Number
100724
Version
ORIGINAL
Reference
100495
Sponsor
THE CHAIR
Title
Resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $1,515,000 for a total estimated cost of these projects being $2,886,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $1,515,000. The total estimated cost of these projects is $2,886,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
3rd Aldermanic District
E. North Ave. Sinkhole (SM495100160) File Number 100495: (Nonassessable Sewer Maintenance Relay Fund -- $1,200,000, Additional Funds). The total estimated cost for this project including the requested amount is $2,200,000. This project is anticipated to be completed during the 2010 construction season.
7th and 10th Aldermanic Districts
N. 51st Blvd. - W. Burleigh St. to W. Roosevelt Dr. (SM495070182) File Number 091344: Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $310,000, Additional Funds). The total estimated cost for this project including the requested amount is $680,000. This project is anticipated to be completed during the 2011 construction season.
11th Aldermanic District
S. 60th St. at W. Cold Spring Rd. Intersection (Sponsored by the City of Greenfield) (ST211100162) File Number 100723: Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost for this project including the requested amount is $6,000. This project is anticipated to be completed during the 2010 construction season.
; now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Nfr 3
10/05/2010
Clerical Correction - 10/25/10- tb