Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $410,000 for a total estimated cost of these projects being $9,910,200.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. E-mail from constituent to Ald. Bohl re: 121st Bobolink Project, 3. Letter to ALd. Bohl & Email submitted at mtg 1-3-07, 4. Sub 1 Fiscal Note, 5. Sub 2 Fiscal Note
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
1/23/20072 MAYOR SIGNED   Action details Meeting details Not available
1/17/20072 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
1/3/20071 PUBLIC WORKS COMMITTEE AMENDED

Minutes note: Appearances by: Ald. Bohl, 5th Aldermanic District Clark Wantoch, Adiminstration & Transportation Design Manager, Dept. of Public Works Paula Black - Cadwell Banker Realty for the sale of property in the area of 121st & Bobolink Ave. Fredrick Anderson, Property owner of several lots in the area of 121st & Bobolink Ave. Oscar A. Froeblich, Jr., 12131 W. Bobolink Ave. Tim Erkander, 12031 W. Bobolink Ave. Linda Burke, Deputy City Attorney Anthony Robertson, 11941 W. Bobolink Ave. Ald. Puente moved to make letter and e-mail submitted by Ald. Bohl a part of the record. Ald. Witkowski moved to amend by holding the following items in the 5th Aldermanic District: W. Flagg St. (Extended) - 130 feet m/l west of N. 119th St. to N. 121st St. (SW170060109): Installing new sanitary and storm sewers. (Nonassessable Expansion of Capacity Sewer Fund -- $5,000). The total estimated cost for this project including the requested amount is $160,000. This project is anticipated to be completed during the 2007 construction season. N. 121st St. - A point 450 feet m/l south of W. Bobolink Ave. to W. Bobolink Ave. (ST210060101): Construct asphalt pavement, construct curb and gutter. Doing all the necessary grading pertaining to said work. (Nonassessable New Paving Fund -- $15,000). The total construction cost for this project including the requested amount is $110,000. This project is anticipated to be completed during the 2007 construction season. N. 121st St. - A point 450 feet m/l south of W. Bobolink Ave. to W. Bobolink Ave. (SW170060110): Installing new sanitary and storm sewers. (Nonassessable Expansion of Capacity Sewer Fund -- $5,000). The total estimated cost for this project including the requested amount is $157,000. This project is anticipated to be completed during the 2007 construction season.
Pass5:0 Action details Meeting details Not available
1/3/20072 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
12/21/20060 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/21/20061 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
12/14/20060 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/12/20060 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

061097

Version

SUBSTITUTE 2

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $410,000 for a total estimated cost of these projects being $9,910,200.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $410,000 with the total cost estimated to be $9,910,200.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

Alley between W. Hope Ave., W. Roosevelt Dr., N. 29th St., and N. 30th St. (ST21210122):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000, additional funds).  File Number 060138 authorized $4,600.  The total estimated engineering cost including this request is $14,600.  The total estimated cost for this project including the requested amount is $119,000.  This project is anticipated to be completed during the 2008 construction season.

 

2nd Aldermanic District

 

W. Florist Ave. - N. 68th St. to N. 76th St. (ST211070124):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $25,000, additional funds).  File Number 051444 authorized $50,000.  The total estimated engineering cost including this request is $75,000.  The total estimated cost for this project including the requested amount is $670,000.  This project is anticipated to be completed during the 2007 construction season.

 

W. Thurston Cr. - N. 76th St. to W. Silver Spring Dr. (ST211070137):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000, additional funds).  File Number 051328 authorized $9,000.  The total estimated engineering cost including this request is $13,000.  The total estimated cost for this project including this requested amount is 108,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 64th St. - W. Melvina St. to W. Capitol Dr. (ST211070117):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, additional funds).  File Number 051223 authorized $11,000.  The total estimated engineering cost including this request is $16,000.  The total estimated cost for this project including this requested amount is $103,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 74th St. - W. Hampton Ave. to W. Medford Ave. (ST211070104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $17,000, additional funds).  File Number 050224 authorized $16,000.  The total estimated engineering cost including this request is $33,000.  The total estimated cost for this project including this requested amount is $300,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 78th St. - W. Silver Spring Dr. to W. Florist Ave.  (ST211070138):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $36,000, additional funds).  File Number 060699 authorized $12,000.  The total estimated engineering cost including this request is $48,000.  The total estimated cost for this project including this requested amount is $396,000.  This project is anticipated to be completed during the 2008 construction season.

