $1,075,000.  This project is anticipated to be completed during the 2014 construction season.
 
12th Aldermanic District
 
S. 17th St. - 150 feet m/l south of W. Becher St. to W. Grant St. (SM495130086):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $103,000.  This project is anticipated to be completed during the 2014 construction season.
 
14th Aldermanic District
 
S. Chase Ave. Bridge (Kinnickinnic Bike Trail) - ADA access points:  E. Rosedale Ave. at S. Chase Ave., S. 5th Ct., and S. 6th St.; and E. Lincoln Ave. at S. 1st St. (ST211140155):  Sidewalk and path ramps.  (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2014 construction season.
 
City Wide
 
Pavement Management Analysis (PMA) RoadMatrix software maintenance and updates. (ST211130207):  (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $53,000.  This project is anticipated to be completed during the 2013-2014 construction season.
 
;and, be it
 
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Npr 3
10/18/2013