File #: 040202    Version:
Type: Resolution Status: Passed
File created: 6/15/2004 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/7/2004
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. Cover Letter.pdf, 3. Sub 1 Fiscal Note.pdf
 
Number
040202
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
3rd Aldermanic District
 
Alley between N. Bartlett Ave., E. Hartford Ave., N. Newhall St., and E. Newport Ave. (ST212050144) Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $5,000)
 
10th Aldermanic District
 
Alley between N. Hi Mount Blvd., W. Lloyd St., W. Vine St., and N. 49th St. (ST212050145):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $6,000)
 
 
11th Aldermanic District
 
S. 50th St. - W. Tesch Ave. to W. Van Beck Ave. (ST211050128):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,500)
 
S. 52nd St. - W. Tesch Ave. to W. Norwich St. (ST211050134):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000)
 
13th Aldermanic District
 
Alley between W. Euclid Ave., W. Oklahoma Ave., S. 23rd St., and S. 24th St. (ST212030133):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,500)
 
15th Aldermanic District
 
Alley between W. Garfield Ave., W. Hi Mount Ave., W. Lloyd St., and N. 49th St. (ST212050146):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $3,000)
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
mld:lk
apr13
06/23/04
 
Aldermanic District change corrected, per Ald. Dudzik, 7/20/04.  mbh