 

Alley between W. Fairmount Ave., W. Villard Ave., N. 83rd St., and N. 84th St. (ST21210111):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000, additional funds).  File Number 060372 authorized $7,600.  The total estimated engineering cost including this request is $22,600.  The total estimated cost for this project including this requested amount is $257,000.  This project is anticipated to be completed during the 2007 construction season.

 

2nd and 7th Aldermanic Districts

 

N. 51st Bl./St. - W. Keefe Ave. to W. Capitol Dr. (ST211070103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000, additional funds).  File Number 060842 authorized $25,000.  The total estimated engineering cost including this request is $45,000.  The total estimated cost for this project including this requested amount is $405,000.  This project is anticipated to be completed during the 2008 construction season.

 

2nd and 10th Aldermanic Districts

 

W. Melvina St. - N. 60th St. to N. 68th St. (ST211070136):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,500, additional funds).  File Number 051328 authorized $35,000.  The total estimated engineering cost including this request is $43,500.  The total estimated cost for this project including this requested amount is $394,000.  This project is anticipated to be completed during the 2007 construction season.

 

3rd Aldermanic District

 

E. Locust St. - N. Lake Dr. to N. Maryland Ave. (ST211060116):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000, additional funds).  File Number 060699 authorized $35,800.  The total estimated engineering cost including this request is $50,800.  The total estimated cost for this project including this requested amount is $470,000.  This project is anticipated to be completed during the 2008 construction season.

 

E. Wright St. - N. Humboldt Bl. to N. Holton St. (ST211070141):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $13,000, additional funds).  File Number 051328 authorized $17,000.  The total estimated engineering cost including this request is $30,000.  The total estimated cost for this project including this requested amount is $267,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. Warren Ave. - E. Brady St. to E. Boylston St. (ST211070140):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, additional funds).  File Number 060699 authorized $21,400.  The total estimated engineering cost including this request is $26,400.  The total estimated cost for this project including this requested amount is $245,000.  This project is anticipated to be completed during the 2007 construction season.

 

4th and 15th Aldermanic Districts

 

N. 13th St. - W. Highland Ave. to W. Galena St. (ST211070142):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, additional funds).  File Number 051444 authorized $38,000.  The total estimated engineering cost including this request is $43,000.  The total estimated cost for this project including this requested amount is $374,000.  This project is anticipated to be completed during the 2007 construction season.

 

5th Aldermanic District

 

N. 81st St. - W. Townsend St. to W. Nash St. (ST211070131):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000, additional funds).  File Number 051328 authorized $16,000.  The total estimated engineering cost including this request is $19,000.  The total estimated cost for this project including this requested amount is $165,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 85th St. - W. Auer Ave. to W. Townsend St. (ST211070112):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000, additional funds).  File Number 051223 authorized $20,000.  The total estimated engineering cost including this request is $24,000.  The total estimated cost for this project including this requested amount is $213,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 85th St. - W. Keefe Ave. to W. Vienna Ave. (ST211070108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, additional funds).  File Number 060842 authorized $14,000.  The total estimated engineering cost including this request is $21,000.  The total estimated cost for this project including this requested amount is $188,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 88th St. - W. Chambers St. to W. Burleigh St. (ST211070106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000, additional funds).  File Number 050224 authorized $6,000.  The total estimated engineering cost including this request is $10,000.  The total estimated cost for this project including this requested amount is $91,000.  This project is anticipated to be completed during the 2007 construction season.

 

5th and 10th Aldermanic Districts

 

W. Hadley St. - N. 74th St. to N. 76th St. (ST211070119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000, additional funds).  File Number 051223 authorized $10,000.  The total estimated engineering cost including this request is $12,000.  The total estimated cost for this project including this requested amount is $88,000.  This project is anticipated to be completed during the 2008 construction season.

 

6th Aldermanic District

 

N. Hubbard St. - E. North Ave. to E. Wright St. (ST211070110):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $12,000, additional funds).  File Number 050319 authorized $8,000.  These funds are to be transferred from ST210070110.  Total estimated engineering cost including this request is $20,000.  The total estimated cost for this project including this requested amount is $162,000.  This project is anticipated to be completed during the 2007 construction season.

