Skip to main content
powered help
header-left header-center header-right
File #: 241170    Version: 0
Type: Resolution Status: Passed
File created: 11/26/2024 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/17/2024
Effective date:    
Title: Resolution directing the Commissioner of Public Works to execute documents titled “State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation for the rehabilitation of the 9th Place Bridge over Union Pacific Railroad and to set up funds for design engineering at an estimated total cost of $95,200 with an estimated City share of $0 and a grantor share of $95,200.
Sponsors: THE CHAIR
Indexes: BRIDGES, INTERGOVERNMENTAL AGREEMENTS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Resolution Certification 2984-24-05.pdf, 2. 2984-24-05_75 CMil 9thPl.pdf

Number

241170

Version

ORIGINAL

Reference

Sponsor

THE CHAIR

Title

Resolution directing the Commissioner of Public Works to execute documents titled “State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation for the rehabilitation of the 9th Place Bridge over Union Pacific Railroad and to set up funds for design engineering at an estimated total cost of $95,200 with an estimated City share of $0 and a grantor share of $95,200.

Analysis

This Resolution also authorizes the Commissioner of Public Works to execute a Project Agreement with the Wisconsin Department of Transportation for rehabilitation of the 9th Place Bridge over Union Pacific Railroad (UPRR).  This resolution also directs the City Comptroller to transfer funds for preliminary engineering for this project.  The estimated total cost of the project is $496,400 with an estimated City share of $10,000 and a grantor share of $486,400.  The estimated preliminary engineering costs for the project is $95,200 with an estimated City share of $0, and a grantor share of $95,200.  Construction funds for these projects will be included in a future resolution.

Body

Whereas, A project agreement has been requested and received from the Wisconsin Department of Transportation (WisDOT) to be executed by the City of Milwaukee for the programming, design, and construction of the following bridge rehabilitation with Federal and State aid under the Local Bridge Program:

 

State I.D. 2984-24-05

9th Place

Bridge over UPRR B-40-0588

 

Whereas, The Department of Public Works shall notify the Common Council of the City of Milwaukee of project cost overruns and changes in scope approved by the Department of Public Works; and

 

Whereas, The Common Council of the City of Milwaukee recognizes that the City may be 100 percent liable for project cost overruns and changes in scope as approved by the Department of Public Works; and

 

Whereas, The Common Council of the City of Milwaukee recognizes that the City may be liable for any cost incurred by the State should the City decide to withdraw from the project; and

 

Whereas, Construction of the project is currently scheduled to start in 2028; and

 

Whereas, Construction funds for the project will be included in a separate resolution; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is hereby authorized to execute agreements for the programming, design, and construction of the aforementioned projects with Federal and State aid under the Local Bridge Program, copies of which are attached and are incorporated into this resolution by reference as though set forth in full; and, be it

 

Further Resolved, That the Commissioner of Public Works is hereby authorized to undertake or engage a consultant to undertake preliminary engineering for the improvement of the aforementioned projects and to reimburse the WisDOT for design engineering costs they incur from the improvement; and, be it

 

Further Resolved, that the Commissioner of Public Works is hereby authorized and directed to sign documents that are required if right-of-way acquisition is necessary as part of the project work; and, be it

 

Further Resolved, That the City Comptroller is hereby authorized to create within the Capital Improvement Fund, Grant and Aid Projects, the necessary Project Grant Chartfield Values for design engineering for the projects (Expenditure) and transfer to any of these accounts the amount required under the grant agreement and City Accounting Policy but not to exceed a 10 percent increase of the total amounts reserved for the grantor’s share and local share or $5,000, whichever is greater, as follows:

 

State I.D. 2984-24-05

9th Place

Bridge over UPRR B-40-0588

 

City Share Non-Assessable Fund Structure

BR300240000

Fund 0303

$0

 

Grantor Reimbursable Fund Structure

SP032240100

Fund 0306

$59,500

 

Grantor Non-Reimbursable Cash Fund Structure

$7,140

 

City Share Non-Assessable Fund Paving

ST320240000

Fund 0333

$0

 

 

Grantor Reimbursable Fund Paving

SP032240100

Fund 0306

$25,500

 

Grantor Non-Reimbursable Cash Fund Paving

$3,060

 

Total Estimated Engineering: $95,200

Previously authorized for preliminary engineering: $-0-

Current estimated cost of total project including this resolution: $496,400

Original estimated cost of total project: $496,400

 

Further Resolved, That the City Engineer is hereby authorized to approve and make periodic payments to the WisDOT upon receipt of invoices for the City’s share of the project costs.

Requestor

Department of Public Works

Drafter

Infrastructure Services Division

JONATHAN THOMAS:K. Vos

November 19, 2024