powered help
header-left header-center header-right
File #: 240366    Version: 0
Type: Resolution Status: Passed
File created: 7/2/2024 In control: COMMON COUNCIL
On agenda: Final action: 7/30/2024
Effective date:    
Title: Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $126,000 for a total estimated cost of these projects being $1,217,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

240366

Version

ORIGINAL

Sponsor

THE CHAIR

Title

Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $126,000 for a total estimated cost of these projects being $1,217,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $126,000 with the total cost estimated to be $1,217,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

12th Aldermanic District

 

W. Becher St. Interchange (SM499240030) Installing bioswales. (Nonassessable Water Quality Fund -- $20,000). The total estimated cost of this project is $300,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Lapham Blvd. - S. 1st St. to S. 16th St. (SM499230011) File Number 230577: Installing bioswales. (Nonassessable Water Quality Fund -- $75,000 additional funding). The total estimated cost of this project including the requested amount is $500,000. This project is anticipated to be completed during the 2025 construction season.

 

13th Aldermanic District

 

Area Bounded By - S. 6th St. to S. 24th St. and W. Waterford Ave. to W. Ramsey Ave. (SM495240028) Sewer exams. (Nonassessable Sewer Maintenance Relay Fund --$31,000). The total estimated cost of this project including the requested amount is $417,000. This project is anticipated to be completed during the 2024 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck

NPR 14 Sub

7/3/2024