 

6th and 15th Aldermanic Districts

 

W. Center St. (Excluding Structure) - N. Dr. Martin Luther King Jr. Dr. to N. 12th St. (ST211060111):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $23,000, additional funds).  File Number 060842 authorized $45,000.  The total estimated engineering cost including this request is $68,000.  The total estimated cost for this project including this requested amount is $528,000.  This project is anticipated to be completed during the 2007 construction season.

 

7th and 15th Aldermanic Districts

 

N. 24th St. - W. Center St. to W. Locust St. (ST211060119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000, additional funds).  File Number 050805 authorized $19,000.  The total estimated engineering cost including this request is $39,000.  The total estimated cost for this project including this requested amount is $166,000.  This project is anticipated to be completed during the 2008 construction season.

 

8th Aldermanic District

 

W. Dakota St. - S. 37th St. to S. 38th St. (ST211060151):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, additional construction funds).  Number 051538 authorized $39,200.  The total estimated cost for this project including this requested amount is $46,200.   This project is anticipated to be completed during the 2007 construction season.

 

W. Lapham St. - S. 34th St. to S. 35th St. (ST211070158):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000, additional funds).  File Number 060372 authorized $1,000.  The total estimated engineering cost including this request is $7,000.  The total estimated cost for this project including this requested amount is $62,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 38th St. - W. Burnham St. to W. Mitchell St. (ST211060157):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, additional funds).  File Number 050717 authorized $6,000.  The total estimated engineering cost including this request is $13,000.  The total estimated cost for this project including this requested amount is $119,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 41st St. - W. Orchard St. to W. Greenfield Ave. (ST211070145):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000, additional funds).  File Number 051444 authorized $4,000.  The total estimated engineering cost including this request is $6,000.  The total estimated cost for this project including this requested amount is $46,000.  This project is anticipated to be completed during the 2007 construction season.

 

8th and 11th Aldermanic Districts

 

S. 33rd St. - W. Lakefield Dr. to W. Oklahoma Ave. (ST211070126):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000, additional funds).  File Number 051328 authorized $10,000.  The total estimated engineering cost including this request is $12,000.  The total estimated cost for this project including this requested amount is $91,000.  This project is anticipated to be completed during the 2007 construction season.

 

9th Aldermanic District

 

W. Donna Dr. - N. Granville Dr. to N. 107th St. (ST211070113):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000, additional funds).  File Number 051223 authorized $24,000.  The total estimated engineering cost including this request is $30,000.  The total estimated cost for this project including this requested amount is $270,000.  This project is anticipated to be completed during the 2008 construction season.

 

W. Tower Ave. - N. 76th St. to N. 87th St. (ST211070139):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000, additional funds).  File Number 051328 authorized $61,000.  The total estimated engineering cost including this request is $76,000.  The total estimated cost for this project including this requested amount is $665,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 77th St. - W. Acacia St. to W. Green Tree Rd. (ST211070116):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,500, additional funds).  File Number 051223 authorized $20,000.  The total estimated engineering cost including this request is $23,500.  The total estimated cost for this project including this requested amount is $210,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 78th St. - W. Acacia St. to W. Casper St. (ST211070115):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000, additional funds).  File Number 051223 authorized $14,000.  The total estimated engineering cost including this request is $18,000.  The total estimated cost for this project including this requested amount is $158,000.  This project is anticipated to be completed during the 2008 construction season.

 

10th Aldermanic District

 

W. Wells St. - N. 44th St. to N. 45th Pl. (ST211070123):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, additional funds).  File Number 051444 authorized $6,000.  The total estimated engineering cost including this request is $11,000.  The total estimated cost for this project including this requested amount is $60,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 44th St. - W. Blue Mound Rd. to W. Wells St. (ST211070122):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $12,000, additional funds).  File Number 051444 authorized $14,000.  The total estimated engineering cost including this request is $26,000.  The total estimated cost for this project including this requested amount is $237,000.  This project is anticipated to be completed during the 2007 construction season.

 

N. 52nd St. - W. Locust St. to W. Burleigh St. (ST211070127):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000, additional funds).  File Number 051328 authorized $29,000.  The total estimated engineering cost including this request is $32,000.  The total estimated cost for this project including this requested amount is $264,000.  This project is anticipated to be completed during the 2008 construction season.

 

S. 91st St. - A point 300 feet m/l south of W. Adler St. to W. Adler St. (ST211070132):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000, additional funds).  File Number 051328 authorized $6,000.  The total estimated engineering cost including this request is $9,000.  The total estimated cost for this project including this requested amount is $43,000.  This project is anticipated to be completed during the 2007 construction season.

 

11th Aldermanic District

 

W. Georgia Ave. - W. Eden Pl. to S. Massachusetts Ave. (ST211070135):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000, additional funds).  File Number 051328 authorized $7,000.  The total estimated engineering cost including this request is $13,000.  The total estimated cost for this project including this requested amount is $116,000.  This project is anticipated to be completed during the 2008 construction season.

 

W. Ohio Ave. - S. 76th St. to S. 84th St. (ST211070107):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000, additional funds).  File Number 060842 authorized $32,000.  The total estimated engineering cost including this request is $52,000.  The total estimated cost for this project including this requested amount is $395,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 58th St. - S. 57th St. to W. Stack Dr. (ST211070111):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000, additional funds).  File Number 060372 authorized $8,000.  The total estimated engineering cost including this request is $10,000.  The total estimated cost for this project including this requested amount is $84,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 58th St. - W. Forest Home Ave. to W. Morgan Ave. (ST211070128):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000, additional funds).  File Number 051328 authorized $18,000.  The total estimated engineering cost including this request is $21,000.  The total estimated cost for this project including this requested amount is $190,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 58th St. - W. Morgan Ave. to a point north of W. Ohio Ave. (ST211070129):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000, additional funds).  File Number 051328 authorized $21,000.  The total estimated engineering cost including this request is $25,000.  The total estimated cost for this project including this requested amount is $224,000.  This project is anticipated to be completed during the 2007 construction season.

 

S. 64th St. - W. Stack Dr. to W. Fremont Pl. (ST211070130):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,500, additional funds).  File Number 051328 authorized $9,000.  The total estimated engineering cost including this request is $11,500.  The total estimated cost for this project including this requested amount is $92,000.  This project is anticipated to be completed during the 2007 construction season.

 

12th Aldermanic District

 

W. Burnham St. - S. 5th St. to S. 6th St. (ST211060126):  Paving the roadway with asphalt.  Replacing all concrete curb and gutter.  Laying concrete sidewalk and driveway approaches where necessary.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, additional construction funds).  File number 051441 authorized $84,000.  The total estimated cost for this project including this requested amount is $91,000.   This project is anticipated to be completed during the 2007 construction season.

 

13th Aldermanic District

 

W. Denis Ave. - S. 23rd St. to S. 26th St. (ST211070133):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000, additional funds).  File Number 051328 authorized $12,000.  The total estimated engineering cost including this request is $15,000.  The total estimated cost for this project including this requested amount is $135,000.  This project is anticipated to be completed during the 2007 construction season.

 

14th Aldermanic District

 

S. Herman St. - A point south of E. Norwich St. to E. Howard Ave. (ST21110137):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000).  The total estimated cost for this project including this requested amount is $150,000.  This project is anticipated to be completed during the 2007 construction season.

 

E. Norwich St. - S. Kansas Ave. to S. Nevada St. (Portions in the City of St. Francis) (ST21110139):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including this requested amount is $184,000.  This project is anticipated to be completed during the 2007 construction season.

 

Alley between S. Ellen St., S. Kinnickinnic Ave., and E. Rusk Ave. (ST212060117):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $3,000, additional funds).  File Number 040689 authorized $10,000.  The total estimated engineering cost including this request is $13,000.  The total estimated cost for this project including this requested amount is $163,000.  This project is anticipated to be completed during the 2008 construction season.

 

15th Aldermanic District

 

Alley between W. Garfield Ave., W. Lloyd St., N. 37th St., and N. 38th St. (ST21210113):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,500, additional funds).  File Number 041565 authorized $10,700.  The total estimated engineering cost including this request is $13,200.  The total estimated cost for this project including this requested amount is $106,000.  This project is anticipated to be completed during the 2008 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

apr5 - 2